PART IGENERAL
<br />1.01 GENERAL CONDITIONS
<br />THE APPLICABLE PROVISIONS OF THE GENERAL CONSTRUCTION SPECIFICATIONS SHALL APPLY TO
<br />THE FOLLOWING SPECIFICATIONS ARTICLES.
<br />A. THE SPECIFICATIONS AND DRAWINGS ARE INTENDED TO SERVE JOINTLY AS A BASIS UPON
<br />WHICH THE CONTRACTOR SHALL SUBMIT A CONTRACT PRICE FOR THE MATERIAL AND LABOR
<br />PROVISIONS.
<br />B. WHEN CONFLICTS OCCUR IN THE SPECIFICATIONS OR ON THE DRAWINGS, OR BETWEEN EITHER,
<br />THE ITEMS OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED.
<br />C. THE CONTRACTOR SHALL PROVIDE ALL ITEMS OF LABOR AND MATERIALS NOT SPECIFICALLY
<br />INDICATED, BUT REQUIRED TO COMPLETE THE INTENDED INSTALLATION.
<br />D THE CONTRACTOR SHALL COORDINATE HIS WORK OR ADJUST SA T THAT F THE N ME 0 0 OTHER
<br />TRADES, IN ORDER THAT CONFLICTS IN SPACE LOCATIONS DO NOT OCCUR.
<br />E. THE WORK UNDER THIS CONTRACT SHALL BE PERFORMED SIMULTANEOUSLY WITH WORK OF
<br />OTHER TRADES, SO AS NOT TO DELAY THE OVERALL PROGRESS OF WORK.
<br />F. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK WITH ITS COMPLETION AND FINAL
<br />ACCEPTANCE AND SHALL REPLACE ANY IF SAME WHICH MAY BE DAMAGED, LOST OR STOLEN,
<br />WITHOUT ADDITIONAL COST TO THE OWNER.
<br />G. ALL PLUMBING WORK SHALL BE PERFORMED BY A STATE LICENSED PLUMBER IN STRICT
<br />ACCORDANCE WITH AHJ, STATE & LOCAL CODES AND REQUIREMENTS.
<br />H. PROVIDE ALL TRANSPORTATION, FREIGHT, LOADING AND UNLOADING AND PROVIDE ALL LABOR
<br />NECESSARY FOR ERECTING IN PLACE OF ALL MATERIAL AND EQUIPMENT SHOWN, SPECIFIED OR
<br />REQUIRED UNDER THIS DIVISION.
<br />1.02 SCOPE OF WORK:
<br />A. WITHOUT LIMITING GENERALITY, PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT FOR A
<br />COMPLETE PLUMBING SYSTEM AS DESCRIBED BELOW:
<br />1. SANITARY, WASTE AND VENT PIPING SYSTEM.
<br />2. DOMESTIC WATER PIPING SYSTEM.
<br />3. PLUMBING FIXTURES & TRIM.
<br />4. PIPE INSULATION, SLEEVING AND FIRESTOPPING.
<br />5. HANGERS SUPPORTS ACCESS PANELS DOORS.
<br />6. FLUSHING, DISINFECTING, TESTING AND BALANCING.
<br />7. PERMITS & FEES.
<br />8. CONNECTIONS TO EXISTING PIPING OR EQUIPMENT.
<br />9. TRENCHING, BACKFILLING, COMPACTING, CORING, CUTTING, AND PATCHING.
<br />10. DOMESTIC WATER HEATING SYSTEM
<br />11. NATURAL GAS SYSTEM
<br />12. BAR EQUIPMENT CONNECTIONS & GREASE TRAP
<br />13.
<br />PART II PRODUCTS
<br />2.01 PIPING
<br />A. WATER PIPING ABOVE SLAB, SHALL BE TYPE "L" COPPER ASTM-13-88 WITH (95-5) TIN -ANTIMONY
<br />SOLDERED JOINTS & WROUGHT FITTINGS. WATER PIPING BELOW SLAB, SHALL BE TYPE "K" SOFT
<br />COPPER TUBING "ONE PIECE -WITHOUT JOINTS".
<br />B. ALL EXPOSED WASTE AND WATER PIPING SHALL BE CHROME PLATED.
<br />C. WASTE & VENT PIPING BELOW THE SLAB, SHALL BE STANDARD WEIGHT, BELL & SPIGOT CAST
<br />IRON, PIPE & FITTINGS.
<br />D. WASTE AND VENT PIPING ABOVE THE SLAB, SHALL BE HUBLESS CAST IRON, PIPE & FITTINGS,
<br />ASTM-A-74, MANUFACTURED AND INSTALLED IN ACCORDANCE WITH C.I.S.P.I. STANDARD 301
<br />AND PAMPHLET 100. JOINTS SHALL BE MADE WITH CLAMP RETAINER SLEEVE AND NEOPRENE
<br />GASKET. NO -HUB COUPLINGS SHALL BE HEAVY DUTY C.I. COUPLINGS AS MANUFACTURED BY
<br />CLAMP -ALL "125" SERIES OR HUSKY "SD 4000" SERIES.
<br />E. GAS PIPING ABOVE GRADE SHALL BE SCH 40 SEAMLESS BLACK STEEL, ASTM A53 GRADE A WITH
<br />MALLEABLE IRON FITTINGS CONFORMING TO ANSI/ASME B16.3.
<br />F. PROVIDE ALL NECESSARY SUPPORTS, HANGERS, BRACES, ANCHORS, PADS AND ALL ELSE
<br />NECESSARY FOR THE ENTIRE INSTALLATION AND TO MEETTHE INTENT OF THE SYSTEMS FOR
<br />PROPER OPERATION.
<br />G. PIPE AND EQUIPMENT SUSPENSION SHALL BE SUCH AS TO PREVENT EXCESSIVE STRESS,
<br />EXCESSIVE VARIATION IN SUPPORTING FORCE, POSSIBLE RESONANCE WITH IMPOSED VIBRATION
<br />WHILE THE SYSTEM IS IN OPERATION CREEPING, SAGGING, BUCKLING, OR MISALIGNMENT.
<br />H. SYSTEMS SHALL OPERATE UNDER ALL CONDITIONS OF LOAD WITHOUT ANY OBJECTIONAL
<br />SOUND OR VIBRATION.
<br />1. OPENINGS IN EXTERIOR WALLS OR ROOF SHALL BE KEPT PROPERLY PLUGGED AND CAULKED AT
<br />ALL TIMES EXCEPT WHEN BEING WORKED ON TO PRECLUDE THE POSSIBILITYFLOODING DUE
<br />OF N
<br />TO STORM OR OTHER CAUSES. AFTER COMPLETION OF WORK OPENINGS SHALL BE
<br />PERMANENTLY SEALED AND CAULKED IN A MANNER APPROVED BY THE ENGINEER OR
<br />ARCHITECT.
<br />J. PROVIDE DI -ELECTRIC FITTINGS BETWEEN DISSIMILAR METALS.
<br />2.02 BIDDING CONFLICTS:
<br />A. IF CONFLICTS OCCUR WITHIN THESE SPECIFICATIONS OR ON THE DRAWINGS, OR EITHER,
<br />BETWEEN THE ITEMS OF GREATER QUANTITY OR HIGHER COST SHALL BE BID AND PROVIDED.
<br />2.03 SMOKE AND FIRESTOPPING:
<br />A. FIRESTOP ALL PENETRATIONS BETWEEN FLOORS & FIRE RATED WALLS WITH APPROVED FIRE
<br />STOPPING ASSEMBLIES AS MANUFACTURED BY 3M INDUSTRY, HILTI OR APPROVED EQUAL. THE
<br />ASSEMBLIES SHALL COMPLY WITH THE LATEST APPLICABLE REQUIREMENTS OF THE: BUILDING
<br />CODE, NFPA STANDARDS AND OWNERS INSURANCE COMPANY. PROPOSED APPLICABLE
<br />ASSEMBLIES SHALL BE UL LISTED AND SHALL BE PART OF THE PLUMBING EQUIPMENT
<br />SUBMITTAL.
<br />B. ALL PIPING PASSING THROUGH FIRE -RATED WALLS, SLABS, FLOORS, ETC. SHALL HAVE STEEL
<br />SLEEVES EXTENDING 2" BEYOND SURROUNDING SURFACE. THE SPACE BETWEEN THE PIPES AND
<br />THE SLEEVES SHALL BE COMPLETELY PACKED WITH AN APPROVED FIRESTOPPING MATERIAL.
<br />AFTER FIRESTOPPING MATERIAL HAS BEEN INSTALLED AROUND PIPES, A 26" GAUGE SHEET
<br />METAL COLLAR SHALL BE SECURED AROUND THE PIPE TO INSURE TIGHTNESS.
<br />2.04 INSULATION:
<br />A. ALL INSULATION WHEN INSTALLED SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS
<br />AS TESTED BY PROCEDURE ASTM-E-84, NFPA-255, AND UL-723, NOT EXCEEDING A FLAME
<br />SPREAD OF 25 AND SMOKE DEVELOPED OF 50 WHEN COMPARED WITH RED OAK AS 100, AS
<br />APPROVED UNDER NFPA AND NBFU PAMPHLET NO. 90A AND NO. 90B STANDARDS.
<br />B. DOMESTIC WATER PIPING ABOVE GROUND SHALL BE INSULATED WITH FIBERGLASS INSULATION
<br />WITH FACTORY -APPLIED ALL -SERVICE JACKET SECURED IN PLACE WITH SELF SEALING LAPS.
<br />FITTINGS SHALL BE INSULATED WITH PREMOLDED PVC COVERS SECURED IN PLACE WITH
<br />STAINLESS STEELTACKS. DOMESTIC WATER PIPING BELOW GROUND SHALL BE INSULATED WITH
<br />1/2" THICK "ARMAFLEX" ELASTOMERIC UNICELLULAR SEAMLESS INSULATION.
<br />C. PIPING INSULATION MATERIALS AS MANUFACTURED BY GUSTIN BACON, JOHNS MANVILLE,
<br />OWENS-CORNING, KNAUF, OR CERTAIN TEED.
<br />D. ABOVE GROUND PIPING: INSULATION THICKNESS:
<br />1, DOMESTIC COLD WATER: 1" THICK
<br />2. DOMESTIC HOT WATER & HOT WATER RETURN: 1" THICK
<br />2.05 ACCESS PANELS:
<br />A. FURNISH ALL ACCESS PANELS FOR WALLS AND CEILINGS. COORDINATE THE ACCESS PANEL
<br />LOCATION WITH GENERAL CONTRACTOR. PIPING SHALL BE LAID OUT IN SUCH A MANNER AS TO
<br />MINIMIZE THE NUMBER OF ACCESS PANELS REQUIRED. MILCOR PRODUCTS, VENTLOCK, KNAPP.
<br />MINIMUM SIZE: 8" X 8".
<br />B. PROVIDE ACCESS PANELS FOR ALL CLEANOUTS, VALVES, AND OTHER CONCEALED ACCESSORIES
<br />REQUIRING ACCESS SUCH AS SHOCK ABSORBERS, CONTROL VALVES, PRESSURE REDUCERS, AIR
<br />ARRESTORS, ETC.
<br />2.06 IDENTIFICATION, MARKING AND TAGGING:
<br />A. EQUIPMENT IDENTIFICATION:
<br />1. MANUFACTURER'S NAMEPLATES OR TRADEMARK SHALL BE PERMANENTLY AFFIXED TO ALL
<br />EQUIPMENT AND MATERIALS FURNISHED UNDER THIS DIVISION. MFG'S NAMEPLATES
<br />SHALL INCLUDE ALL PERTINENT DATA RELATIVE TO THE PIECE OF EQUIPMENT INCLUDING
<br />MODEL NUMBER, SERIAL NUMBER, AND OPERATING CHARACTERISTICS AS APPLICABLE.
<br />2. SEPARATE EQUIPMENT IDENTIFICATION MARKERS SHALL IDENTIFY EACH ITEM OF
<br />EQUIPMENT WITH A PERMANENTLY ATTACHED MARKER INDICATING DESIGNATION
<br />AND/OR NUMBER CORRESPONDING TO DESIGN DOCUMENTS E.G. WH-1, WH-2, ETC.
<br />3. MARKERS SHALL BE OF RIGID BLACK BAKELITE OR PHENOLIC CONSTRUCTION WITH WHITE
<br />ENGRAVED OR INCISED LETTERS.
<br />4. LETTERING ON EQUIPMENT MARKERS SHALL BE OF ADEQUATE SIZE TO BE LEGIBLE FROM
<br />FLOOR LEVELS. MARKER LETTERING SHALL NO BE LESS THAN 1 INCH HIGH.
<br />5. MOUNT EQUIPMENT IDENTIFICATION NAMEPLATES IN A CONSPICUOUS PLACE ON THE
<br />EQUIPMENT.
<br />6. FOR EQUIPMENT MOUNTED ABOVE THE FLOOR LEVEL, MOUNT IDENTIFICATION
<br />NAMEPLATE SO THAT THEY CAN BE SEEN FROM FLOOR LEVEL.
<br />7. ATTACH NAMEPLATES WITH RIVETS.
<br />GENERAL PLUMBING SPECIFICATIONS
<br />B. PIPING SYSTEM IDENTIFICATION:
<br />1. PIPING SYSTEMS SHALL BE IDENTIFIED AS INDICATED HEREIN OR AS REQUIRED BY
<br />APPLICABLE CODES AND/OR OFFICIALS HAVING JURISDICTION.
<br />2. PIPE MARKERS SHALL BE COLOR CODED ACCORDING TO "TABLE 2: CLASSIFICATION OF
<br />MATERIALS AND DESIGNATIONS TO COLORS" - ANSI A13.1-1981.
<br />3. PIPE MARKERS SHALL INDICATE DIRECTION OF FLOW, SYSTEM, OPERATING PRESSURE AND
<br />TEMPERATURE.
<br />4. PIPE MARKERS SHALL BE OF THE PRESSURE SENSITIVE TYPE AS MANUFACTURED BY THE
<br />SETON NAMEPLATE CORP. (F10-CODE)
<br />S. PIPE MARKERS SHALL BE INSTALLED AT EVERY POINT OF ENTRY AND EXIT THROUGH FLOORS,
<br />WALLS, CEILINGS OR OTHER CONCEALMENT, ON EACH RISER, TAKE -OFF AND BRANCH AND
<br />AT EACH PIECE OF EQUIPMENT.
<br />6. tM PE TALL N5 I MARKERS RKERS AT A DISTANCE OF NOT LESS THAN 25 FEET APART IN CONTINUOUS
<br />CLEARLY VISIBLE. LENGTHS OF PIPE LINES AND ORIENTED SO THAT MARKERS ARE WHEN PIPE
<br />LINES ARE LOCATED ABOVE THE NORMAL LINE OF VISION, THE MARKER SHALL BE PLACED
<br />BELOW THE HORIZONTAL CENTERLINE OF THE PIPE.
<br />C. VALVE IDENTIFICATION:
<br />1. PROVIDE LAMINATED PLASTIC NAMEPLATES ON ALL VALVES INSTALLED UNDER DIVISION 15,
<br />EXCEPT STOP VALVES IN SUPPLIES TO FIXTURES. TAGS SHALL BE CONSTRUCTED OF 0.125
<br />INCHES THICK MELAMINE PLASTIC CONFORMING TO FED. SPEC. L-P-387. SURFACE SHALL BE
<br />MATTE FINISH. ACCURATELY ALIGN LETTERING AND ENGRAVE INTO WHITE CORE.
<br />HALL BE 0 2 INCHES ROUND OR HEXAGONAL. LETTERING SHALL BE
<br />NAMEPLATES S T R 0
<br />MINIMUM OF 0.375 INCH HIGH NORMAL BLOCK LETTERING. KEY THE NAMEPLATES TO A
<br />CHART AND SCHEDULE FOR EACH SYSTEM UNDER GLASS AND PLACE WHERE DIRECTED IN
<br />MECHANICAL ROOM. FURNISH FOUR COPIES OF EACH CHART AND SCHEDULE. EACH
<br />INSCRIPTION SHALL IDENTIFY IT'S FUNCTION. ATTACH NAMEPLATES WITH "S" HOOKS AND
<br />CHAIN TO EACH VALVE. VALVE NAMEPLATES SHALL BE NUMBERED AND "KEYED" AS
<br />FOLLOWS:
<br />a. PLUMBING NAMEPLATES SHALL BE RED IN COLOR AND INDICATE:
<br />AA. "CW" COLD WATER
<br />BB. "HW" HOT WATER -INDICATE DESIGN TEMPERATURE OF WATER
<br />CC. "HWR" HOT WATER RETURN
<br />b. CHART AND SCHEDULE SHALL INDICATE THE FOLLOWING INFORMATION:
<br />AA. MANUFACTURER, TYPE, AND MODEL NUMBER
<br />BB. CAPACITY OR SIZE
<br />CC, SYSTEM IN WHICH IT IS INSTALLED
<br />DD. SYSTEM OR EQUIPMENT WHICH IT CONTROLS
<br />EE. LOCATION KEYED INTO VALVE NUMBER
<br />c. VALVE TAGS AND CHAIN SHALL BE SECURELY ATTACHED TO THE VALVE SO THAT
<br />NORMAL OPERATION OF THE VALVE OR TAMPERING WILL NOT ALLOW IT TO BE
<br />REMOVED.
<br />2.07 SLEEVES, INSERTS AND ESCUTCHEONS:
<br />A. PROVIDE SLEEVES FOR ALL WORK PASSING THROUGH FLOOR, WALL, AND CEILING
<br />CONSTRUCTION. MAINTAIN ALL RATINGS.
<br />B. LOCATE AND PROVIDE SLEEVES AND INSERTS BEFORE THE FLOOR, WALL OR CEILING IS
<br />CONSTRUCTED. IF THIS CONTRACTOR DOES NOT COMPLY WITH THE ABOVE, HE SHALL BEAR ALL
<br />COSTS INCURRED FOR CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF SLEEVES
<br />AND INSERTS. HOLES REQUIRED FOR SLEEVES IN EXISTING WALLS AND FLOORS, OR TO
<br />CONFORM TO THE ABOVE, SHALL BE SAW CUT OR CORE DRILLED. THIS CONTRACTOR SHALL
<br />PROVIDE ALL DRILLING REQUIRED FORTHE INSTALLATION OF HANGERS.
<br />C. PIPE SLEEVES THROUGH OUTSIDE WALLS AND SLAB -ON -GRADE FLOOR SHALL BE SCHEDULE 80
<br />BLACK STEELPIPE WITH 150 LB. BLACK STEEL SLIP-ON WELDED FLANGES WELDED AT THE
<br />LA
<br />CENTER OF THE OUTSIDE. EXTEND SLEEVES1 2 INCHES BEYOND EACH SIDE OF THE WALL. PACK
<br />THE SPACE BETWEEN SLEEVE AND PIPE WITH OAKUM TO WITHIN 2 INCHES OF EACH FACE OF
<br />THE WALL. PACK THE REMAINING SPACE AND MAKE WATERTIGHT WITH AN APPROVED
<br />WATERPROOF COMPOUND. (INSIDE FACE OF SLAB -ON -GRADE FLOOR.) FOR EXISTING WALL
<br />CONSTRUCTION, CENTER FLANGE WILL NOT BE REQUIRED.
<br />D. PIPE SLEEVES THROUGH CONCRETE FLOORS OR INTERIOR MASONRY WALLS SHALL BE SCHEDULE
<br />SL S OU E E 0
<br />40 BLACK STEEL PIPE, SET FLUSH WITH FINISHED WALL OR CEILING SURFACES, BUT EXTENDING 2
<br />INCHES ABOVE FINISHED FLOORS. PLASTIC, PVC, OR LIGHT METAL SLEEVES SHALL NOT BE
<br />INSTALLED.
<br />E PROVIDE 0 STRIP TYPE INSERTS PRESSED STEEL CONSTRUCTION WITH
<br />E. PR E R D T
<br />ACCOMMODATION FOR REMOVABLE NUTS AND THREADED RODS UP TO 3/4 INCH DIAMETER,
<br />PERMITTING LATERAL ADJUSTMENT. INDIVIDUAL INSERTS SHALL HAVE AN OPENING AT THE TOP
<br />TO ALLOW REINFORCING RODS TO 1/2 INCH DIAMETER TO BE PASSED THROUGH THE INSERT
<br />BODY AND SHALL BE SIMILAR TO FEE AND MASON MANUFACTURING COMPANY FIGURE 178.
<br />STRIP INSERTS SHALL HAVE ATTACHED RODS WITH HOODED ENDS TO ALLOW FASTENING TO
<br />REINFORCING RODS SHALL BE SIMILAR TO FEE AND MASON MANUFACTURING COMPANY.
<br />F. WHERE PIPE MOTION DUE TO EXPANSION AND CONTRACTION WILL OCCUR, MAKE SLEEVES OF
<br />SUFFICIENT DIAMETER TO PERMIT FREE MOVEMENT OF PIPE. WHERELL SLEEVES PASS
<br />INSULATED PIPES, THE SLEEVES SHALL BE LARGE ENOUGH TO PASS THE PIPE AND THE
<br />INSULATION. CHECK FLOOR AND WALL CONSTRUCTION FINISHES TO DETERMINE PROPER
<br />LENGTH OF SLEEVES FOR VARIOUS LOCATIONS.
<br />G. ESCUTCHEON PLATES SHALL BE PROVIDED FOR ALL EXPOSED UNINSULATED PIPES PASSING
<br />THROUGH WALLS, FLOORS, AND CEILINGS. PLATES SHALL BE NICKEL PLATED, OF THE SPLIT RING
<br />TYPE, OF SIZE TO MATCH THE PIPE. WHERE PLATES ARE PROVIDED FOR PIPES PASSING
<br />THROUGH SLEEVES WHICH EXTEND ABOVE THE FLOOR SURFACE, PROVIDE DEEP RECESSED
<br />PLATES TO CONCEAL PIPE SLEEVES.
<br />H. PACK THE SPACE BETWEEN SLEEVES AND STRUCTURE, AND SLEEVES AND PIPES PASSING
<br />THROUGH FIRE RATED INTERIOR WALLS, FLOORS, AND CEILINGS WITH AN APPROVED FIRE AND
<br />SMOKE PROOF PACKING MATERIAL. FIRE -STOPPING MATERIAL SHALL MAINTAIN ITS
<br />DIMENSIONS AND INTEGRITY WHILE PREVENTING THE PASSAGE OF FLAME, SMOKE, AND GASES
<br />UNDER CONDITIONS OF INSTALLATION AND USER WHEN EXPOSED TO THE ASTM E119
<br />TIME -TEMPERATURE CURVE FOR ATIME PERIOD EQUIVALENT TO THE RATING OF THE
<br />ASSEMBLY PENETRATED. COTTON WASTE SHALL NOT IGNITE WHEN PLACED IN CONTACT WITH
<br />THE NON -FIRE SIDE DURING THE TEST. FIRE -STOPPING MATERIAL SHALL BE NON-COMBUSTIBLE
<br />AS DEFINED BY ASTM E136; AND IN ADDITION, FOR INSULATION MATERIALS, MELT POINT SHALL
<br />BE A MINIMUM OF 1700 DEGREES F. FOR 1-HOUR PROTECTION AND 1850 DEGREES F. FOR
<br />2-HOUR PROTECTION.
<br />I. FASTEN SLEEVES SECURELY IN FLOORS, WALLS, ETC. SO THAT THEY WILL NOT BECOME
<br />DISPLACED WHEN CONCRETE IS POURED OR WHEN CONSTRUCTION IS BUILT AROUND THEM.
<br />TAKE PRECAUTIONS TO PREVENT CONCRETE, PLASTER, OR OTHER MATERIALS BEING FORCED
<br />INTO THE SPACE BETWEEN PIPE AND SLEEVE DURING CONSTRUCTION.
<br />17_112IIIIWA: to1111111 II1810I
<br />3.01 WATER SYSTEM:
<br />A. PIPING SHALL BE RUN PARALLEL WITH THE LINES OF THE BUILDING; WELL SUPPORTED FROM
<br />THE STRUCTURE: FREE FROM POCKETS AND SAGS: PITCHED TO DRAIN POINTS; AND INSTALLED
<br />WITH PIPE EXPANSION LOOPS, MECHANICAL EXPANSION JOINTS, PIPE GUIDES, OFFSETS AND
<br />ANCHORS TO ADEQUATELY PROVIDE FOR THERMAL EXPANSION.
<br />B. ABOVE GROUND PIPING SHALL BE INSTALLED TO PROVIDE NOT LESS THAN 3/4" SPACING FROM
<br />FINISHED COVERING TO OTHER COVERING OR SURFACES OF OTHER CONSTRUCTION. SEPARATE
<br />BELOW GROUND H & CW PIPING THAT ARE TO BE INSTALLED IN THE SAME TRENCH, BY A
<br />MINIMUM OF 12". PIPE SHALL HAVE LONG TURN RADIUS TURNS WITHOUT KINKS. PIPING SHALL
<br />NOT MAKE CONTACT WITH OTHER PIPE, CONDUIT REINFORCING STEEL OR CONCRETE.
<br />C. ALL PIPING SHALL BE PROTECTED FROM WATER HAMMER OR SHOCKS BY APPROVED WATER
<br />HAMMER ARRESTORS.
<br />D. VALVES SHALL BE INSTALLED ON BRANCHES AND AT SINGLE FIXTURES WHEN TRIM DOES NOT
<br />INCLUDE STOPS. PROVIDE CHICAGO MODEL NO. 1018 HEAVY DUTY STOPS OR APPROVED EQUAL.
<br />E. FINAL CONNECTIONS SHALL BE MADE TO ALL EQUIPMENT WITH PROPER CONNECTION
<br />WHETHER FURNISHED BY THIS CONTRACTOR OR BY OTHERS. THIS CONTRACTOR SHALL PROVIDE
<br />FAUCETS, TRAPS, STRAINERS AND SUPPLIES.
<br />3.02 DRAINAGE SYSTEMS:
<br />A. THE INTERIOR DRAINAGE SYSTEMS SHALL BE CONSTRUCTED USING MATERIALS AND METHODS
<br />AS SPECIFIED AND/OR INDICATED.
<br />B. PROVIDE PROPERLY TRAPPED AND VENTED WASTE CONNECTION TO FIXTURES, FLOOR DRAINS,
<br />AND SPECIAL EQUIPMENT.
<br />C. DRAIN PIPING SHALL BE UNIFORMLY PITCHED TO CONFORM WITH STATE AND LOCAL PLUMBING
<br />CODE.
<br />D. NOT USED
<br />E. TRAPS OF MATERIAL AND DESIGN APPROVED BY THE LATEST ADDITION OF THE APPLICABLE
<br />PLUMBING CODE SHALL BE FURNISHED & INSTALLED BY THE PLUMBING CONTRACTOR FOR ALL
<br />EQUIPMENT AND APPLIANCES. ALL TRAPS SHALL HAVE THE BOTTOM CLEANOUTS WHERE
<br />ACCESS CAN BE PROVIDED.
<br />F. CAREFULLY INSPECT FOR DAMAGED MATERIALS. RUN PIPING AS SHOWN ON THE DRAWINGS,
<br />MAKE CHANGES IN DIRECTION WITH LONG SWEEP 1/8 OR 1/16 BENDS. CONNECTIONS TO
<br />STACKS MAY BE WITH SANITARY T-FITTINGS.
<br />3.05 STERILIZATION:
<br />A. THE NEW PORTIONS OF THE POTABLE WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY
<br />FLUSHED CLEAN, DISINFECTED AND TESTED AS PER THE STATE PLUMBING CODE.
<br />3.06 COMPLETION:
<br />A. PROVIDE PROPERLY EXECUTED CERTIFICATE OF INSPECTION FROM THE LOCAL PLUMBING
<br />INSPECTORS OFFICE.
<br />B. VERIFY THAT PROJECT RECORD DOCUMENTS ARE COMPLETE AS SPECIFIED UNDER SUBMITTALS
<br />AND RECORD DOCUMENTS.
<br />3.07 SCAFFOLDING, RIGGING AND HOISTING:
<br />A. PROVIDE SCA FO SCAFFOLDING, RIGGING HOISTING AND SERVICES NECESSARY FOR DELIVERY ERECTION AND INSTALLATION OF MATERIAL, EQUIPMENT AND APPARATUS FURNISHED UNDER
<br />THIS DIVISION. REMOVE SAME FROM PREMISES UPON COMPLETION OF WORK.
<br />3.09 CUTTING AND PATCHING
<br />A. PROVIDE ALL CUTTING AN PATCHING NECESSAR T INSTALL THE WORK SPECIFIED IN THIS
<br />P E UTT D NECESSARYTO
<br />DIVISION. PATCHING SHALL MATCH ADJACENT SURFACES.
<br />B. SAW CUT, CHANNEL, CHASE, AND CORE -DRILL FLOORS, WALLS, PARTITIONS, CEILINGS, AND
<br />OTHER SURFACES
<br />T E FOR PLUMBING INSTALLATION. PERFORM CUTTING BY SKILLED
<br />E NECESSARY R 0 UM
<br />MECHANICS OF THE TRADE INVOLVED. REPAIR CUT SURFACES TO MATCH ADJACENT SURFACES.
<br />C. FIRESTOP ALLPENETRATIONS BETWEEN FLOORS &FIRE RATED WALLS.
<br />D. NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ENGINEER, & ALL
<br />SUCH CUTTING SHALL BE ACCOMPLISHED IN A MANNER DIRECTED BY THE ENGINEER.
<br />3.09 APPROVALS AND SUBSTITUTIONS
<br />A. IT IS THE INTENT OF THESE SPECIFICATIONS THAT WHEREVER A MANUFACTURER IS SPECIFIED
<br />AND SUBSTITUTIONS ARE ALLOWED, THEY SHALL CONFORM IN ALL RESPECTS TO THE SPECIFIED
<br />ITEM CRITERIA AS DELINEATED, SPECIFIED EQUIPMENT SHALL BE INTERPRETED AS MINIMUM
<br />PERFORMANCE REQUIREMENTS.
<br />B. SUBSTITUTED EQUIPMENT WHERE PERMITTED MUST CONFORM TO SPACE REQUIREMENTS.
<br />ANY SUBSTITUTED EQUIPMENTTHAT CANNOT MEET SPACE REQUIREMENTS, WHETHER
<br />APPROVED OR NOT, SHALL BE REPLACED AT THE CONTRACTOR' S EXPENSE, ANY MODIFICATION
<br />R ADDITIONAL COSTS THAT RESULT FROM SUBSTITUTED OF RELATED SYSTEMS 0 10 EQUIPMENT 0 E
<br />SHALL BE BORNE BY THIS CONTRACTOR.
<br />C. IT SHALL BE MANDATORY FOR THIS CONTRACTOR TO SUBMIT HIS BID PRICE BASED ON
<br />SPECIFIED MANUFACTURERS OR SUPPLIERS OF MATERIALS OR SERVICES. IF THE CONTRACTOR
<br />DESIRES TO , SUBSTITUTE OTHER THAN SPECIFIED HE SHALL SUBMIT SEPARATE PRICES FOR EACH
<br />U
<br />OF THESE ITEMS FOR ADDITIONS OR DEDUCTIONS TO THE BID PRICE, FOR ACCEPTANCE OR
<br />REJECTION AT THE TIME BIDS ARE DUE. SHOULD THESE SUBSTITUTIONS BE REJECTED, THE
<br />CONTRACTOR SHALL BE OBLIGED TO PROVIDE SPECIFIED MATERIALS AND SERVICES.
<br />3.10 CODES, PERMITS, TESTING AND INSPECTIONS
<br />A. ALL WORK SHALL MEET OR EXCEED LATEST REQUIREMENTS OF THE STATE BUILDING &
<br />PLUMBING CODES, LOCAL CODES AND AUTHORITIES EXERCISING JURISDICTION OVER THE WORK
<br />OF THIS PROJECT. DURING THE PROGRESS OF THE WORK IT SHALL BE SUBJECT TO THE
<br />INSPECTION OF THE OWNER, CITY AGENCIES, UTILITY INSPECTORS,AND TO SUCH OTHER
<br />INSPECTORS AS MAY HAVE JURISDICTION AT THE CONTRACTOR'S COST.
<br />B. ANY PORTION OF WORK WHICH IS NOT SUBJECTTO THE APPROVAL OF AN AUTHORITY HAVING
<br />JURISDICTION SHALL BE PROVIDED IN ACCORDANCE WITH NATIONAL FIRE PROTECTION
<br />ASSOCIATION REQUIREMENTS.
<br />C. COMPLY WITH APPLICABLE UTILITY COMPANY RULES AND REGULATIONS.
<br />D. THE CONTRACTOR SHALL SECURE REQUIRED PERMITS INSPECTION & TEST CERTIFICATES, TRANSMIT SAME TO THE OWNER AT THE COMPLETION OF THE WORK. PAY ALL ASSOCIATED
<br />FEES.
<br />E. AT COMPLETION OF THE WORK, CONTRACTOR SHALL SUBMIT TO THE OWNER'S
<br />I WRITING ASTATEMENT STATING: 1 THAT THE WORK IS COMPLETE 2 REPRESENTATIVE N W G (} E ()
<br />THAT THE ENTIRE INSTALLATION IS IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATION;
<br />3 THAT PRELIMINARY TEST HAVE BEEN MADE; AND 4 THAT THE WORK IS READY FOR FINAL
<br />INSPECTION AND TEST,
<br />F. A FINAL INSPECTION OF THE INSTALLATION TO DETERMINE COMPLIANCE WITH THE DRAWING
<br />AND SPECIFICATIONS WILL BE MADE BY THE OWNER'S REPRESENTATIVE. WORK WILL BE
<br />CHECKEDQUALITY OF MATERIALS, QUALITY OF WORKMANSHIP PROPER INSTALLATION
<br />FOR Q
<br />AND FINISHED APPEARANCE. THIS CONTRACTOR SHALL PROVIDE THE SERVICES OF THE PROJECT
<br />FOREMAN FOR INSPECTION ION PURPOSES. S. THE FOREMAN SHALL REMOVE AND REINSTALL ACCESS
<br />SE
<br />PANELS, CEILING TILES, ETC., AS REQUIRED TO FACILITATE ANY INSPECTIONS REQUIRED BY THE
<br />OWNER'S REPRESENTATIVE.
<br />G. THE CONTRACTOR SHALL ARRANGE AND CONDUCT OPERATING TESTS ON ALL EQUIPMENT IN
<br />PRESENCE
<br />THE F OWNER'S REPRESENTATIVE. THE COMPONENT PARTS OF SYSTEMS AND
<br />ENC 0 THE 0 H
<br />THE VARIOUS SYSTEMS SHALL L M DEMONSTRATED TO OPERATE IN ACCORDANCE WITH THE
<br />L BE
<br />REQUIREMENTS AND INTENT OF THIS SPECIFICATION. ANY NON -COMPLYING OR DEFECTIVE
<br />MATERIALS OR WORKMANSHIP DISCLOSED AS A RESULT OF THE INSPECTION AND TESTS SHALL
<br />BE CORRECTED PROMPTLY BY THE CONTRACTOR, AND THE TESTS REPEATED AS OFTEN AS
<br />NECESSARY UNTIL APPROVED AND ACCEPTED BY THE OWNER'S REPRESENTATIVE.
<br />3.11 SHOP DRAWINGS AND EQUIPMENT SUBMISSIONS
<br />A. LAYOUTS AND CERTIFIED EQUIPMENT MANUFACTURER'S DATA SHALL BE SUBMITTED FOR
<br />APPROVAL PRIOR TO FABRICATION, ERECTION OR PURCHASE.
<br />B. SHOP DRAWINGS SHALL INCLUDE BUT NOT NECESSARILY LIMITED TO: PLUMBING FIXTURES
<br />AND TRIM, PIPING, PIPE INSULATION, SHOCK ARRESTORS, VALVES, TRAP PRIMERS, WATER
<br />HEATERS, CLEANOUTS AND FLOOR DRAINS,
<br />C. CERTIFICATION SHALL BE SUBMITTED BY THE CONTRACTOR ATTESTING TO THE FACT THAT
<br />SPECIFIED PERFORMANCE CRITERIA ARE MET BY ALL EQUIPMENT.
<br />3.12 CLEANING AND TESTS
<br />A. THE CONTRACTOR SHALL KEEP THE BUILDING AND SITE CLEAN FROM HIS OWN RUBBISH
<br />AND/OR WASTE MATERIALS AND, UPON COMPLETION OF HIS CONTRACT, SHALL LEAVE THE
<br />BUILDING, SITE AND INSTALLATION IN A CLEAN CONDITION COMPLETELY ACCEPTABLE TO THE
<br />OWNER'S REPRESENTATIVE.
<br />B. CLEAN AND TEST ALL NEW AND EXISTING PLUMBING SYSTEMS, FIXTURES AND EQUIPMENT.
<br />C. IF ANY PART OF A SYSTEM SHOULD BE STOPPED BY ANY FOREIGN MATTER AFTER BEING PLACED
<br />IN OPERATION CLEAN AND RECONNECT SYSTEM.
<br />3.13 OPERATING AND MAINTENANCE INSTRUCTIONS
<br />A. AFTER FINAL TESTS AND ADJUSTMENTS FULLY INSTRUCT OWNER'S OPERATING PERSONNEL IN
<br />ALL DETAILS OF OPERATIONS FOR EQUIPMENT INSTALLED. A SIGNED RECEIPT WHICH SHALL BE
<br />OBTAINED FROM THE OPERATOR SHALL BE CONSTRUED AS EVIDENCE THAT INSTRUCTIONS
<br />WERE SATISFACTORY.
<br />B. FURNISH THREE (3) COPIES OF WRITTEN DESCRIPTIONS OF ALL SYSTEMS COVERING ALL
<br />MANUAL OPERATING PROCEDURES, AUTOMATIC CONTROL DESCRIPTIONS AND AUTOMATIC
<br />TEMPERATURE & PRESSURE SETTINGS WRITTEN DESCRIPTIONS SHALL INCLUDE LUBRICATION
<br />SCHEDULES, PARTS LIST, PERFORMANCE SERVICES FOR EQUIPMENT, FILTER SIZE/QUANTITY
<br />SCHEDULE, ETC. WHEN MANUFACTURER STANDARD INSTRUCTIONS ARE UTILIZED, THEY SHALL
<br />BE CLEARLY MARKED AS TO INDICATED APPLICABILITY.
<br />EPLUMBINGN ACTO HA L FURNISH THE FOLLOWING:
<br />C. AT THE END OF THE PROJECT, THE CONTRACTOR R SHALL
<br />APPROVED OPERATING INSTRUCTIONS FOR EACH PRINCIPAL ITEM OF EQUIPMENT FOR THE USE
<br />OF THE OPERATION AND MAINTENANCE PERSONNEL. THE OPERATING INSTRUCTIONS SHALL
<br />INCLUDE WIRING DIAGRAMS, CONTROL DIAGRAMS, AND CONTROL SEQUENCE FOR EACH
<br />PRINCIPAL ITEM OF EQUIPMENT. OPERATING INSTRUCTIONS SHALL BE PRINTED OR ENGRAVED,
<br />AND SHALL BE FRAMED UNDER GLASS OR IN AN APPROVED LAMINATED PLASTIC & POSTED
<br />WHERE DIRECTED BY ENGINEER. OPERATING INSTRUCTIONS SHALL BE ATTACHED TO OR POSTED
<br />ADJACENTTO EACH PRINCIPAL ITEM OF EQUIPMENT. INCLUDE START UP, PROPER
<br />ADJUSTMENT, OPERATING, LUBRICATION, SHUT -DOWN, SAFETY -PRECAUTIONS, PROCEDURE IN
<br />THE EVENT OF EQUIPMENT FAILURE, AND OTHER ITEMS OF EQUIPMENT. OPERATING
<br />INSTRUCTIONS EXPOSED TO THE WEATHER SHALL BE WEATHER PROTECTED. OPERATING
<br />INSTRUCTIONS SHALL NOT FADE WHEN EXPOSED TO SUNLIGHT & SHALL BE SECURED TO
<br />PREVENT REMOVAL OR PEELING.
<br />D. PROVIDE VALVE TAGS & CHARTS.
<br />3.14 GUARANTEES
<br />A. EXCEPT AS OTHERWISE SPECIFIED, ALL WORK SHALL BE GUARANTEED TO BE FREE FROM LEAKS
<br />OR OTHER DEFECTS RESULTING FROM THE USE OF INFERIOR MATERIALS, EQUIPMENT, OR
<br />DAMAGES TO HE
<br />WORKMANSHIP, ALL DEFECTIVE MATERIAL OR WORKMANSHIPAS WELL AS G T
<br />WORK OF ALL TRADES RESULTING FROM SAME SHALL BE REPLACED AT THE CONTRACTOR'S
<br />EXPENSE.
<br />B. THE GUARANTEE PERIOD SHALL BE FOR ONE (1) YEAR FORM THE DATE OF ACCEPTANCE, WHICH
<br />SHALL BE THE DATE OF FINAL PAYMENT OR THE DATE OF FORMAL NOTICE OF ACCEPTANCE,
<br />WHICHEVER IS EARLIER.
<br />C. CERTIFICATION SHALL BE SUBMITTED BY THE CONTRACTOR ATTESTING TO THE FACT THAT
<br />SPECIFIED PERFORMANCE CRITERIA ARE MET BY ALL EQUIPMENT.
<br />D. IF, WITHIN ANY GUARANTEE PERIOD, REPAIRS OR CHANGES TO GUARANTEED WORK ARE
<br />REQUIRED AS A RESULT OF THE USE OF DEFECTIVE MATERIALS OR EQUIPMENT, INFERIOR
<br />WORKMANSHIP OR WORK THAT IS NOT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT,
<br />AND UPON RECEIPT OF NOTICE FROM THE OWNER, THE FOLLOWING SHALL BE DONE WITHOUT
<br />EXPENSE TO THE OWNER:
<br />a. REPAIR ALL DAMAGE TO THE BUILDING OR SITE/EQUIPMENT OR CONTENTS THEREOF
<br />WHICH IS THE RESULT OF THE USE OF DEFECTIVE MATERIALS OR EQUIPMENT OR
<br />INFERIOR WORKMANSHIP, OR OF WORK NOT IN ACCORDANCE WITH THE TERMS OF
<br />THE CONTRACT.
<br />b. MAKE GOOD ANY WORK OR MATERIALS, OR THE EQUIPMENT AND CONTENTS OF SAID
<br />BUILDING OR SITE DISTURBED IN FULFILLING ANY SUCH GUARANTEE.
<br />E. IN FULFILLING THE REQUIREMENTS OF THE CONTRACT OR OF ANY GUARANTEE EMBRACED IN
<br />OR REQUIRED THEREBY, ANY WORK GUARANTEED UNDER ANOTHER CONTRACT IS DISTURBED,
<br />RESTORE SUCH DISTURBED WORK TO ORIGINAL CONDITION AND GUARANTEE SUCH RESTORED
<br />WORK TO THE SAME EXTENT AS IT WAS GUARANTEED UNDER SUCH OTHER CONTRACT.
<br />F. IF UPON FAILURE TO PROCEED PROMPTLY AFTER NOTICE TO COMPLY WITH THE TERMS OF THE
<br />GUARANTEE, THE OWNER MAY HAVE DEFECTS CORRECTED AND CONTRACTOR AND HIS
<br />SURETY SHALL BE LIABLE FOR ALL EXPENSES INCURRED.
<br />3.15 AS -BUILT DRAWINGS
<br />A. AS BUILT DRAWINGS, INDICATING ALL MODIFICATIONS RELATIVE TO CONTRACT DRAWINGS
<br />DURING THE PROGRESS OF THE WORK SHALL MAINTAIN AN ACCURATE RECORD OF ALL
<br />U G L
<br />CHANGES MADE IN THE PLUMBING SYSTEMS. THE AS BUILT DRAWINGS SHALL INCLUDE
<br />CHANGES IN MANUFACTURERS (WITH MODEL NUMBERS AND TRADE NAMES). MATERIALS,
<br />SIZES, LOCATIONS AND HOOK-UP POINTS. AS-BUILTS SHALL BE GIVEN TO OWNER'S
<br />REPRESENTATIVE AT COMPLETION OF WORK -ONE (1) REPRODUCIBLE (SEPIA) AND THREE (3)
<br />COPIES OF PRINTS.
<br />3.16 ELECTRICAL WORK
<br />A. ELECTRICAL COMPONENTS OF PLUMBING EQUIPMENT AND SYSTEMS, SUCH AS MOTORS,
<br />FACTORY MOUNTED STARTERS, FACTORY MOUNTED DISCONNECTS AND CONTROL EQUIPMENT
<br />SHALL BE PROVIDED BYTHE PLUMBING CONTRACTOR.
<br />B. TEMPERATURE CONTROL EQUIPMENT, INCLUDING AQUASTATS, ETC. SHALL BE FURNISHED BY
<br />THE PLUMBING CONTRACTOR, TEMPERATURE CONTROL WIRING NOT SPECIFICALLY SHOWN
<br />ON ELECTRICAL DRAWINGS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR. AUTOMATIC
<br />CONTROL CONTRACTOR SHALL OBTAIN HIS REQUIRED POWER FROM NEAREST SPARE BREAKERS,
<br />PROVIDE POWER TRANSFORMATION IF REQUIRED, AND ALL SYSTEM LOW VOLTAGE AND/OR
<br />LINE VOLTAGE WIRING.
<br />C. RELAYS AND WIRING REQUIRED FOR INTERLOCKING SYSTEMS SHALL BE FURNISHED AND
<br />INSTALLED BY THE PLUMBING CONTRACTOR. POWER WIRING SHALL BE PROVIDED BY THE
<br />ELECTRICAL CONTRACTOR.
<br />3.17 SAFETY
<br />A. COMPLY WITH ALL OF THE SAFETY REQUIREMENTS OF OSHA THROUGHOUT THE ENTIRE
<br />CONSTRUCTION PERIOD OF THE PROJECT.
<br />B. FURNISH, PLACE AND MAINTAIN PROPER GUARDS FOR PREVENTION OF ACCIDENTS AND ANY
<br />OTHER NECESSARY CONSTRUCTION REQUIRED TO SECURE SAFETY OF LIFE AND/OR PROPERTY
<br />3.18 REMOVAL AND ALTERATIONS
<br />A. THE CONTRACTOR SHALL REMOVE, RELOCATE, REPLACE, ADJUST, ADAPT AND MODIFY EXISTING
<br />FIXTURES AND/OR SYSTEMS AS REQUIRED BY THE DRAWINGS OR SPECIFICATIONS AND AS MAY
<br />BE REQUIRED WHEN SUCH WORK IS UNCOVERED AND FOUND TO INTERFERE WITH THE
<br />COMPLETION OF WORK IN THIS CONTRACT OR OTHER CONTRACT WORK. REMOVED ITEMS
<br />SHALL BE STORED IN A PLACE DESIGNATED D BY THE OWNER. IF HOWEVER THE OWNER DOES
<br />E
<br />NOT DESIRE TO RETAIN POSSESSION OF REMOVED ITEMS, THEY SHALL BECOME THE PROPERTY
<br />OF THE CONTRACTOR WHO SHALL REMOVE THEM FROM THE PROJECT SITE AND DISPOSE OF
<br />THEM IN A LEGAL MANNER.
<br />GENERAL NOTES:
<br />1. ALL PLUMBING ROUGHING AND MOUNTING HEIGHTS ARE TO BE IN STRICT ACCORDANCE WITH
<br />LOCAL CODES. THIS CONTRACTOR SHALL COORDINATE HIS WORK WITH FOOD SERVICE EQUIPMENT
<br />ROUGH -IN DRAWINGS AND ARCHITECTURAL DRAWINGS, AS WELL AS CONTRACTORS OF ALL OTHER
<br />TRADES, PRIOR TO INSTALLATION.
<br />2. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTING OR
<br />LOCATION OF PIPING. ANY ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER
<br />INSTALLATION AND TO MAINTAIN PROPER CLEARANCES, SHALL BE PROVIDED AND INSTALLED BY
<br />THIS CONTRACTOR. THIS CONTRACTOR SHALL PROVIDE ACCESSIBLE SANITARY CLEANOUTS AND ALL
<br />SANITARY SYSTEM VENTING AND FITTINGS AS PER LOCAL AND STATE REQUIREMENTS.
<br />3. THIS CONTRACTOR SHALL PROVIDE AND INSTALL ALL APPURTENANCES REQUIRED TO PLACE ALL
<br />FIXTURES AND EQUIPMENT IN FULL OPERATIONAL CONDITION. APPURTENANCES INCLUDE, BUT ARE
<br />NOT LIMITED TO, SHUT-OFF VALVES, FLEXIBLE RISERS, ANGLE STOPS, VACUUM BREAKERS,
<br />ESCUTCHEONS, PIPE SLEEVES, PRV'S, BACKFLOW PREVENTERS, TEMPERATURE AND PRESSURE
<br />GAUGES, T & P RELIEF VALVES, UNIONS, FLEXIBLE GAS CONNECTIONS, GAS REGULATORS, GAS COCKS,
<br />CLEANOUTS, ETC.
<br />4. ALL EXPOSED PIPING SHALL BE PAINTED TO MATCH THE APPROVAL OF THE ARCHITECT'S CRITERIA.
<br />INSTALL WATER SHOCK ARRESTORS AT EACH FIXTURE OR BATTERY OF FIXTURES. ALL INDIRECT
<br />WASTE PIPING SHALL BE COPPER AND CHROME PLATED BRASS WHERE EXPOSED.
<br />5. THIS CONTRACTOR SHALL OBTAIN DIMENSIONED ROUGHING DRAWINGS FROM EQUIPMENT
<br />SUPPLIER PRIOR TO WORK COMMENCING.
<br />6. THIS CONTRACTOR SHALL FLASH ALL FLOOR DRAINS WATERTIGHT.
<br />7. NEW 2" FLOOR DRAIN W/ ST. ST. STRAINER "P" TRAP ASSEMBLY, 2" VP UP FOR NEW ADA SHOWER
<br />DRAIN. CUT SLAB ABOVE AND CONNECT INTO EXISTING SANITARY LINES BELOW FLOOR SLAB. THIS
<br />CONTRACTOR TO FIELD VERIFY ONCE SLAB IS CUT AND CONNECT INTO THE EXISTING BATHROOM
<br />GROUPS SANITARY BRANCH MAIN IN THE PROPER DIRECTION OF FLOW AND CONNECTION
<br />REQUIREMENTS. FRENCO'S CAN NOT BE USED BELOW THE FLOOR SLAB, FITTINGS MUST BE USED.
<br />8. NEW 2" FLOOR DRAIN WITH ST. ST. STRAINER "P" TRAP ASSEMBLY, 2" VP UP FOR NEW ADA SHOWER
<br />DRAIN. THIS CONTRACTOR TO VERIFY EXACT LOCATION AND INV, ELEVATION IN THE FIELD - TYP.
<br />GENERAL PLUMBING NOTES
<br />1. CONTRACTORS SHALL VISITTHE PROJECT PRIOR TO SUBMITTAL OF PROPOSAL AND
<br />THOROUGHLY FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND CONDITIONS THAT
<br />WILL AFFECT THE PERFORMANCE OF THEIR WORK. ANY DISCREPANCIES OR QUESTIONS
<br />REGARDING THE ABOVE SHALL BE SUBMITTED IN WRITING TO THE ENGINEER PRIOR TO BIDDING
<br />FOR CLARIFICATION. FAILURE TO DO SO WILL NOT ENTITLE THEM TO ANY ADDITIONAL
<br />COMPENSATION FOR PROVIDING A COMPLETE AND APPROVED SYSTEM.
<br />2. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL FINAL PLUMBING
<br />CONNECTIONS TO EQUIPMENT SUPPLIED UNDER OTHER SECTIONS OF SPECIFICATIONS OR
<br />SUPPLIED BY THE OWNER. THE PLUMBING CONTRACTOR SHALL ALSO PROVIDE ALL INDIRECT
<br />WASTES FROM THE ABOVE MENTIONED EQUIPMENT TO FD'S. REFER TO EQUIPMENT DRAWINGS
<br />FOR SPECIFIC REQUIREMENTS INCLUDING ROUGH -IN LOCATIONS AND SIZES.
<br />3. FIRESTOP ALL PENETRATIONS BETWEEN FLOORS & FIRE RATED WALLS WITH APPROVED FIRE
<br />STOPPING ASSEMBLIES AS MANUFACTURED BY 3M INDUSTRY, HILT[ OR APPROVED EQUAL. THE
<br />ASSEMBLIES SHALL COMPLY WITH THE LATEST APPLICABLE REQUIREMENTS OF THE: BUILDING
<br />CODE, NFPA STANDARDS AND OWNERS INSURANCE COMPANY. PROPOSED APPLICABLE
<br />ASSEMBLIES SHALL BE UL LISTED AND SHALL BE PART OF THE PLUMBING EQUIPMENT
<br />SUBMITTAL.
<br />4. BEFORE COMMENCEMENT OF WORK OR ORDERING FIXTURES OR OTHER EQUIPMENT, THIS
<br />CONTRACTOR SHALL:
<br />a. VERIFY EXACT LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF EXISTING UTILITIES AND
<br />PIPING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER OF ANY
<br />DISCREPANCIES.
<br />b. COORDINATE INDICATED WORK WITH THE WORK AND CONTRACTORS OF ALL OTHER
<br />TRADES, PRIOR TO INSTALLATION.
<br />c. REVIEW ALL ARCHITECTURAL PLANS AND ENLARGED PLANS AND ELEVATIONS BEFORE ANY
<br />ROUGHING WORK OR PLUMBING WORK IS STARTED.
<br />d. PROVIDE AND INSTALL ALL PLUMBING WORK INDICATED ON PLUMBING, AND
<br />ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS
<br />OF PLUMBING FIXTURES,
<br />5, DO NOT SCALE THESE DWGS. REVIEW ARCHITECTURAL DRAWINGS FOR ROOM TYPES,
<br />I BEFORE BIDDING AND PLUMBING WORK I LOCATIONS NOTES AND DIMENSIONS BE 0 D U S STARTED.
<br />QUESTIONS REGARDING DI E D IN WRITING TO THE ENGINEER PRIOR
<br />THE ABOVE SHALL BE SUBMITT E
<br />TO BIDDING FOR CLARIFICATION. FAILURE TO DO SO WILL NOT ENTITLE THEM TO ANY
<br />ADDITIONAL COMPENSATION FOR PROVIDING A COMPLETE AND APPROVED SYSTEM.
<br />6. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTING OR
<br />LOCATION OF PIPING. ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER
<br />INSTALLATION AND TO MAINTAIN PROPER CLEARANCES SHALL BE AND INSTALLED BY THIS
<br />CONTRACTOR, STRUCTURAL MEMBERS SHALL NOT BE COMPROMISED. OFFSET PIPING AS
<br />REQUIRED TO AVOID EXISTING FIXED EQUIPMENT, PIPING & STRUCTURAL MEMBERS. DO NOT
<br />RUN IN OR THRU ELECTRICAL ROOMS AND ELEVATOR MACHINE ROOMS. ALL PIPING SHALL BE
<br />CONCEALED INSIDE WALLS, BELOW FLOORS, OR ABOVE CEILINGS UNLESS INDICATED
<br />OTHERWISE. ALL PIPES DROPPING AT COLUMNS SHALL BE INSTALLED WITHIN THE COLUMN
<br />ENCLOSURE SUCH THAT DIMENSIONS TO THE ENCLOSURE ARE NOT ALTERED.
<br />7. NOT USED.
<br />8. REFER TO ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE LOCATIONS AND MOUNTING
<br />HEIGHTS THAT SHALL BE IN STRICT ACCORDANCE WITH STATE CODES AND ADA REQUIREMENTS.
<br />THIS CONTRACTOR SHALL COORDINATE WORK INDICATED ON PLUMBING DRAWINGS WORK
<br />WITH ARCHITECTURAL DRAWINGS AS WELL AS FIELD CONDITIONS PRIOR TO INSTALLATION.
<br />FINAL LOCATION SHALL BE AS DIRECTED BY ARCHITECT.
<br />9. THE FIXTURE ROUGH -INS SHOWN ARE ACCURATE TO THE BEST AVAILABLE INFORMATION.
<br />HOWEVER, IN SOME INSTANCES, THE OWNER OR SUPPLIER MAY SUBSTITUTE OR THE
<br />EQUIPMENT ITEM MAY VARY FROM WHAT IS SHOWN. THEREFORE THE CONTRACTOR SHALL
<br />VERIFY ALL CRITICAL DIMENSIONS WITH THE OWNER PRIOR TO CONSTRUCTION. FAILURE OF
<br />THE CONTRACTOR TO VERIFY THESE DIMENSIONS SHALL PLACE THE RESPONSIBILITY FOR ANY
<br />SUBSEQUENT ACTION DIRECTLY UPON THE CONTRACTOR.
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRENCHES, COMPACTING, AND BACKFILLING FOR
<br />ALL UNDERSLAB PIPING. COORDINATE ALL UNDERGROUND PIPING WITH GRADE BEAMS, WALL
<br />FOOTINGS AND OTHER STRUCTURAL CONDITIONS. SET SLEEVES IN FLOORS AND WALLS AND
<br />ATTACHMENTS FOR HANGERS AS CONSTRUCTION PROGRESSES. ALL PENETRATIONS MUST BE
<br />SEALED AND HELD TIGHT TO COLUMNS OR WALLS AS POSSIBLE.
<br />11. THIS CONTRACTOR SHALL LOCATE VALVES, SHOCK ARRESTORS AND TRAPS IN ACCESSIBLE
<br />LOCATIONS. PROVIDE 12"x12" ACCESS PANELS WITH HINGED DOORS AND RATED WHERE
<br />REQUIRED (INCLUDING AT EXISTING VALVES ABOVE CEILINGS). FINAL LOCATIONS OF ACCESS
<br />PANELS SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. CONTRACTOR SHALL
<br />PROVIDE ACCESS PANELS IN SOLID & NON -REMOVABLE CEILINGS, WALLS AND ANY OTHER
<br />ENCLOSURES TO PROVIDE ACCESS TO BALANCING VALVES AND SHUT-OFF VALVES. SELECTION
<br />OF ACCESS PANEL TYPE, COLOR ETC. SHALL MATCH THAT OF SURROUNDING CEILING, WALL OR
<br />ENCLOSURE.
<br />12. THIS CONTRACTOR SHALL PROVIDE ALL PIPING, APPURTENANCES & FINAL CONNECTIONS
<br />REQUIRED TO LEAVE ALL EXISTING AND NEW PLUMBING SYSTEMS IN A SAFE AND OPERATIONAL
<br />CONDITION AT THE COMPLETION OF THE PROJECT. APPURTENANCES INCLUDE, BUT ARE NOT
<br />LIMITED TO: SHUT-OFF VALVES, FLEXIBLE RISERS, ANGLE STOPS, VACUUM BREAKERS,
<br />ESCUTCHEONS, TRAPS, PIPE SLEEVES, CLEANOUTS ETC.
<br />13. EXACT LOCATION OF ALL NEW FLOOR AND WALL OPENINGS SHALL BE DETERMINED IN FIELD PER
<br />EXISTING CONDITIONS AND COORDINATED WITH ALL TRADES.
<br />14. SLOPE DRAINAGE PIPING 1/8" PER FOOT UNLESS OTHERWISE NOTED.
<br />15. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS.
<br />PROVIDE INSURANCE CERTIFICATES AS MAY BE REQUIRED BY THE CONSTRUCTION MANAGER
<br />AND OWNER.
<br />16. LOCATE ALL HOSE BIBBS V-0" ABOVE FLOOR IN TOILET ROOMS. INSTALL (1) CHROME PLATED
<br />HOSE BIBB WITH VACUUM BREAKER AND LOOSE KEY OPERATION UNDER LAVATORY IN TOILET
<br />ROOMS EQUIPPED WITH FLOOR DRAINS. LOCATE EXTERIOR WALL HYDRANTS 3'-0" MINIMUM
<br />ABOVE GRADE AND AS PER CODE.
<br />17. SIZES OF CONCRETE BASES OR PADS OF ALL EQUIPMENT SHALL BE COORDINATED DURING
<br />APPROVAL OF SHOP DRAWINGS.
<br />18. SECTIONALIZING VALVES FOR ALL PUMPS, HEATERS, PLUMBING EQUIPMENT, AND BRANCH
<br />PIPING SHALL BE PROVIDED. PROVIDE A VALVED BYPASS AT ALL EQUIPMENT INCLUDING WATER
<br />HEATERS FOR MAINTENANCE OF EQUIPMENT.
<br />19. LOCATE ALL EQUIPMENT WHICH MUST BE SERVICED, OPERATED, ADJUSTED OR MAINTAINED IN
<br />FULLY ACCESSIBLE POSITIONS.
<br />20. ALL PIPING AND EQUIPMENT SHALL BE PROPERLY SUPPORTED FROM STRUCTURE. PROVIDE
<br />SUPPLEMENTARY STEEL AND SUPPORTS AS REQUIRED OR DIRECTED.
<br />21. LOCATE PIPING AND EQUIPMENT TO CLEAR ALL SERVICES. LOCATE ALL PIPING AS CLOSE AS
<br />QU I
<br />POSSIBLE TO STEEL FRAMING UNLESS OTHERWISE NOTED.
<br />22. DO NOT RUN PLUMBING PIPING THROUGH TRANSFORMER VAULTS, ELECTRICAL SWITCHGEAR
<br />ROOMS, ELECTRICAL ROOMS OR TELEPHONE ROOMS.
<br />23. PROVIDE CLEANOUTS ON DRAINAGE PIPING AT: ALL CHANGES IN DIRECTION, BASE OF STACKS,
<br />WHERE INDICATED AND AS PER PLUMBING CODE. LOCATE CLEANOUTS IN ACCESSIBLE
<br />LOCATIONS.
<br />24. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING VENTS THRU ROOFS. ALL
<br />ROOFING WORK REQUIRED TO INSTALL NEW ROOF MOUNTED EQUIPMENT OR TO MAKE
<br />PENETRATIONS THROUGH THE ROOF SHALL BE PROVIDED BY THIS CONTRACTOR AND SHALL BE
<br />ACCOMPLISHED BY A ROOFING SUB -CONTRACTOR APPROVED BY THE MANUFACTURER OF THE
<br />EXISTING ROOFING, SO AS TO MAINTAIN THE EXISTING ROOF WARRANTY.
<br />25. CONTRACTOR SHALL EXERCISE EXTREME CARE WHILE CUTTING WALL OR FLOOR SLAB NOT TO
<br />DAMAGE EXISTING UTILITIES WHICH ARE TO REMAIN.
<br />26. UTILITY SHUTDOWNS AND REMOVALS SHALL BE COORDINATED WITH THE LANDLORD &
<br />OWNERS REPRESENTATIVE AND SHALL BE ACCOMPLISHED AT A TIME CONVENIENTTO THEM.
<br />27. TRIP LEVERS FOR NEW HANDICAPPED WATER CLOSETS SHALL BE INSTALLED FACING WIDER
<br />SECTION OF HANDICAPPED STALL AS PER A.D.A. REGULATIONS.
<br />00
<br />,It
<br />O
<br />O
<br />i
<br />N
<br />N
<br />1
<br />EL-
<br />U
<br />w
<br />�_-
<br />0
<br />N
<br />w
<br />PROJECT:
<br />PINCHASERS EAST PASCO
<br />ANTHONY PERRONE
<br />6816 GALL BOULEVARD
<br />ZEPHYRHILLS, FL 33542
<br />PROJECT NUMBER: 21161
<br />M O
<br />0
<br />N U
<br />o �
<br />¢ U
<br />W
<br />i�iW
<br />r-
<br />_3�: O�
<br />V
<br />_1 ce U
<br />ceo
<br />O
<br />m
<br />W 3:
<br />x3
<br />O�
<br />0
<br />,
<br />10
<br />v
<br />o T
<br />u M 1
<br />- N �
<br />w LO
<br />r_ L0
<br />r f
<br />= CD
<br />�/ V�
<br />J 0
<br />F- �
<br />zui .
<br />w LL.
<br />u
<br />N
<br />v) N
<br />z JT
<br />.
<br />F_ I.
<br />y r-
<br />L
<br />WLu N
<br />V °O
<br />CV �
<br />('')
<br />C)
<br />a
<br />- t,
<br />, 7!!5v
<br />Ci ,* o
<br />0 a U
<br />U
<br />� (0-,
<br />O M■■� M.01
<br />E�
<br />0 r.(5r,o0
<br />W) 0
<br />• po E„i M M
<br />cl M M
<br />� U c1 (=�) O
<br />N M
<br />O M
<br />• Io � tjDtfi tn
<br />O N 0 0o0 00 O
<br />U 0 U
<br />rA 0 un j U
<br />'d .s c�., 4
<br />[�� -4111� I O C)4N
<br />�1
<br />P-�
<br />M
<br />00
<br />STAMP:
<br />"'*j-o**04 #y60#
<br />t-
<br />4-j - �/r
<br />0
<br />r
<br />*, , r
<br />W,
<br />,N
<br />I
<br />�,
<br />o r
<br />� {
<br />s � .� j
<br />:.
<br />y j'
<br />.
<br />:..
<br />a 1 F ,"
<br />f . ',�.
<br />r , C � -
<br />air.
<br />,.
<br />ar� t.
<br />t;�04i 111 +'.iiF ,t
<br />ISSUE:
<br />DATE:
<br />ISSUED FOR PERMIT
<br />01 /25/2023
<br />DRAWING SCALE: NOTED
<br />DRAWN BY: LRV
<br />CHECKED BY: FZ
<br />DRAWING TITLE:
<br />PLUMBING - SPECIFICATIONS
<br />DRAWING NUMBER:
<br />P200
<br />f�
<br />
|