Laserfiche WebLink
SIMPSON HGAM10KTA <br />W/ <br />(4) 1/4"x1 1/2" SDS <br />SCREWS <br />TO BLOCKING & (4) <br />1/4"x2 3/4" <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) MAX 9" <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ UNSUPPORTED, <br />SCHEDULE FOR SHEATHING DETAILS (2) 16d NAILS IF >9" SEE 10/S6 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. MAX 9„ SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />AND FASTENERS. (MIN. FIRST 4 BAYS) IF >9" SEE 1 O/S6 <br />BACKNAIL w/ (2)16d NAILS BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />45°± <br />45° ± <br />SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO <br />BRACE <br />SCHEDULE FOR <br />APPROX. 8" FROM <br />SHEATHING DETAIL <br />2x4 KICKER <br />2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT <br />= <br />@ 8'-0" 0/C. <br />EXTEND AT LEAST 90% OF <br />, <br />EACH JOINT W/ (3) 10d <br />"L" BRACE TO EXTEND <br />2x4 CROSS BRACE <br />WEB LENGTH & NOTCH AT <br />& (2)10d TOE NAILS @ <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />BOTTOM CHORD (SEE TABLE) <br />EA. END @ 48" O.C. <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. <br />GABLE TRUSS <br />EACH JOINT w/ (3)10d & <br />FROM LEDGER TO <br />SILL <br />1/2" CDX PLYWOOD OR <br />d TOE NAILS @ EA. <br />BLOCKING <br />• <br />7/16" OSB SHEATHING <br />END <br />ATTACHED W/ 10d <br />GYPSUM WALL BOARD <br />GABLE TRUSS <br />NAILS @ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />CDX PLYWOOD <br />7HE <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM <br />OS T <br />SHEATHING ATTACHED <br />1OdX3" @ 3" O/C <br />CORD ATTACHED W/ (2) 16d TOENAILS <br />w/ 1 <br />w/ 10d NAILS @ 6" O.C. <br />THROUGH CHORD <br />2"x4" LEDGER (MATCH BOTTOM CHORD <br />EDGES AND 12" O.C. FIELD <br />INTO 2"x6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />DOUBLE TOP PLATE <br />2x4 CROSS BRACE APPROX. 8" <br />FROM RIDGE FASTENED AT <br />EACH JOINT w/ (3) 10d & (2) 10d <br />TOE NAILS @ EA. END <br />2x FRAME WALL (SEE WALL <br />SECTION FOR SIZE &SPACING) <br />1/2" CDX PLYWOOD OR 7/16" <br />\ OSB SHEATHING ATTACHED <br />W/ 10d NAILS @ 6" O.C. EDGES <br />AND 12" O.C. FIELD <br />(2) 16d NAILS <br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />FASTEN WITH 10dx3" 4" O/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL <br />@ INSTALLED PER MANUF. 1/2" x 8" "J" BOLT @ 48" O.C. WEEP SCREED FROM EA. END TYP. TOP & BOTTOM <br />@ 48" O.C. BLOCKING, FASTEN WITH <br />SIMPSON META12 w/ (7)10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2) 16d TOENAILS <br />" " MOISTURE BARRIER 10d 3" 4" O/C <br />1/2 x 8 J BOLT @ 32 O.C. MINIMUM 6 FROM <br />O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - <br />MOISTURE BARRIER <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER <br />SIMPSON META12 w/ (7) <br />ALTERNATE SIMPSON MSTAM24 w/ (7) 1Od NAILS <br />NOTE: IF EMBEDDED <br />10dx1 1/2" NAILS AT EA. <br />& (4) 1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL <br />SECTION <br />TRUSS VERTICAL WEB (24" <br />1 <br />KO'2 <br />GABLE WEB SECTION <br />WEB, USE MSTAM36 w/ (7) <br />O.C. MAX) w/ MIN. 4 <br />1Od NAILS & (4) 1/4"x2 1/4" <br />SCALE: N.T.S. <br />S5 EMBEDMENT IN KO BLOCK <br />SCALE: N.T.S. S5 <br />TITEN ON OUTSIDE <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />-REFER TO DETAIL J <br />N <br />N <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />ON SHEET S5 FOR <br />X-BRACING, AND TOP <br />r <br />co <br />SEE STRUCTURAL <br />CHORD BLOCKING <br />NOTES AND NAILING <br />INFORMATION <br />fO <br />SCHEDULE FOR <br />SHEATHING DETAIL <br />BACKNAIL w/ <br />1 1 <br />1/ <br />" <br />(2)16d NAILS <br />-WOOD TRUSSES <br />fO <br />_ <br />00 <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />2x4 RAT RUN BRACING <br />RIDGE FASTENED AT <br />AT 24" O.C. ON TOP OF <br />EACH JOINT w/ (3) <br />BOTT. CHORD FOR 4 <br />TRUSS SPANS <br />40� <br />10d & (2)10d TOE <br />ATTACHED W/ 2 -16d <br />NAILS @ EA. END <br />AT EA. TRUSS JOINT <br />(2) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 4" LAMINATIONS W/ (1) ROW (3) 2" x 6" LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS <br />@ 48" O/C FOR THE <br />(2) 16d NAILS <br />2x4 BLOCKING @ 24" <br />(D = 0.148", L = 3") OR EQUAL <br />(D = 0.207", L = 41/2") OR EQUAL (D = 0.207", L = 41 /2") OR EQUAL <br />FIRST (4) ROWS OF <br />• <br />O/C w/ (2) 16d <br />TRUSSES FROM EA. <br />TOENAILS @ EA. END <br />NOTES: <br />END TYP. TOP & <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 5 1/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />MASONRY WALL <br />OF THE COLUMN <br />(SPACE AS SHOWN FOR 3-PLY) <br />w/ (2) 16d TOENAILS <br />-ARCHITECTURAL FINISH <br />2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />Lm <br />OF THE LAST LAMINATION <br />(SPACE AS SHOWN FOR 3-PLY) <br />2x47" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION „ <br />EXT. WALL CONN. @ 1Odx3 @ 4 O/C <br />IV COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF <br />NON - LOAD BEARI G LOCATION D B.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION <br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=1'-O" S5 TYPICAL NAILING SCHEDULES FOR BUILT—UP COLUMNS 8 <br />ADDITIONAL INFORMATION. SCALE: N.T.S. �+� SCALE: N.T.S. <br />IINIMUM 2x <br />:ROSS BRACING <br />3EE PLAN FOR <br />OCATIONS) 'TOENAIL 1 <br />(2) 16d NA <br />(2) 16d PER <br />JOINT <br />�- CONTINUOUS BOTTOM CORD BRACING 2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL J <br />SCALE: N.T.S. S5 <br />12" <br />SH SCHEDULE <br />,TTACHMENT <br />SYP BLK'G @ 16" O.C. <br />i x 0.131" <br />AILS EA. SIDE <br />. 2x4 #2 SYP w/ 1 Od <br />XO.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL (00,0 <br />SCALE: N.T.S. S5 <br />GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />-MINIMUM (2)16d PER JOINT MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />SCALE: N.T.S. <br />6" OVERLAP <br />M <br />S5 <br />V BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />x @ <br />2x4 LEDGER (MATCH BOTTOM CHORD <br />SLOPE OF ADJACENT TRUSS) <br />SECTION(S�)I <br />SCALE: N.T.S. S5 <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S6 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 1Od NAILS @ 6" O.C. <br />E ES AND 12" O.C. FIELD <br />JACK TRUSS <br />SEE PLAN FOR <br />CONNECTION <br />(2) 12d TOENAILS <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />EACH JOINT w/ (3) <br />10d & (2) 10d TOE <br />NAILS @ EA. END <br />2x4 PANEL BLOCKING <br />@ 48" O/C FOR THE (2) 16d <br />FIRST (4) ROWS OF • <br />TRUSSES FROM EA. NAILS <br />END TYP. TOP & <br />BOTTOM ATTACHED <br />W/ (2)16d TOENAILS <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1O/S6 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2"CDX PLYWOOD OR <br />7/16" OSB SHEATHING <br />ATTACHED w/ 10d NAILS <br />@ 6" O.C. EDGES AND 12" <br />O.C. FIELD <br />-2x4'7 ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />1Odx3" @ 4" O/C <br />SIMPSON HGAI OKT w/ (4) 1/4"xl 1/2" SDS SCREWS TO <br />TRUSS & (4) 1/4"x3" SDS SCREWS TO PLATES AT 24" O.C. SIMPSON SP2 w/ (12) 10d <br />DBL. TOP PLATE NAILS AT EACH STUD <br />STUD WALL (SEE TYP. SEC.) <br />SECTION 4 <br />SCALE: N.T.S. S5 <br />8d @ 6"0/C <br />WOOD TRUSSES <br />SIMPSON HGAMIOKTA w/ (4) <br />1/4"x1 1/2" SDS SCREWS TO <br />BLOCKING & (4) 1/4"x2 3/4" <br />TITEN TO CMU <br />2 x 4 BLOCKING w/ (2)10d <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />• <br />a <br />z <br />W <br />\-BRACING w/ (3)1Od x 3" AT <br />EACH CONN. @ 24" O/C <br />-MOISTURE BARRIER <br />BOND BEAM <br />- MASONRY WALL <br />ARCHITECTURAL FINISH <br />EXT. WALL CONN. @ NON - LOAD <br />BEARING LOCATION (UNEVEN CLG.) rE <br />SEE TYP. WALL SECTION FOR SCALE: N.T.S. S5 <br />ADDITIONAL INFORMATION. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />74" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - T-O" <br />3'-0" - 6'-0" <br />6'-0" & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 1 Odx3" NAILS @ 4" O/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGA10KT w/ (4)1/4"x1 1/2" SDS-- - <br />VVIY 1. ULl\fl11YV - <br />GABLE END BRACING DETAIL SCALE:3/4"=1'-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON 6P2 w/ (12) <br />10d NAILS AT EACH <br />STUD <br />HIP FRAMING REFERENCE PLAN <br />2x4 BLOCKING-,,_,2x4'T" BLOCKING <br />@ 48" O.C.16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />10d NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 "T" BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />"L" BRACE ATTACHED 16d NAIL <br />W/ 10d NAILS @ 4" O.C. <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL 6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" O/C GABLE TRUSS <br />TRUSS VERTICAL <br />(2) 2"x8" "L" BRACE <br />FASTENED WITH (3) <br />16d PER SIDE <br />SCISSOR GABLE "T" BRACE <br />AS PER HIB 91 SCALE: N.T.S. S5 <br />20'-0" MAX 20'-0" MAX <br />"X" BRACE SEE DET. J/S5 -i r CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />m <br />II <br />II■I <br />g <br />I.�li�� <br />it <br />le <br />III■II <br />II��Imm <br />NOTE: /-TOP CHORD 2x4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING <br />@ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING <br />BAYS <br />THAT MY BE REQUIRED <br />BOTTOM CHORD GABLE END BRACING <br />2) -r BRACING MAY BE USED IN PLACE OF PERMANENT <br />@ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />SCALE: N.T.S. <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />W/ DROP CEILING BRACING DETAIL <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />VIflTUAI <br />FEJItW ASSIST , <br />Virtual RevievV A'S'- ' r` ; , v ed <br />Plans Review co,Pt"'m02� F3G 7th <br />for compliance with tne 2. <br />Edition by Debra Anne Klahr PX2300 <br />Ed <br />N <br />CV <br />O <br />N <br />0,11 <br />in <br />00 <br />U <br />® 1 <br />Q <br />�s`i�us <br />l x� <br />_ r <br />o <br />0 <br />0 <br />i <br />Q <br />SIN a) o ^ E <br />U <br />M C4 <br />ff� <br />(n V -0 � d M <br />2 o <br />O B o <br />O u- o Q <br />s U6� <br />•tn W 0- <br />N%. 0 E co •2) <br />a -a <br />0 L C/j W Q <br />W P W J W 2�- O <br />a <br />O <br />U <br />I- F- <br />=OO <br />av _jCO0z2o0aI—Q <br />W0O <br />0'u,O0azoZoLLFoomZz <br />Z <br />J <br />Wa. Q.W_W W W_LLOfaU) VyW� <br />wo.20F <br />ILL. <br />< <br />0 QZ9a <br />0W =0 <br />O U- <br />i! <br />O <br />Z <br />W <br />L <br />1-, <br />� <br />�U)CCMO <br />Q J LO <br />LL ti <br />I—WO.M <br />a- <br />QUQ00 <br />Z <br />WW0 <br />J 0O <br />14, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />CD <br />o <br />N <br />0 <br />N <br />0 <br />N <br />N <br />O <br />N <br />rn <br />o <br />0 <br />� <br />o <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Z <br />O <br />NW <br />CD <br />O <br />0 <br />o <br />I <br />I <br />I <br />I <br />L/ <br />CD <br />N <br />' <br />c/ <br />♦/ <br />} <br />ZH <br />U) <br />QLU <br />W <br />O <br />Z <br />4-0 fj <br />W <br />U <br />DOO <br />0)O <br />UUFn <br />0 <br />0Zj <br />O~0 <br />Z <br />(L <br />Q <br />� <br />F- <br />w=a <br />Ln <br />m�W <br />T'I <br />zom <br />W�� <br />. . CV <br />Q <br />0 <br />Zoo <br />Z <br />(� <br />aZu_ <br />- Z <br />L.L <br />Z <br />m m <br />pU <br />_0 <br />m <br />z <br />Z <br />z <br />LU <br />W <br />J <br />O <br />O <br />LAST PLOT DATE <br />O <br />z <br />STRUCTURAL <br />DETAILS <br />