_ _ __ 1 _ _ ,._I .. _ _ u u LL'LLI=bt W.. _...- a... Ilc .. .y � El6. � W .I .. _ _ .... L 1 I I .. I I UI I d � .. '.I. IM 16W YII�'.Y, 1u11111. RI®I _-. �_. Y W � d ..1. 1 WI YI•Y1�N•Mf•M�Y�•IY+•NsWYYtYYIWLLL � _ 1 I 8.:.. / .6 ! IIY Y FI Y III, :: .. I.I I :, x III .: ' : .R I YYIII• ILLNIYF •Y#. F YIM 1 / � .F Wkk� W'LRLL .J! hILLilL,:L.I l r L I I�ILII�YII IIllIL1NfiL ILI 91l NII , Y -1 __..___ ___. 11 :. L III : ! I LIYI 4..W,IY III Y IYI I I ! J II 11 - � d i » 11 . __.11 .1111! 1 - t, rgl�YnL fb ll INNS DIM #HNYNI YLFNW. Y1Lr1•� WIWY114U•YPL+YW+Y•WN41411�IY��IYI�ar1Y 1 .3lYdli� �LIEL _... �..._.4..1�:o,t1h1YLCY{1�Wi151�1111idLil'il, �.�.�1.._� .� 1 6' ldY�__ �....1.... ,1.. Wi ,I L ��.Jl k�.11,9VL..1t1�1J.11Ye.L1iI1�IfIt�IWLYlIJ11:�i11�1�Y�1�11' LLLllklllllllfrdq Ik
<br />s
<br />SHEATHING WRAP AND FLASHING:
<br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF:
<br />SECTION R103,1.3 WATER-RE515TIVE BARRIERS
<br />ALL SHEATHING WRAP MUST BE INTEGRATED WITH FLASHING
<br />MATERIALS. IT'S NOT ENOUGH TO WRAP A HOUSE, AND THEN TO
<br />SIMPLY X-CUT THE OPENINGS AND FOLD THE FLAPS INSIDE,
<br />FOLLOW THE GUIDELINES FROM THE DETAIL SHEETS WHEN
<br />INSTALLING ANY SHEATHING WRAP.
<br />ASPHALT -SATURATED FELT:
<br />COMMONLY AVAILABLE IN TWO WEIGHTS, ASPHALT FELT, OR
<br />"BLACK PAPER," 15 MADE FROM CORRUGATED PAPERS MIXED
<br />WITH SAWDUST AND AN ASPHALT RESIN.
<br />WHEN GPO05ING NO. 15 FELT, LOOK FOR MATERIAL RATED A5TM
<br />D4E69 OR A5TM D226 STANDARD, WHICH ENSURES A WEIGHT OF
<br />AT LEAST 11.5 LBS, PER SQUARE.
<br />PLASTIC HOUSE WRAP:
<br />PLASTIC HOU5EWRAP5 TYPICALLY MADE OF POLYOLEFIN
<br />FABRIC- EITHER POLYETHYLENE OR POLYPROPYLENE. THE
<br />PRIMARY DIFFERENCE IN HOU5EWRAP5 15 WHETHER OR NOT THEY
<br />ARE PERFORATED:
<br />I,) PERFORATED PRODUCTS ARE MADE FROM A VAPOR -TIGHT
<br />PLASTIC, AND THEN NEEDLE -PUNCHED TO ALLOW THE WRAP TO
<br />"BREATHE" (ALLOW VAPOR TO PA55 THROUGH), UNFORTUNATELY,
<br />THESE HOLE5 AL50 ALLOW LIQUID WATER TO SEEP THROUGH,
<br />PARTICULARLY WHEN THE 511DING IS PRE55ED TIGHT AGAINST IT,
<br />THE HOU5EWRAP WILL SLOW THE SEEPAGE BUT WILL NOT BLOCK
<br />IT ENTIRELY.
<br />2.) NON -PERFORATED HOU5EWRAP5 ARE MADE FROM PLASTIC
<br />FIBER THAT ALLOWS VAPOR TO PA55 BETWEEN THE FIBERS.
<br />THESE GENERALLY PERFORM MUCH BETTER THEN PERFORATED
<br />PRODUCTS AT IRE515TING LIQUID WATER, WHICH SHOULD BE
<br />CONSIDERED THEIR PRIMARY TASK.
<br />LEACHING:
<br />NOU5EWRAP5 ARE SUSCEPTIBLE TO DAMAGE FROM
<br />EXTRACTIVES THAT CAN LEACH FROM WOOD 51DING MATERIALS,
<br />PARTICULARLY CEDAR AND REDWOOD, TH15 CAN BE
<br />PREVENTED IN TWO WAYS:
<br />1.) INSTALL 51DING ON BATTENS TO CREATE AN AIR GAP, WHICH
<br />REDUCES CONTACT BETWEEN THE SHEATHING WRAP AND SIDING.
<br />2.) BACK -PRIME ALL WOOD 51DING MATERIALS, TH15 REDUCES
<br />LEACHING AND BLOCKS M015TURE FROM MOVING THROUGH THE
<br />51DING AND BLISTERING THE FINISH.
<br />INSTALLING SHEATHING WRAP:
<br />THE PRIMARY PURPOSE OF HOUSE WRAP 15 TO STOP WATER
<br />AIR -SEALING AND VAPOR CONTROL ARE SECONDARY.
<br />1,) USE SHEATHING WRAP OR FELT PAPER ON ALL HOUSES, NO
<br />MATTER WHAT KIND OF SIDING 15 USED.
<br />2.) THE WRAP SHOULD BE CONTINUOUS: AVOID A PATCHWORK OF
<br />SMALL PIECES. REVIEW FLASHING DETAILS, AS 50ME FLA5HING5
<br />(SUCH AS TP05E AROUND ELECTRICAL FIXTURES, MECHANICAL
<br />PENETRATIONS, ETC.) SHOULD BE INSTALLED CONCURRENT WITH
<br />SHEATHING WRAP.
<br />3.) LAP UNDER COURSES OF AOU5EWRAL OVER LOWER COURSES
<br />4 INCH AND LAP VERTICAL 5EAM512 INCHES. CODE REQUIRES A
<br />HORIZONTAL LAP OF 6 INCHES.
<br />4.) DO NOT X-GUT SHEATHING WRAP AT OPENINGS, INSTEAD, I -CUT
<br />THE SHEATHING WRAP, RUNNING THE KNIFE ALONG THE ROUGH
<br />OPENING AT THE HEAD OF THE SILL, AND THEN SLITTING
<br />VERTICALLY IN THE CENTER OF THE OPENING.
<br />5.) IF THE WALLS ARE LAPPED WHILE THEY ARE LYING ON THE
<br />DECK BEFORE STANDING THEM UP, BE SURE TO ADD A COURSE
<br />OF SHEATHING WRAP TO COVER THE RIM J015T, REMEMBER, TPI5
<br />COURSE MUST LAP UNDER THE SHEATHING WRAP ABOVE IT.
<br />(o.) ALWAYS WRAP GABLE ENDS. TH15 PART OF A HOUSE SEES A
<br />LOT OF EXPOSURE TO WIND -DRIVEN WATER
<br />1) App A SECOND LAYER OF SHEATHING WRAP ALONG IN51DE
<br />AND OUTSIDE HOUSE CORNERS, LAPPING AT LEAST 9 IN, (AN
<br />EVEN MULTIPLE OF 36-IN, WIDE ASPHALT FELT) ON EACH WALL,
<br />E.) CONTROL 5PLA5A5AGK BY SLOPING THE GRADE AROUND
<br />THE HOUSE AND KEEPING 51DING AT LEAST E INCHES ABOVE
<br />GRADE, AT DECKS AND STOOPS WHERE 5LLA5H5AGK MAY BE
<br />A PROBLEM, USE A WIDE PEEL -AND -STICK FLASHING MEMBRANE.
<br />MAKE SURE THE MEMBRANE LAPS UNDER THE SHEATHING WRAP
<br />ABOVE IT.
<br />9.) ALL FLASHING (FOR WINDOWS, DOORS, DECK LEDGERS,
<br />ELECTRICAL FIXTURES, VENT, PIPES, ANp CANTILEVERED
<br />BEAMS) MUST LAP UNDER THE 5NEATAING WRAP ABOVE IT, DO
<br />NOT RELY ON TAPE TO SEAL THE FLASHING.
<br />TAPING HOUSE WRAP
<br />MANUFACTURES OF PLASTIC HOU5EWRAP RECOMMENDED TAPING
<br />ALL 5EAM5 TO BLOCK AIR LEAKAGE THROUGH WALLS.
<br />TAPE SHOULD BE TYPE RECOMMENDED BY "51NGLE
<br />SOURCE" SYSTEM.
<br />50ME TAPE IS USEFUL FOR STOPPING WATER LEAKS BY
<br />REPAIRING RIPS (PARTICULARLY TEARS AROUND STAPLES) AND
<br />FOR SECURING THE WRAP TO FLASHING BEFORE THE SIDING 15 IN
<br />PLACE.
<br />DO NOT PATCH OVER HOU5EWRAP AND RELY ON THE
<br />5TICKINE55 OF THE TAPE TO SEAL THE PATCH. ALWAYS LAP
<br />HOUSEWRAP AND FLA5HING5 UNDER THE PIECE OF SHEATHING
<br />WRAP ABOVE.
<br />DRAINAGE PLANE:
<br />WEEP 5CREED5 AND CONTROL JOINTS CONTINUED:
<br />FINISH -GOAT THICKNE55:
<br />APPLYING SEALANT:
<br />FLASHING VENT PIPE PENETRATIONS:
<br />ALL STUCCO 5Y5TEM5 APPLIED OVER FRAMED
<br />OVER THE INTERSECTION BETWEEN DIFFERENT TYPES OF
<br />THE FIN15H COAT 15 ONLY ABOUT I/E INCH THICK, IT
<br />APPLY TO CLEAN DRY SURFACES. APPLICATION
<br />VENT PIPES ON WOOD AND ASPHALT ROOFS ARE
<br />5U55TRATE5 SHALL INCORPORATE A DRAINAGE PLANE
<br />CONSTRUCTION, SUCH AS THE JOINT BETWEEN WOOD
<br />SHOULD BE APPLIED AS EVENLY AS P0551BLE TO
<br />TEMPERATURE: 40 DEGREES TO 50 DEGREES, PREPARE
<br />USUALLY FLASHED USING A PRE ASSEMBLED METAL PAN
<br />FRAMING AND A BLOCK WALL.
<br />ENSURE UNIFORM DRYING.
<br />THE SURFACE U51NG THE FOLLOWING 5TRATEGIE5:
<br />WITH A RUBBER BOOT. ORDER THE UNIT ACCORDING TO
<br />SHEATHING WRAP FOR STUCCO:
<br />ON TALL WALLS AND LONG RUNS, APPLIED VERTICALLY
<br />SCRAPE, CHIP, OR BRUSH WITH A 5TIFF-BRI6TLE BRUSH,
<br />THE OUTSIDE DIAMETER OF THE VENT PIPE. FOR SLATE
<br />OR HORIZONTALLY TO BREAK UP WALL AREAS INTO
<br />AND DUST THE INSIDE OF THE JOINT, OR BLOW IT OUT WITH
<br />AND TILE ROOFS A MALLEABLE LEAD JACKET WILL LAST
<br />ALL STUCCO 5Y5TEM5 REQUIRE SHEATHING WRAP - THE
<br />SMALLER SECTIONS (LESS THAN 1E FEET).
<br />MIX PROPORTION5:
<br />COMPRESSED AIR
<br />LONGER,
<br />PREFERRED WAY 15 DOUBLE LAYERS OF HOUSE WRAP
<br />SIMILARLY, CASING BEAD AND CORNER BEAD HELP TO
<br />WIPE THE SURFACE WITH A STRONG SOLVENT, SUCH AS
<br />UNDER SELF -FURRED LATH. PAPER BACKED LATH
<br />CREATE EXPANSION JOINTS AT CRITICAL INTERSECTIONS:
<br />INCON515TENT MIXING WILL RESULT IN OBVIOUS
<br />ACETONE OR METHYL ETHYL KETONE, THESE SOLVENTS
<br />FLEXIBLE FLASHING MATERIALS:
<br />COULD BE USED AS THE SECOND LAYER.
<br />OUTSIDE CORNERS ARE BEST DETAILED WITH CORNER
<br />DIFFERENCES IN COLOR, TEXTURE, AND STRENGTH WHICH
<br />EVAPORATE WATER AND DISSOLVE GREASY 5U85TANCE6
<br />PAPER -BACKED LATH SHOULD NOT BE CONSIDERED A
<br />BEAD,
<br />CAN CAUSE THE BATCHES TO FAIL. MAKE EVERY EFFORT
<br />THAT CAN RETARD ADHESION.
<br />FLEXIBLE FLASHING- SELF -ADHERING BITUMINOUS
<br />SUBSTITUTE FOR WELL -DETAILED SHEATHING WRAP,
<br />TO KEEP MIX PROPORTIONS AND TIMES BETWEEN COATS
<br />TOOL EVERY CAULK JOINT. THE 5E5T TOOL 15 A STEEL
<br />TAPE-5HOULD BE USED TO FLASH ALL OF THE FOLLOWING:
<br />LAP LOWER GOUR5E5 OF SHEATHING WRAP UNDER UPPER
<br />INSIDE CORNERS SHOULD BE FLASHED WITH TWO LAYERS
<br />CON515TENT.
<br />SPATULA THAT IS SLIGHTLY SMALLER THAN THE WIDTH OF
<br />EXTERIOR DOOR SILLS: DECK LEDGERS: IN51DE AND OUTSIDE
<br />COURSES 50 WATER WILL DRAIN DOWN AND OUT, AND
<br />OF SHEATHING WRAP OR FLEXIBLE FLASHING, AND THEN
<br />MIX A MECHANICAL MIXER FOR MINUTES AFTER THE
<br />THE JOINT. ACHIEVE A SMOOTH, EVEN APPEARANCE
<br />CORNERS OF WALL SHEATHING: STUCCO SHELVES AND
<br />FLASH ALL OPENINGS, FOLLOWING THE FLASHING
<br />CA51NG BEAD SHOULD BE APPLIED VERTICALLY TO
<br />ADDITION OF THE LAST INGREDIENTS.
<br />WITHOUT SQUEEZE -OUT ON THE SIDES,
<br />PARAPETS: BELOW GRADE CONCRETE CRACKS: AND WALL
<br />GUIDELINES PER THE 6th EDITION (2011) FLORIDA
<br />CREATE AN EXPANSION JOINT. WHILE THE FLASHING
<br />.
<br />CUT THE NOZZLE OF THE TUBE AT AN ANGLE SLIGHTLY
<br />AREA SUBJECT TO 5PLA5145ACK,
<br />BUILDING CODE-RE5IDENTIAL.
<br />SERVES AS THE M05T IMPORTANT WATER SEALING
<br />SMALLER THAN THE SIZE OF THE JOINT,
<br />PROTECTION, THE JOINT BETWEEN THE TWO CA51NG BEADS
<br />CURING AND TIME BETWEEN STUCCO GOATS:
<br />IN COLD WEATHER, KEEP THE CAULK WARM, AL50 IT MAY
<br />FLEXIBLE FLA5HING5 COME IN SEVERAL VARIETIES, INCLUDING
<br />SHOULD HAVE BACKER ROD AND CAULKED WITH
<br />BE NECE55ARY TO HEAT THE 5URFAGE WITH A HEAT GUN.
<br />"PEEL -AND STICK" PRODUCTS, AS WELL AS NON-STICK
<br />INSTALLATION:
<br />HIGH -QUALITY URETHANE SEALANT, AS A FIRST LINE OF
<br />PROVIDE SUFFICIENT M015TURE IN THE PLASTER MIX OR
<br />TAKE DARE TO NOT STRIP THE PAINT OF START A FIRE.
<br />PRODUCTS,
<br />WHERE METAL PLASTER BASE WITH BACKING 15 USED, THE
<br />DEFENSE.
<br />BY M015T OR FOG CURING TO PERMIT CONTINUOUS
<br />VERTICAL AND HORIZONTAL LAP JOINTS SHALL BE WRB TO
<br />HYDRATION OF THE CEMENTITIOU5 MATERIALS. THE M05T
<br />ROOFING: FLASHING:
<br />RUBBERIZED FLA5HING5:
<br />WRB AND LATH TO FLANGE. LATH SHALL BE APPLIED WITH
<br />APPLY CA51NG BEAD (ALSO CALLED "J" BEAD), AT THE
<br />EFFECTIVE PROCEDURE FOR CURING AND TIME BETWEEN
<br />THE LONG DIMENSION AT RIGHT ANGLES TO THE SUPPORTS,
<br />JOINT BETWEEN ANY D1551MILAR MATERIALS - AROUND
<br />COATS WILL DEPEND ON CLIMATIC AND JOB CONDITIONS.
<br />LENGTH.
<br />SELF-ADHESIVE, RUBBERIZED ARE MADE FROM THE SAME
<br />UNLE55 OTHERWISE SPECIFIED.
<br />WINDOW FLANGES, WHERE STUCCO MEETS A BRICK
<br />MATERIALS AS THE EAVES MEMBRANES USED TO PREVENT ICE
<br />LATH SHALL NOT BE CONTINUOUS THROUGH CONTROL JOINTS
<br />CHIMNEY, OR AT THE TOP OF A WALL WHERE 5TUCCO
<br />SUFFICIENT TIME BETWEEN COATS SHALL BE ALLOWED TO
<br />TO AVOID EXCESSIVE EXPANSION AND CONTRACTION,
<br />DAM LEAKS. TYPICALLY AVAILABLE IN ROLLS FROM 4-12 IN,
<br />BUT SHALL BE STOPPED AND TIED AT EACH SIDE. LATH
<br />MEETS A SOFFIT OR FRIEZE BOARD. USE CONTROL JOINT
<br />PERMIT EACH COAT TO CURE OR DEVELOP ENOUGH
<br />USE E FOOT TO 10 FOOT LENGTHS OF METAL, MAXIMUM,
<br />WIDE (BUT SOMETIMES AVAILABLE UP TO 36 IN. WIDE), THESE
<br />SHALL BE ATTACHED TO FRAMING MEMBERS WITH
<br />OR EXPAN5ION JOINT AT MA5ONRY/FRAME WALL
<br />RIGIDITY TO RE515T CRACKING OR OTHER PHYSICAL
<br />FOR VALLEY FLASHING. AVOID U51NG ALUMINUM, WHICH
<br />FLEXIBLE FLA5HING5 CAN BE APPLIED DIRECTLY TO THE
<br />ATTACHMENTS SPACED NOT MORE THAN 1 INCHES ON
<br />CONNECTIONS,
<br />DAMAGE WHEN THE NEXT COAT IS APPLIED,
<br />EXPANDS AT A GREATER RATE THAN OTHER METALS.
<br />SHEATHING, AS LONG AS THE 5URFACE 15 WARM AND
<br />CENTERS ALONG SUPPORTS,
<br />LAP SECTIONS E INCHES MINIMUM.
<br />RELATIVELY CLEAN.
<br />I FOUNDATON WEEP SCREED SHALL BE INSTALLED AT THE
<br />TEXTURED FINISH OVER MASONRY: (STUCCO FINISH)
<br />THE TIMING BETWEEN COATS WILL VARY WITH CLIMATIC
<br />CONDITIONS AND TYPES OF PLASTER BASE.
<br />VALLEY CENTERLINE:
<br />THICKNE55 VARIES FROM 25- TO 60-MIL5. THE THINNER THE
<br />BOTTOM ALL FRAMED EXTERIOR WALLS, BELOW THE
<br />FLOOR LINE. WHERE WALL IS SUPPORTED BY A FLOOR OR
<br />TEXTURED FINISH SYSTEMS APPLIED IN ACCORDANCE
<br />TEMPERATURE AND RELATIVE HUMIDITY EXTEND OR
<br />MATERIAL, THE EASIER IT CAN BE FOLDED AND TUCKED
<br />FOUNDATION. GROUND OF WEEP SCREED SHOULD BE MIN. I"
<br />FOUNDATION.
<br />WITH A5TM FI 9H AND C 1063.
<br />REDUCE THE TIME BETWEEN CONSECUTIVE OPERATIONS,
<br />WHEN A STEEP ROOF INTER5ECT5 A SHALLOW ONE, WATER
<br />BENEATH SIDING, BUT AL50 THE EA51ER IT WILL TEAR AND
<br />OR MAX. 2" BELOW F.F.E.COLD
<br />OR WET WEATHER LENGTHENS AND HOT OR DRY
<br />CASCADING DOWN THE STEEP ROOF CAN OVERSHOOT
<br />DEGRADE IN THE SUNLIGHT,
<br />EXTERIOR PLASTER:
<br />WEATHER SHORTENS THE TIME PERIOD. MODERATE
<br />THE VALLEY AND RUN UP BENEATH THE SHINGLES ON THE
<br />LATH ATTACHMENT:
<br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF:
<br />CHANGES IN TEMPERATURE AND RELATIVE HUMIDITY CAN
<br />SHALLOW ONE. ROOFS LIKE TH15 NEED A VALLEY
<br />CLIMATE CAUTIONS:
<br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF:
<br />SECTION R103,12 PLASTER
<br />BE OVERCOME BY PROVIDING ADDITIONAL HEATING
<br />FLASHING WITH A CRIMPED CENTERLINE, THE STEEPER
<br />SECTION R103.1.1 LATH
<br />MATERIALS DURING COLD WEATHER AND BY REDUCING
<br />THE ROOF THE MORE CRITICAL THE CRIMP WILL BE,
<br />IN WARM TEMPERATURES, WHEN RUBBERIZED ASPHALT 15 THE
<br />RESISTANCE TO RAIN PENETRATION 15 IMPROVED WHERE
<br />THE ABSORPTION OF THE BASE BY PRE -WETTING DURING
<br />STICKIEST, IT IS NEARLY IMP0551BLE TO REPOSITION IT ONCE
<br />I. 51DE LAPS OF METAL PLASTER BA5E5 SHALL BE WIRE TIED.
<br />PLASTER HAS BEEN ADEQUATELY DEN51FIED DURING
<br />HOT OR DRY WEATHER
<br />EDGE TREATMENTS:
<br />THE FLASHING HAS TOUCHED THE SURFACE, MAKE SURE TO
<br />THEY SHALL BE ATTACHED BETWEEN SUPPORTS AT INTERVALS
<br />APPLICATION AND PROPERLY CURED. PLASTER SHALL
<br />DRY -FIT BEFORE PULLING THE RELEASE PAPER IT 15 AL50
<br />NOT MORE THAN 9 INCHES,
<br />O
<br />NOT, HOWEVER BE CONSIDERED TO BE "WATERPROOF('.
<br />IN ORDER TO PROVIDE MORE INTIMATE CONTACT AND
<br />LIKE ALL ROOF FLASHING, VALLEY FLASHING SHOULD
<br />VERY DIFFICULT TO HANDLE ALONE WHEN IT IS STICKY,
<br />,
<br />PREFABRICATED CONTROL JOINT MEMBERS SHALL
<br />BOND BETWEEN COATS AND TO REDUCE RAPID WATER
<br />HAVE HEMMED EDGES. NOT ONLY DO THESE SHED WATER
<br />2. EXPANDED METAL LATH SHALL BE LAPPED iz INCHES (12.1 mm)
<br />INSTALLED PRIOR TO THE APPLICATION OF PLASTER
<br />L055, THE SECOND COAT SHOULD BE APPLIED AS SOON
<br />MORE EFFECTIVELY, BUT HOLDING THE SHINGLE AWAY
<br />IN NOT TEMPERATURES, RUBBERIZED ASPHALT TENDS TO OOZE,
<br />MIN. AT THE SIDES. LAP METAL LATH I INCH (25 mm) AT ENDS,
<br />THE CREATION OF A GROOVE OR CUT IN PLASTER SHALL
<br />AS THE FIRST COAT 15 SUFFICIENTLY RIGID TO RE515T
<br />FROM THE FLASHING, THEY PREVENT CAPILLARY SUCTION
<br />MAKING IT ME55Y TO HANDLE. IN SUNBELT AREAS (OR
<br />WHERE END LAPS OCCUR BETWEEN THE FRAMING MEMBERS, THE
<br />NOT BE CONSIDERED A CONTROL OR EXPANSION JOINT.
<br />CRACKING, THE PRESSURES OF THE SECOND COAT
<br />FROM DRAWING THE WATER UP UNDER THE SHINGLE,
<br />WHEREVER 5URFACE TEMPERATURES MAY EXCEED IE0°F), AVOID
<br />ENDS OF THE SHEETS OF ALL METAL PLASTER BASES SHALL BE
<br />APPLICATION, AND THE LEVELING PROCESS.
<br />U51NG WITH METAL FLA5HING5: THE FLA5HING5 WILL COOK AND
<br />LACED OR WIRE TIED.
<br />RIDGE TREATMENT:
<br />THE A5PHAULT 50ON DRIES OUT,
<br />STUCCO: (THREE COAT)
<br />THE AMOUNT OF WATER AND THE TIMING FOR CURING
<br />3, WHERE METAL PLASTER BASE WITH BACKING IS USED, THE
<br />PORTLAND CEMENT PLASTER WILL VARY WITH THE
<br />VALLEYS THAT MEET AT A RIDGE SHOULD BE SOLDERED
<br />IN GOLD WEATHER, SELF-ADNEREING FLA5HING5 OFTEN DON'T
<br />VERTICAL AND HORIZONTAL LAP JOINTS SHALL BE WRB TO WRB
<br />TRADITIONAL THREE -COAT STUCCO CON515T5 OF THREE
<br />CLIMATIC CONDITIONS, THE TYPE OF BASE, AND USE OR
<br />TO ONE ANOTHER. HOWEVER TH15 CONNECTION MAY
<br />STICK WELL, CHECK THE MANUFACTURER'S MINIMUM APPLICATION
<br />AND LATH TO FLANGE,
<br />SEPARATE LAYERS OF CEMENT PLASTER MATERIALS:
<br />NON USE OF WATER -RETENTIVE ADMIXTURES,
<br />BREAK WHEN THE VALLEY METAL EXPANDS AND
<br />TEMPERATURE, SOME STICK IN TEMPERATURES BELOW 25' F, BUT
<br />A TROWEL -APPLIED SCRATCH COAT, WHICH 15 APPLIED
<br />CONTRACTS. BEST PRACTICE CALLS FOR COVERING THE
<br />M05T REQUIRE SURFACE TEMPERATURES OF 40°F OR GREATER
<br />4. BACKING SHALL BE LAPPED NOT LE55 THAN 2 INCHES (50 mm).
<br />OVER LATH AND GROOVED TO PROVIDE A KEY WAY FOR
<br />SOME M015TURE MUST BE RETAINED IN OR ADDED BACK
<br />CONNECTION AT THE RIDGE WITH A MOLDABLE PIECE OF
<br />ON WALLS, THE BACKING SHALL BE LAPPED 50 WATER WILL
<br />THE NEXT COAT: A SAND -FINISHED BROWN GOAT, WHICH
<br />TO FRESHLY APPLIED PORTLAND CEMENT-BA5ED
<br />LEAD FLASHING.
<br />COMPATIBILITY:
<br />FLOW TO THE EXTERIOR. BACKING SHALL NOT BE PLACED
<br />KEYS INTO THE SCRATCH COAT: AND A FINISH, OR COLOR
<br />PLASTER IF THE RELATIVE HUMIDITY 15 RELATIVELY HIGH
<br />BETWEEN PLASTER BASE (LATH) AND FLANGES OF
<br />COAT.
<br />(ABOVE 15 %), THE FREQUENCY FOR RE -WETTING A
<br />FASTENER:
<br />DO NOT USE RUBBERIZED ASPHALT AND BUTYL TAPES
<br />ACCESSORIES. METAL LATH TO METAL FLANGE CONTACT SHALL
<br />THE FIRST TWO COATS OF A THREE COAT 5Y5TEM ARE
<br />SURFACE MAY BE REDUCED, IF IT 15 HOT, DRY, AND
<br />TOGETHER. ON CONCRETE, MASONRY, OR 0515, RUBBERIZED
<br />BE REQUIRED TO ENSURE THAT FLANGES ARE MECHANICALLY
<br />MADE OF A 51TE-MIXED CEMENT PLASTER. EACH BATCH
<br />WINDY, THE FREQUENCY OF RE -WETTING MUST BE
<br />METAL VALLEY CAN BE FASTENED WITH NAILS OR CLEATS
<br />FLA5HING5 MAY NOT STICK WELL UNLE55 A PRIMER 15 APPLIED.
<br />LOCKED TOGETHER
<br />CONTAINS MEASURED AMOUNTS OF STUCCO CEMENT,
<br />INCREASED.
<br />AT 2 FEET ON CENTER CLEATS ARE BETTER± THEY WILL
<br />ON THESE SURFACES, A BUTYL FLASHING WORKS BETTER
<br />SAND AND POTABLE WATER.
<br />NOT BECOME FATIGUED AND SHEAR WHEN THE METAL
<br />5. SPACING OF ATTACHMENTS FOR METAL PLASTER BA5E5 -
<br />TO HELP REDUCE THE CRACKING THAT IS
<br />CONSIDER THE PHYSICAL CHARACTERISTICS OF THE
<br />EXPANDS AND CONTRACTS.
<br />POLY Y5. FOIL: RUBBERIZED FLA5HING5 TYPICALLY COME WITH
<br />ATTACHMENTS FOR SECURING METAL PLASTER BASES TO
<br />COMMON WITH STUCCO, THE BASE MIX CAN BE MODIFIED
<br />STRUCTURE AS WELL AS THE PREVIOUSLY MENTIONED
<br />WHEN U51NG NAILS, PLACE THEM AT LEAST 5 INCHES AWAY
<br />A POLYETHYLENE OR FOIL COVERING TO PROTECT THEM FROM
<br />FRAMING MEMBERS SHALL BE SPACED NOT MORE THAN 6
<br />WITH LIQUID POLYMER ADDITIVE5, WHICH INCREASE
<br />CONDITIONS WHEN SELECTING THE METHOD OF CURING.
<br />FROM THE VALLEY CENTER TO PREVENT LEAKS.
<br />SUNLIGHT. POLY-GOVERED PRODUCTS NEED TO BE COVERED
<br />INCHES O.C. INTO THE FRAMING MEMBERS, FOR DIAMOND MESH
<br />STRENGTH AND IMPROVE CURING, AND WITH CHOPPED
<br />THE METHOD CAN BE ONE OR A COMBINATION OF THE
<br />FROM SUNLIGHT WITHIN 30 TO 90 DAYS± FOIL -COVERED TAPES
<br />AND FLAT RIB LATHS AND AT EACH RIB FOR % INCH (9.5 mm)
<br />FIBERGLA55 FOR REINFORCEMENT.
<br />FOLLOWING:
<br />VALLEY TREATMENT:
<br />HAVE NO EXACT EXP05URE LIMITATIONS BUT EVENTUALLY WILL
<br />RIB LATH,
<br />DRY OUT AND BECOME BRITTLE, ANY SHIFT IN SURFACE(1)M015T
<br />( CURING 15 ACCOMPLISHED BY APPLYING A FINE
<br />METAL VALLEYS SHOULD BE FABRICATED FROM NO LESS
<br />MOVEMENT WILL PULL AT THE BONA UNTIL EITHER THE BOND
<br />61ATA SHALL BE APPLIED WITH THE LONG DIMENSION AT RIGHT
<br />SCRATCH GOAT:
<br />FOG SPRAY OF WATER AS FREQUENTLY A5 REQUIRED,
<br />THAN NO. 25-GAUGE CORROSION SHEET METAL.
<br />FAILS OR THE MEMBRANE CRACKS.
<br />ANGLES TO THE SUPPORTS, UNLE55 OTHERWISE SPECIFIED.
<br />GENERALLY TWICE DAILY IN THE MORNING
<br />FLASHING
<br />ASPHALT SHINGLES, VALLEY FLASHING MUST EXTEND AT
<br />ES
<br />THE SCRATCH COAT 15 APPLIED DIRECTLY TO A CLEAN
<br />AND EVENING. CARE MUST BE EXERCISED TO AVOID
<br />LEAST 8 INCHES EITHER SIDE THE CENTERLINE.
<br />EXPOSED APPLICATIONS: IN PERMANENTLY EXPOSED
<br />I. ENDS OF ADJOINING PLASTER BA5E5 SHALL BE STAGGERED.
<br />BLOCK WALL OR, ON WOOD STRUCTURES OVER WRB AND
<br />E 05ION AMA TOPORTLANDC M NT A5
<br />R DAMAGE E E B ED
<br />WOOD SHINGLES, THE WING OF THE VALLEY MUST EXTEND
<br />APPLICATIONS, USE AN EPDM FLASHING TAPE INSTEAD OF AN
<br />GALVANIZED METAL LATH. A METAL SCARIFING TOOL IS
<br />PLASTER SURFACES.
<br />10 INCHES EACH SIDE OF CENTERLINE,
<br />INEXPENSIVE FLEXIBLE FLASHING MATERIAL. THE DRAWBACK
<br />WEEP 5GREED5 AND CONTROL JOINTS:
<br />USED TO CREATE 115GRATCH" LINES IN THE STILL WET
<br />SURFACE. THE FURROWS CREATE A ROUGH SURFACE INTO
<br />(2) PLASTIC FILM, WHEN TAPED OR WEIGHTED DOWN
<br />SLATE, TILE, AND WOOD SHAKES, A VALLEY MUST EXTEND
<br />II INCHES EACH SIDE OF CENTERLINE.
<br />WITH EPDM TAPE 15 THAT IT'S EXPENSIVE, AS WELL AS QUITE
<br />THICK ( ABOUT 10-MIL.), MAKING IT AWKWARD TO FOLD INTO
<br />WHICH THE BROWN COAT CAN KEY FOR A GOOD BOND.
<br />AROUND THE PERIMETER OF THE PLASTERED AREA, CAN
<br />SMALL AREAS.
<br />A WEEP 5CREEp AT THE BOTTOM OF THE WALL AND
<br />SCRATCHING SHOULD ALWAYS BE HORIZONTAL AND
<br />PROVIDE A VAPOR BARRIER To RETAIN THE M015TURE
<br />SECTION OF ROOF FLASHING MUST HAVE AN END LAP OF
<br />OVER OPENINGS SERVES TWO IMPORTANT PURPOSES - IT
<br />SHOULD BE 1/4 INCH DEEP,
<br />BETWEEN THE MEMBRANE AND PLASTER CARE MUST BE
<br />AT LEAST 4 INCHES FOR WOOD SHINGLES AND SHAKES,
<br />BUTYL RUBBER FLA5HING5:
<br />PROVIDES A SCREED THAT HELPS ENSURE UNIFORM
<br />EXERCISED IN PLACING THE FILM: IF TOO SOON, THE FILM
<br />AND AT LEAST 6 INCHES FOR SLATE AND TILE ROOFS.
<br />COAT THICKNESS, AND IT PROVIDES A PLACE FOR WATER
<br />5GRATGH-COAT THICKNE55:
<br />MAY DAMAGE SURFACE TEXTURE: IF TOO LATE, THE
<br />DO NOT USE BUTYL FLASHING NEAR ANY A5PHALT-BA5ED
<br />THAT LEAKS INTO THE WALL TO ESCAPE.
<br />M015TURE MAY HAVE ALREADY ESCAPED,
<br />PRODUCTS. THE BUTYL AND THE ASPHALT PRODUCTS
<br />THE SCRATCH COAT SHOULD BE APPROXIMATELY 3/E
<br />FRONT WALL FLASHING:
<br />WILL BOTH DRY OUT FASTER AND L005E THEIR ADHESION.
<br />FOUNDATION WEEP 5CREEp AT FRAME WALLS:
<br />INCH TO 1/2 INCH THICK - THICK ENOUGH TO JUST COVER
<br />(3) CANVAS, CLOTH, OR SHEET MATERIAL BARRIERS CAN
<br />THESE SPECIFICATIONS MEET OR EXCEED THE REQUIREMENTS OF:
<br />THE WIRE,
<br />BE ERECTED TO DEFLECT SUNLIGHT AND WIND, BOTH OF
<br />INSTALL UP THE ROOF UNTIL YOU REACH THE BASE OF
<br />NONSTICK FLASHING&
<br />SECTION R103.12.1 WEEP 5CREED5
<br />WHICH WILL REDUCE THE RATE OF EVAPORATION. IF THE
<br />THE VERTICAL WALL. ADJUST THE EXP05URE OF THE LAST
<br />BROWN COAT:
<br />HUMIDITY 15 VERY LOW, TH15 OPTION ALONE MAY NOT
<br />FEW COURSES, IF NECE55ARY, SO THE LAST COURSE 15 AT
<br />NOT ALL FLEXIBLE FLA514ING5 ARE SELF -ADHERING. 50ME MUST
<br />ACGE55ORY USED TO TERMINATE PORTLAND CEMENT BASED
<br />PROVIDE ADEQUATE PROTECTION.
<br />LEAST E INCHES WIDE,
<br />BE SECURED WITH 5TAPLE5 OR ROOFING NAILS. WHILE
<br />STUCCO AT THE BOTTOM OF EXTERIOR WALLS. TH15 ACCE55ORY
<br />THE BROWN COAT (WHICH 15 ACTUALLY GRAY, LIKE
<br />CUT AND BEND A CONTINUOUS METAL FLASHING STRIP
<br />GENERALLY THINNER AND THE QUICKEST WAY TO DETERIORATE
<br />SHALL HAVE A SLOPED GROUND OR SCREED FLANGE TO
<br />OTHER CEMENT STUCCO), IS A SMOOTH COAT, USUALLY
<br />PAINTING STUCCO:
<br />THAT EXTENDS AT LEAST 5 INCHES UP THE VERTICAL
<br />IN SUNLIGHT, THESE ARE OFTEN THE BEST CHOICE FOR APPLYING
<br />FACILITATE THE REMOVAL OF MOISTURE FROM THE WALL CAVITY
<br />RODDEp WITH STRAIGHT EDGES AND WOODEN FLOATS.
<br />WA AN AT AST 4 INCHES OVER 7A AST
<br />WALL p LE E ER E L SHINGLE
<br />BENEATH SIDING AND TRIM IN CON515TENTLY COLD
<br />AND A VERTICAL ATTACHMENT FLANGE NOT LE55 THAN 3 1/2
<br />IT 15 APPLIED AS 50ON A5 THE SCRATCH COAT
<br />NEWLY APPLIED STUCCO SHOULD BE ALLOWED ABOUT
<br />COURSE,
<br />H
<br />TEMPERATURES, OR WHEN THE SURFACE 15 ROUGH AND
<br />TEMPERATURES,
<br />TEMPS
<br />INCHES LONG,
<br />REACHES SUFFICIENT RIGIDITY TO CARRY THE BROWN
<br />30 DAYS TO CURE BEFORE PAINTING, DEPENDING ON THE
<br />WHEN INSTALLING THE METAL FLASHING STRIP OVER THE
<br />FA OF
<br />DIRTYPEEL-A ALTO 5 THAT
<br />S THAT CAN DIMINISH THE BOND
<br />INSTALLATION OF EXTERIOR LATH AND FRAMING SHALL COMPLY
<br />COAT. THI515 USUALLY AT "THUMB PRINT HARD" AND
<br />WEATHER CONDITIONS - TESTING THE PH LEVEL 15 THE
<br />LAST SHINGLES, EMBED IT IN ROOFING CEMENT AND NAIL
<br />FLACINGS. COVER NONSTICK FLASHING A5
<br />E
<br />-STICKLE
<br />WITH THE APPLICATION REQUIREMENTS OF A5TM C 1063.
<br />CAN BE DONE ON THE SAME DAY.
<br />BEST WAY TO DETERMINE PAINT READINESS. PAINT
<br />IT TO THE ROOF ONLY.
<br />PEON AS TO PROTECT FROM SUNLIGHT.
<br />MANUF. HAVE A MAX. PA LEVEL (APPROX.10),
<br />DO NOT NAIL THE FLASHING STRIP TO THE WALL.
<br />STUCCO CONTROL JOINTS:
<br />BROWN GOAT THICKNE55:
<br />EXISTING STUCCO SURFACES SHOULD BE POWER -WASHED
<br />APPLY AN ADDITIONAL ROW OF SHINGLES - TRIMMED TO
<br />DRAINAGE PLANE:
<br />AND ALLOWED TO THOROUGHLY DRY BEFORE PAINTING.
<br />THE WIDTH OF THE FLASHING - OVER THE FLASHING AND
<br />CONTROL JOINTS ALLOW FOR THE THERMAL EXPAN5ION
<br />THE BROWN COAT 15 COMPOSED OF SLIGHTLY MORE
<br />DO NOT USE A WATER BLASTER, AS THE PRE55URE CAN
<br />EMBEDDED IN ASPHALT PLASTIC ROOFING CEMENT.
<br />AN AIR SPACE BEHIND THE SIDING (1/4-TO 3/E-INCHE5 IS
<br />AND CONTRACTION OF THE PLASTER MEMBRANE,
<br />5AND THAN THE SCRATCH COAT MIXTURE, AND
<br />DO SEVERE DAMAGE TO THE STUCCO,
<br />ENOUGH) WILL ALLOW WATER TO DRAIN AND THE BACKSIDE OF
<br />CONTROL JOINT SHOULD BE APPLIED OVER THE METAL
<br />THEREFORE IT 15 MORE MANAGEABLE BUT 5LIGHTLY
<br />STUCCO SHOULD BE PAINTED ONLY WITH
<br />51DEWALL FLASHING:
<br />SIDING TO DRY.
<br />LATH AT EITHER A MAXIMUM DISTANCE OF IE LINEAR FEET
<br />WEAKER IT SHOULD BE APPLIED 1/4 TO 3/E INGH THICK,
<br />ACRYLIC -BASED PAINTS WITH ADEQUATE VAPOR
<br />OR A MAXIMUM OF 144 SQUARE FEET OF STUCCO SURFACE,
<br />APPLY THE BROWN COAT EVENLY 45 POSSIBLE, AN
<br />TRANSMISSION CHARACTER15%;5, AS THESE PREVENT
<br />UNEVEN BROWN COAT CAN LEAD TO AN INCON515TENT
<br />NEW M015TURE-RELATED PROBLEMS WITHIN THE HOUSE.
<br />SHINGLE ROOFS (ASPHALT, SLATE, OR WOOD) THAT BUTT
<br />WELL DRAINED WALL SYSTEMS:
<br />THE DEPTH OF THE GROUND OF THE CONTROL JOINT
<br />THICKNE55 IN THE FIN15H COAT, CAUSING 50ME AREAS OF
<br />CONTROL JOINT BACKER ROD:
<br />AGAINST VERTICAL WALLS ARE BEST PROTECTED BY
<br />SHOULD BE DESIGNED TO FINISH FLUSH WITH THAT OF THE
<br />THE FIN15H COAT TO DRY BEFORE OTHERS. THE RESULTS
<br />METAL STEP FLASHING PLACED OVER THE END OF EACH
<br />DIFFERENT SIDINGS CALL FOR DIFFERENT DRAINAGE DETAILS.
<br />WEEP SCREEDS AND PLA5TER5TOP5.
<br />15 A SPLOTCHY OR "MOTTLED" COLOR COAT AND
<br />BACKER ROD SHOULD BE USED TO FILL LARGE GAPS
<br />SHINGLE COURSE.
<br />TYPICAL DETAILS FOR WELL -DRAINING WALL5 ARE SHOWN FOR
<br />LATH STALL BE DISCONTINUED BEHIND THE CONTROL
<br />EXCESSIVE HAIRLINE CRACKING.
<br />AND CONTROL THE DEPTH . M05T BACKER RODS TODAY
<br />GUT STEP FLASHING PIECES TO BE 10 INCHES LONG AND 2
<br />DIFFERENT TYPES OF SIDING:
<br />JOINT.
<br />ARE MADE OF FOAM AND DOME IN DIAMETERS FROM 1/4
<br />INCHES WIDER THAN THE SHINGLE EXPOSURE E.G.1
<br />BOARD SIDING, STAKE AND SHINGLE SIDING AND VINYL SIDING.
<br />FINISHED COAT:
<br />INCH TO 2 INCH AND UP. CHOOSE A BACKER ROD THAT 15
<br />JUST A LITTLE LARGER THAN THE JOINT SO IT WILL STAY
<br />AY
<br />A
<br />INCHES FOR ROOF SHINGLES WITH A 5 INCH EXPOSURE,
<br />IN EACH CASE, AN AIR SPACE MUST BE CREATED BEHIND THE
<br />OVER THE RIM J015T AT THE INTERSECTION BETWEEN
<br />AFTER THE CURING PERIOD, A FINISH GOAT CAN BE
<br />IN PLACE AND ALLOW YOU TO CONTROL THE WELTS
<br />BEND THE 10 INCH LENGTH TO EXTEND 5 INCHES OVER
<br />THE ROOF DECK AND 5 INCHES UP THE WALL SURFACE.
<br />SIDING AND AN EXIT PROVIDED FOR THE WATER TO DRAIN OUT,
<br />FLOORS TO ACCOMMODATE SHRINKAGE IN THE FLOOR
<br />APPLIED.
<br />THE SEALANT.
<br />J015T.
<br />FLASHING DETAILS:
<br />I.) NEVER RELY ON THE 5TICKINE55 OF PEEL -AND -STICK
<br />FLA5HING5 FOR SHEATHING: THE BOND IS UNLIKELY TO LA5T
<br />OVER THE LIFE -SPAN OF THE HOUSE.
<br />2,) ALWAYS LAP FLASHING UNDER THE SHEATHING WRAP ABOVE.
<br />FLASHING WINDOWS:
<br />DO NOT X-GUT SHEATHING WRAP AT OPENINGS. INSTEAD I -CUT
<br />THE SHEATHING WRAP, RUNNING THE KNIFE HORIZONTALLY ALONG
<br />THE ROUGH OPENING AT THE HEAD OF THE SILL, THEN SLITTING
<br />VERTICALLY IN THE CENTER OF THE OPENING, TH15 WAY, THE
<br />WINDOW FLANGE CAN BE SLIPPED UNDER THE SHEATHING WRAP
<br />WHEN INSTALLING THE WINDOW,
<br />SILL DETAILS: INSTALL A BEVELED CANT STRIP OR NARROW
<br />DAM STRIP TO THE ROUGH OPENING PILL, THEN WRAP THE 51LL
<br />WITH SHEATHING WRAP OR A FLEXIBLE FLASHING MEMBRANE,
<br />MAKE SURE THIS MEMBRANE DRAPES OVER THE 5HEATHIN6
<br />WRAP BELOW.
<br />ALL SHEATHING WRAP5 MUST BE INTEGRATED WITH FLASHING
<br />MATERIALS. IT'S NOT ENOUGH TO WRAP A HOUSE, AND THEN
<br />SIMPLY X-CUT THE OPENINGS AND FOLD THE FLAPS INSIDE.
<br />FOLLOW THE GUIDELINES FROM THE DETAIL SHEETS WHEN
<br />INSTALLING ANY SHEATHING WRAP,
<br />WINDOW AND DOOR SPLINES
<br />WINDOWS AND DOORS SHOULD BE FLASHED WITH FELT PAPER
<br />OR FLEXIBLE FLASHING SPLINES, THE SPLINES SHOULD BE
<br />INSTALLED AFTER THE SILL FLA5NING, AND THE SHEATHING WRAP
<br />SHOULD GO ON AFTERWARDS OR BE SLIT SO IT LAPS OVER THE
<br />SPLINES.
<br />FLANGED WINDOW HEADS DO NOT NEED ADDITIONAL FLASHING.
<br />THE NAILING FIN WILL DO A GOOD JOB SEALING THE HEAD IF IT
<br />CAN BE TUCKED BENEATH THE SHEATHING WRAP WHEN THE
<br />WINDOW IS INSTALLED. LEAVE A 1/4-IN. GAP BETWEEN THE
<br />SIDING AND THE WINDOW ALONG THE HEAD, BUT DO NOT CAULK
<br />THIS GAP: OTHERWISE, WATER THAT RUNS BEHIND THE 51DING
<br />ABOVE WON'T HAVE A PLACE TO DRAIN,
<br />IF THE FLANGE CANNOT BE TUCKED UNDER THE SHEATHING WRAP
<br />WHEN THE WINDOW 15 INSTALLED, SLIT THE WRAP AND ADD HEAD
<br />FLASHING.
<br />UNFLANGED WINDOWS WILL NEED A ADDITIONAL METAL
<br />Z-FLASHING ABOVE THE HEAD GA51NG OR BRICK MOLD. MAKE
<br />SURE TH15 Z-F A5HING LAPS UNDERNEATH THE SHEATHING WRAP,
<br />MULLED WINDOWS AND WINDOW WALLS MUST HAVE A CONTINUOUS
<br />NEAP FLASHING: THE MANUFACTURER'5 MULLION COVER WILL
<br />NOT PREVENT WATER FROM RUNNING BETWEEN THE WINDOW UNITS
<br />FROM ABOVE.
<br />ROUND -TOP WINDOWS SHOULD BE FLASHED WITH
<br />PEEL -AND -STICK FLEXIBLE FLASHING. SLIT THE SHEATHING
<br />WRAP AND 5LIP IT UNDERNEATH, LETTING IT DRAPE OVER THE
<br />WINDOW TOP, THEN CUT THE FLASHING TO CONFORM TO THE
<br />NAILING FIN, RELY ON PROPER LAPPING OF THE FLASHING, NOT
<br />ON CAULK,
<br />FLASHING DOORS:
<br />OVER WOOD FLOORS, DOOR THRESHOLDS SHOULD BE FLASHED
<br />WITH A METAL PAN OR Z-FLASHING. 5LA55 SHOULD BE FORMED
<br />WITH A "5EAT11 TO HOLD THE THRE5HOLD.
<br />FLASHING LEDGERS AND BEAMS:
<br />LEDGER FLASHING NEEDS TO BE MORE THAN A Z-FLA5HING
<br />RUNNING ALONG THE TOP EDGE OF THE LEDGER BOARD. USE
<br />METAL COIL STOCK 5LIP5 UNDER THE SHEATHING WRAP ABOVE
<br />THE LEDGER, AND DRAPES OVER THE SHEATHING WRAP BELOW
<br />THE LEDGER
<br />ALTERNATIVELY, BUILD A DECK COMPLETELY FREE-STANDING
<br />FROM THE WALL, OR INSERT SPACERS BETWEEN THE LEDGER
<br />BOARD AND THE WALL, 50 IT STANDS OUT AND ALLOWS WATER
<br />TO DRAIN FREELY.
<br />CANTILEVERED DECK OR BALCONY JOISTS THAT PROTECT
<br />THROUGH THE WALL FRAMING ARE TROUBLE SPOTS. FLASH WITH
<br />TWO-PIECE FLASHING MEMBRANE.
<br />FLASHING WALL PENETRATIONS
<br />ELECTRICAL FIXTURE5: INSTALL ELECTRICAL BOXES AND
<br />LIGHTING FIXTURES ON HEMMED METAL FLA5HING5 PLATE. DO
<br />NOT TAPE THE PLATE OVER THE SHEATHING WRAPi SLIT THE
<br />SHEATHING WRAP AND TUCK IT BENEATH.
<br />MECHANICAL PENETRATIONS: GAS LINE, CONDUIT, WATER
<br />SPIGOTS, AND SMALL PENETRATIONS SHOULD BE FLA5AED WITH
<br />TWO-PIECE METAL FLASHING PLATE. SEAL THE TWO PLATES WITH
<br />"LOW MODULES" URETHANE CAULK,
<br />51DEWALL FLASHING:
<br />BECAUSE OF THE VOLUME OF WATER THAT CAN POUR DOWN A
<br />5LOPED ROOF, ONE OF THE M05T CRITICAL FLASHING DETAILS
<br />OCCURS WHERE A ROOF INTERSECTS A 51DEWALL, THE ROOF
<br />SHOULD BE FLASHED WITH A STEP FLASHING. WHERE THE ROOF
<br />TERMINATES, INSTALL A KICK -OUT TO DEFLECT WATER AWAY
<br />FROM THE SIDING. THOUGH NOT ALWAYS P0551BLE IN THE
<br />SCHEDULE, IT'S BEST TO INSTALL A FULL 36-IN. PIECE OF
<br />RUBBERIZED ASPHALT FLASHING ON THE WALL BEFORE THE
<br />5UBFA5CIA AND TRIM BOARDS ARE NAILED IN PLACE, AND THEN
<br />COME BACK TO INSTALL THE KICKOUT.
<br />0
<br />BEWS
<br />DESIGN GROVP
<br />150 STATE STREET EAST
<br />o1�sMAR, �roRroA �n
<br />813. 925.130E TEL
<br />813.925.180E FAX
<br />W W W.DAVISBEWS.COM
<br />TAMPA • DENVER
<br />EST. 1994 �
<br />1
<br />0
<br />Z O
<br />ON
<br />=3 �
<br />�(J')MO
<br />o ul
<br />LL
<br />C
<br />DC U Q 00
<br />Q E�
<br />Z � �
<br />w Wo
<br />,J o
<br />zt
<br />oz
<br />o
<br />�5
<br />w�
<br />zaa
<br />z
<br />W¢�a
<br />oz�o
<br />0
<br />E-azz
<br />�oJw
<br />OWI-N
<br />W 8u°
<br />o�
<br />Q z z
<br />o
<br />zW
<br />z
<br />z a
<br />O
<br />z
<br />W
<br />L
<br />W
<br />z o�
<br />z O Q �o
<br />z
<br />Lu
<br />U z o0
<br />LLJ
<br />O �Z
<br />z ¢ ul0
<br />z >
<br />Lu
<br />= w
<br />r'nO g w � m
<br />SCALE : AS NOTED
<br />DATE : 10-19-2018
<br />VERSION NO.
<br />ino
<br />SHEET NO.
<br />DT6
<br />DAVIS
<br />
|