Laserfiche WebLink
12 <br />I <br />INSULATION <br />BAFFLE <br />INSULATION PER - <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYER TYPE 1(#15) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />-SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />w PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />>< <br />co <br />FOR MORE INFO <br />w <br />16" O.C. 2X S.P.F. STUDS <br />o = <br />W/ (4)16d TOENAILS TO TOP PLATE <br />O <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />Z. <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2)10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />J <br />M w <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL = <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />g R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALS <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />ER PLAN <br />0 <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" — <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' 0/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN —� <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />STD. 90 HOOK (SEE DETAIL) <br />8"1 CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />C) 4"x4" INSPECTION PORT AT <br />w a EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. a o- AT GARAGE CONTRACTOR <br />BASEBOARD N TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 4"to 6" BELOW GRADE <br />c <br />d a . <br />2!! FINISH GRADE ib <br />m--I i—I 11=I I <br />I —I � I —I 1 _I 1 I III d _—_�-m 00 <br />6x6 W1.4xW1.4 I II I I I M1 I I —I I I —I I I I I I MI I I —I I I —I I I- C)z T <br />WWF OR FIBERMESH I� II I II I II I I I II I d I I II I II II I II I111- <br />I —I I �I I III III —I I I <br />I — <br />111=III—III=III- <br />�II, ; ,III III' \--STD. 90"HOOK <br />(3) # 5 REBAR ON 3" CHAIR (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2-STORY WALL SECTION ,1 <br />SCALE:3/4"=1'-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />STUDF,,. <br />2nd FLOOR W, <br />BEAM/GIRDER <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD A / <br />2nd FLOOR WALL <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />,TE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1Od @ 6" O.C. <br />NOTES: " USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN • INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />O/C FOR THE 1ST 2'1 OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1'-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1"' ^ <br />2"x BOT. PLATE <br />(2) 1 Od @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSc <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION. <br />TR <br />RIBBONS <br />DETAIL (FLOOR TRUSS) 60 <br />SCALE: 1 1/2"=1'-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION <br />(1) ROW OF 2x BLOCKING @ MID <br />HGT. FOR WALL HGT. 5 8'-611. (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />PTS FOR WALL HGT. > 8'1 <br />SIMPSON SP1 w/ (10) 10d <br />NAILS AT EA. STUD <br />2 x STUDS @ 16" O.C. <br />2X P.T. PLATE <br />SEE SHEATHING <br />SPECS ON FLOOR <br />-1/2" GYP. W.B. MIN. @ <br />GARAGE SIDE IF APPLICABLE <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ <br />2"DIA.X 3/16" PLATE WASHER <br />(MIN. SHEAR 3500#. MIN. <br />TYPICAL TENSION 2600#.) <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />a: <br />FFTF- <br />zo <br />s Idill I II i 11 I <br />III, I I II I II I 1 1 11=1 I 1 111 11111 (3) #5 CONT. ON 3" <br />8" 1'-8" 8" CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rS <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />w <br />w <br />0 <br />0 <br />co <br />B <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />x <br />PROVIDE <br />x <br />BLOCKING AS <br />REQUIRED PER <br />D <br />o SECTION X-X IF <br />ui NOT FULL <br />H HEIGHT SHEET <br />C <br />Z <br />z <br />G <br />FLOOR <br />SYST <br />M <br />(2)- 2x TOP PLATE <br />�l BEYOND I <br />15,32" OSB <br />4-1 <br />EXPOSURE 1 <br />F <br />SHEATHING w <br />x <br />SOLID 2x <br />C <br />BLOCKING @ ALL o <br />C <br />SHEATHING 0 <br />EDGES (SEE U) <br />OPENING <br />SECTION X-X <br />a0 <br />C <br />x <br />l w <br />x <br />E <br />w <br />2x STUDS <br />BEYOND. <br />SEE PLAN o <br />O <br />cn <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IAIA1 1 r1 ri/nr1^K11 riAriARA <br />3/8" "S" -NAIL 3/8" <br />SPACING <br />S 3/4" S 1/2" <br />s 1/2" <br />S 1/2" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VER77CAL BLOCKING <br />SECTION X-X <br />SF A�Np%L <br />�N <br />2x CRIPPLES @ — <br />16" O.C. W/ (2) 12d <br />TOENAILS Ti <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x — <br />CRIPPLE STUD <br />TYPICAL (U.N.0) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM Y8" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />w <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />J <br />PENETRATE SURFACE MORE THANY8". <br />u) <br />? <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />0© <br />NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />T <br />Il = <br />@ NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />0 w <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />U) <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />o <br />w/ 8d COMMON NAIL <br />J <br />w 0 <br />F PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />LL ¢ O <br />¢ cl O 'n <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />ai 0- m LL ' <br />@ (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N w 0 0 ~ <br />MEMBER IF GABLE END <br />`✓ LL <br />NOTE: <br />WALL SHEATHING INSTALL. <br />C . <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />/ 1 <br />S4 <br />BOX HEADER <br />ONLY <br />oFNiFR�oR <br />Nc <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"1 OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/1 x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />`t WWF OR FIBERMESH <br />d. d. <br />CV ':° <br />co <br />a . <br />- <br />III —III a <br />11 <br />.III I <br />III=III= <br />(3) # 5 REBAR ON 3" CHAIR 4" Viiii <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4' 1'-0" <br />ADDITIONAL INFORMATION. <br />M <br />S6 <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131"X 21/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />Ti <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'1 <br />(3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />- PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />-2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />- APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 1Od NAILS <br />- AT EA. STUD <br />-2X P.T. PLATE <br />- WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />III I' oZ <br />T 5; SEP 0 0 2022 <br />VIRTL AL RE` <br />cS=��, aI1C. <br />Vi�i;�r I Pd\g'e A. <br />plans Rev. ,_- ��/ � c;er1� .,I ' ""d and i T 1prov <br />for cc,rnplia co � , tl, 2020 rT am': <br />E-difion by Debra w,nn1~ Kiahr F'X230 <br />L►1�; <br />f <br />I <br />V <br />�NLID <br />h <br />00 <br />LID <br />r <br />! tf <br />Z <br />2 <br />O <br />w <br />4 1 <br />4 <br />0' <br />� <br />Z <br />Q <br />Ln (D L0 E <br />0 <br />'0 C? <br />(�') N - <br />N <br />(n co <br />V 0 O 0O 0 - <br />t co <br />w <br />t O <br />O O <br />jrn�! � O <br />O 0 <br />VN Q <br />—t u60, } <br />�tn <br />V w Qv <br />4�L_0E" <br />70 t) 11 <br />W <br />W <br />0 LLI Uj w 0 1- <br />H~ a�J �QYzD_ <br />� 0 O<< U 0 0 0 <br />of <br />Q Q U <br />coJLL <br /><00x Z�LL_0Z20C,I-¢Q <br />E- <br />OcAw§OZOw00-crmZz U <br />cn d U) w w C0 <br />(0 Q z <br />Q<¢OwQ�Zwz°�V0a <br />�I-I �wz Q <br />Li <br />Ow <br />Ow 0 0Q O¢ <br />LL Q O ¢ <br />E-- U- <br />;I� <br />O <br />O <br />z W <br />O� <br />(n O <br />U) COES F2 C:)Q LO <br />u) ti <br />L(� <br />I—ofQCC.M <br />- <br />0-:>: <br />Z CU <br />z <br />W <br />wo <br />J <br />O <br />d- <br />I <br />I <br />I <br />! <br />I <br />I <br />f <br />I <br />f <br />I <br />I <br />I <br />o <br />CN <br />0 <br />0 <br />C3 <br />0 <br />0 <br />N <br />N <br />0 <br />N <br />N <br />N <br />O <br />— <br />� <br />N <br />�m <br />00 <br />C) <br />0) <br />CD- <br />O <br />N <br />C3 <br />I <br />f <br />, <br />Z <br />O <br />C) <br />0 <br />0 <br />0 <br />I <br />I <br />Lo0-1 <br />> <br />00 <br />Z� <br />Vi <br />QZ <br />O <br />Zw <br />-4-a <br />W <br />4-1 <br />WOO <br />U � <br />p <br />ow— <br />z <br />Oro <br />aka <br />W_ <br />Ln <br />= <br />W=w <br />(7 <br />f-12 <br />N <br />Zoff <br />. . N <br />O <br />Zoo <br />z <br />C) <br />aZu_ <br />z <br />rJ7 Z <br />U <br />J <br />W <br />Q <br />z <br />z <br />w <br />h WS6 <br />J <br />o <br />C14 <br />O <br />> <br />LAST PLOT DATE <br />Z O <br />STRUCTURAL <br />-- <br />DETAILS - MONO <br />