Laserfiche WebLink
PART IGENERAL <br />1.01 GENERAL CONDITIONS <br />THE APPLICABLE PROVISIONS OF THE GENERAL CONSTRUCTION SPECIFICATIONS SHALL APPLY TO <br />THE FOLLOWING SPECIFICATIONS ARTICLES. <br />A. THE SPECIFICATIONS AND DRAWINGS ARE INTENDED TO SERVE JOINTLY AS A BASIS UPON <br />WHICH THE CONTRACTOR SHALL SUBMIT A CONTRACT PRICE FOR THE MATERIAL AND LABOR <br />PROVISIONS. <br />B. WHEN CONFLICTS OCCUR IN THE SPECIFICATIONS OR ON THE DRAWINGS, OR BETWEEN EITHER, <br />THE ITEMS OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. <br />C. THE CONTRACTOR SHALL PROVIDE ALL ITEMS OF LABOR AND MATERIALS NOT SPECIFICALLY <br />INDICATED, BUT REQUIRED TO COMPLETE THE INTENDED INSTALLATION. <br />D THE CONTRACTOR SHALL COORDINATE HIS WORK OR ADJUST SA T THAT F THE N ME 0 0 OTHER <br />TRADES, IN ORDER THAT CONFLICTS IN SPACE LOCATIONS DO NOT OCCUR. <br />E. THE WORK UNDER THIS CONTRACT SHALL BE PERFORMED SIMULTANEOUSLY WITH WORK OF <br />OTHER TRADES, SO AS NOT TO DELAY THE OVERALL PROGRESS OF WORK. <br />F. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK WITH ITS COMPLETION AND FINAL <br />ACCEPTANCE AND SHALL REPLACE ANY IF SAME WHICH MAY BE DAMAGED, LOST OR STOLEN, <br />WITHOUT ADDITIONAL COST TO THE OWNER. <br />G. ALL PLUMBING WORK SHALL BE PERFORMED BY A STATE LICENSED PLUMBER IN STRICT <br />ACCORDANCE WITH AHJ, STATE & LOCAL CODES AND REQUIREMENTS. <br />H. PROVIDE ALL TRANSPORTATION, FREIGHT, LOADING AND UNLOADING AND PROVIDE ALL LABOR <br />NECESSARY FOR ERECTING IN PLACE OF ALL MATERIAL AND EQUIPMENT SHOWN, SPECIFIED OR <br />REQUIRED UNDER THIS DIVISION. <br />1.02 SCOPE OF WORK: <br />A. WITHOUT LIMITING GENERALITY, PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT FOR A <br />COMPLETE PLUMBING SYSTEM AS DESCRIBED BELOW: <br />1. SANITARY, WASTE AND VENT PIPING SYSTEM. <br />2. DOMESTIC WATER PIPING SYSTEM. <br />3. PLUMBING FIXTURES & TRIM. <br />4. PIPE INSULATION, SLEEVING AND FIRESTOPPING. <br />5. HANGERS SUPPORTS ACCESS PANELS DOORS. <br />6. FLUSHING, DISINFECTING, TESTING AND BALANCING. <br />7. PERMITS & FEES. <br />8. CONNECTIONS TO EXISTING PIPING OR EQUIPMENT. <br />9. TRENCHING, BACKFILLING, COMPACTING, CORING, CUTTING, AND PATCHING. <br />10. DOMESTIC WATER HEATING SYSTEM <br />11. NATURAL GAS SYSTEM <br />12. BAR EQUIPMENT CONNECTIONS & GREASE TRAP <br />13. <br />PART II PRODUCTS <br />2.01 PIPING <br />A. WATER PIPING ABOVE SLAB, SHALL BE TYPE "L" COPPER ASTM-13-88 WITH (95-5) TIN -ANTIMONY <br />SOLDERED JOINTS & WROUGHT FITTINGS. WATER PIPING BELOW SLAB, SHALL BE TYPE "K" SOFT <br />COPPER TUBING "ONE PIECE -WITHOUT JOINTS". <br />B. ALL EXPOSED WASTE AND WATER PIPING SHALL BE CHROME PLATED. <br />C. WASTE & VENT PIPING BELOW THE SLAB, SHALL BE STANDARD WEIGHT, BELL & SPIGOT CAST <br />IRON, PIPE & FITTINGS. <br />D. WASTE AND VENT PIPING ABOVE THE SLAB, SHALL BE HUBLESS CAST IRON, PIPE & FITTINGS, <br />ASTM-A-74, MANUFACTURED AND INSTALLED IN ACCORDANCE WITH C.I.S.P.I. STANDARD 301 <br />AND PAMPHLET 100. JOINTS SHALL BE MADE WITH CLAMP RETAINER SLEEVE AND NEOPRENE <br />GASKET. NO -HUB COUPLINGS SHALL BE HEAVY DUTY C.I. COUPLINGS AS MANUFACTURED BY <br />CLAMP -ALL "125" SERIES OR HUSKY "SD 4000" SERIES. <br />E. GAS PIPING ABOVE GRADE SHALL BE SCH 40 SEAMLESS BLACK STEEL, ASTM A53 GRADE A WITH <br />MALLEABLE IRON FITTINGS CONFORMING TO ANSI/ASME B16.3. <br />F. PROVIDE ALL NECESSARY SUPPORTS, HANGERS, BRACES, ANCHORS, PADS AND ALL ELSE <br />NECESSARY FOR THE ENTIRE INSTALLATION AND TO MEETTHE INTENT OF THE SYSTEMS FOR <br />PROPER OPERATION. <br />G. PIPE AND EQUIPMENT SUSPENSION SHALL BE SUCH AS TO PREVENT EXCESSIVE STRESS, <br />EXCESSIVE VARIATION IN SUPPORTING FORCE, POSSIBLE RESONANCE WITH IMPOSED VIBRATION <br />WHILE THE SYSTEM IS IN OPERATION CREEPING, SAGGING, BUCKLING, OR MISALIGNMENT. <br />H. SYSTEMS SHALL OPERATE UNDER ALL CONDITIONS OF LOAD WITHOUT ANY OBJECTIONAL <br />SOUND OR VIBRATION. <br />1. OPENINGS IN EXTERIOR WALLS OR ROOF SHALL BE KEPT PROPERLY PLUGGED AND CAULKED AT <br />ALL TIMES EXCEPT WHEN BEING WORKED ON TO PRECLUDE THE POSSIBILITYFLOODING DUE <br />OF N <br />TO STORM OR OTHER CAUSES. AFTER COMPLETION OF WORK OPENINGS SHALL BE <br />PERMANENTLY SEALED AND CAULKED IN A MANNER APPROVED BY THE ENGINEER OR <br />ARCHITECT. <br />J. PROVIDE DI -ELECTRIC FITTINGS BETWEEN DISSIMILAR METALS. <br />2.02 BIDDING CONFLICTS: <br />A. IF CONFLICTS OCCUR WITHIN THESE SPECIFICATIONS OR ON THE DRAWINGS, OR EITHER, <br />BETWEEN THE ITEMS OF GREATER QUANTITY OR HIGHER COST SHALL BE BID AND PROVIDED. <br />2.03 SMOKE AND FIRESTOPPING: <br />A. FIRESTOP ALL PENETRATIONS BETWEEN FLOORS & FIRE RATED WALLS WITH APPROVED FIRE <br />STOPPING ASSEMBLIES AS MANUFACTURED BY 3M INDUSTRY, HILTI OR APPROVED EQUAL. THE <br />ASSEMBLIES SHALL COMPLY WITH THE LATEST APPLICABLE REQUIREMENTS OF THE: BUILDING <br />CODE, NFPA STANDARDS AND OWNERS INSURANCE COMPANY. PROPOSED APPLICABLE <br />ASSEMBLIES SHALL BE UL LISTED AND SHALL BE PART OF THE PLUMBING EQUIPMENT <br />SUBMITTAL. <br />B. ALL PIPING PASSING THROUGH FIRE -RATED WALLS, SLABS, FLOORS, ETC. SHALL HAVE STEEL <br />SLEEVES EXTENDING 2" BEYOND SURROUNDING SURFACE. THE SPACE BETWEEN THE PIPES AND <br />THE SLEEVES SHALL BE COMPLETELY PACKED WITH AN APPROVED FIRESTOPPING MATERIAL. <br />AFTER FIRESTOPPING MATERIAL HAS BEEN INSTALLED AROUND PIPES, A 26" GAUGE SHEET <br />METAL COLLAR SHALL BE SECURED AROUND THE PIPE TO INSURE TIGHTNESS. <br />2.04 INSULATION: <br />A. ALL INSULATION WHEN INSTALLED SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS <br />AS TESTED BY PROCEDURE ASTM-E-84, NFPA-255, AND UL-723, NOT EXCEEDING A FLAME <br />SPREAD OF 25 AND SMOKE DEVELOPED OF 50 WHEN COMPARED WITH RED OAK AS 100, AS <br />APPROVED UNDER NFPA AND NBFU PAMPHLET NO. 90A AND NO. 90B STANDARDS. <br />B. DOMESTIC WATER PIPING ABOVE GROUND SHALL BE INSULATED WITH FIBERGLASS INSULATION <br />WITH FACTORY -APPLIED ALL -SERVICE JACKET SECURED IN PLACE WITH SELF SEALING LAPS. <br />FITTINGS SHALL BE INSULATED WITH PREMOLDED PVC COVERS SECURED IN PLACE WITH <br />STAINLESS STEELTACKS. DOMESTIC WATER PIPING BELOW GROUND SHALL BE INSULATED WITH <br />1/2" THICK "ARMAFLEX" ELASTOMERIC UNICELLULAR SEAMLESS INSULATION. <br />C. PIPING INSULATION MATERIALS AS MANUFACTURED BY GUSTIN BACON, JOHNS MANVILLE, <br />OWENS-CORNING, KNAUF, OR CERTAIN TEED. <br />D. ABOVE GROUND PIPING: INSULATION THICKNESS: <br />1, DOMESTIC COLD WATER: 1" THICK <br />2. DOMESTIC HOT WATER & HOT WATER RETURN: 1" THICK <br />2.05 ACCESS PANELS: <br />A. FURNISH ALL ACCESS PANELS FOR WALLS AND CEILINGS. COORDINATE THE ACCESS PANEL <br />LOCATION WITH GENERAL CONTRACTOR. PIPING SHALL BE LAID OUT IN SUCH A MANNER AS TO <br />MINIMIZE THE NUMBER OF ACCESS PANELS REQUIRED. MILCOR PRODUCTS, VENTLOCK, KNAPP. <br />MINIMUM SIZE: 8" X 8". <br />B. PROVIDE ACCESS PANELS FOR ALL CLEANOUTS, VALVES, AND OTHER CONCEALED ACCESSORIES <br />REQUIRING ACCESS SUCH AS SHOCK ABSORBERS, CONTROL VALVES, PRESSURE REDUCERS, AIR <br />ARRESTORS, ETC. <br />2.06 IDENTIFICATION, MARKING AND TAGGING: <br />A. EQUIPMENT IDENTIFICATION: <br />1. MANUFACTURER'S NAMEPLATES OR TRADEMARK SHALL BE PERMANENTLY AFFIXED TO ALL <br />EQUIPMENT AND MATERIALS FURNISHED UNDER THIS DIVISION. MFG'S NAMEPLATES <br />SHALL INCLUDE ALL PERTINENT DATA RELATIVE TO THE PIECE OF EQUIPMENT INCLUDING <br />MODEL NUMBER, SERIAL NUMBER, AND OPERATING CHARACTERISTICS AS APPLICABLE. <br />2. SEPARATE EQUIPMENT IDENTIFICATION MARKERS SHALL IDENTIFY EACH ITEM OF <br />EQUIPMENT WITH A PERMANENTLY ATTACHED MARKER INDICATING DESIGNATION <br />AND/OR NUMBER CORRESPONDING TO DESIGN DOCUMENTS E.G. WH-1, WH-2, ETC. <br />3. MARKERS SHALL BE OF RIGID BLACK BAKELITE OR PHENOLIC CONSTRUCTION WITH WHITE <br />ENGRAVED OR INCISED LETTERS. <br />4. LETTERING ON EQUIPMENT MARKERS SHALL BE OF ADEQUATE SIZE TO BE LEGIBLE FROM <br />FLOOR LEVELS. MARKER LETTERING SHALL NO BE LESS THAN 1 INCH HIGH. <br />5. MOUNT EQUIPMENT IDENTIFICATION NAMEPLATES IN A CONSPICUOUS PLACE ON THE <br />EQUIPMENT. <br />6. FOR EQUIPMENT MOUNTED ABOVE THE FLOOR LEVEL, MOUNT IDENTIFICATION <br />NAMEPLATE SO THAT THEY CAN BE SEEN FROM FLOOR LEVEL. <br />7. ATTACH NAMEPLATES WITH RIVETS. <br />GENERAL PLUMBING SPECIFICATIONS <br />B. PIPING SYSTEM IDENTIFICATION: <br />1. PIPING SYSTEMS SHALL BE IDENTIFIED AS INDICATED HEREIN OR AS REQUIRED BY <br />APPLICABLE CODES AND/OR OFFICIALS HAVING JURISDICTION. <br />2. PIPE MARKERS SHALL BE COLOR CODED ACCORDING TO "TABLE 2: CLASSIFICATION OF <br />MATERIALS AND DESIGNATIONS TO COLORS" - ANSI A13.1-1981. <br />3. PIPE MARKERS SHALL INDICATE DIRECTION OF FLOW, SYSTEM, OPERATING PRESSURE AND <br />TEMPERATURE. <br />4. PIPE MARKERS SHALL BE OF THE PRESSURE SENSITIVE TYPE AS MANUFACTURED BY THE <br />SETON NAMEPLATE CORP. (F10-CODE) <br />S. PIPE MARKERS SHALL BE INSTALLED AT EVERY POINT OF ENTRY AND EXIT THROUGH FLOORS, <br />WALLS, CEILINGS OR OTHER CONCEALMENT, ON EACH RISER, TAKE -OFF AND BRANCH AND <br />AT EACH PIECE OF EQUIPMENT. <br />6. tM PE TALL N5 I MARKERS RKERS AT A DISTANCE OF NOT LESS THAN 25 FEET APART IN CONTINUOUS <br />CLEARLY VISIBLE. LENGTHS OF PIPE LINES AND ORIENTED SO THAT MARKERS ARE WHEN PIPE <br />LINES ARE LOCATED ABOVE THE NORMAL LINE OF VISION, THE MARKER SHALL BE PLACED <br />BELOW THE HORIZONTAL CENTERLINE OF THE PIPE. <br />C. VALVE IDENTIFICATION: <br />1. PROVIDE LAMINATED PLASTIC NAMEPLATES ON ALL VALVES INSTALLED UNDER DIVISION 15, <br />EXCEPT STOP VALVES IN SUPPLIES TO FIXTURES. TAGS SHALL BE CONSTRUCTED OF 0.125 <br />INCHES THICK MELAMINE PLASTIC CONFORMING TO FED. SPEC. L-P-387. SURFACE SHALL BE <br />MATTE FINISH. ACCURATELY ALIGN LETTERING AND ENGRAVE INTO WHITE CORE. <br />HALL BE 0 2 INCHES ROUND OR HEXAGONAL. LETTERING SHALL BE <br />NAMEPLATES S T R 0 <br />MINIMUM OF 0.375 INCH HIGH NORMAL BLOCK LETTERING. KEY THE NAMEPLATES TO A <br />CHART AND SCHEDULE FOR EACH SYSTEM UNDER GLASS AND PLACE WHERE DIRECTED IN <br />MECHANICAL ROOM. FURNISH FOUR COPIES OF EACH CHART AND SCHEDULE. EACH <br />INSCRIPTION SHALL IDENTIFY IT'S FUNCTION. ATTACH NAMEPLATES WITH "S" HOOKS AND <br />CHAIN TO EACH VALVE. VALVE NAMEPLATES SHALL BE NUMBERED AND "KEYED" AS <br />FOLLOWS: <br />a. PLUMBING NAMEPLATES SHALL BE RED IN COLOR AND INDICATE: <br />AA. "CW" COLD WATER <br />BB. "HW" HOT WATER -INDICATE DESIGN TEMPERATURE OF WATER <br />CC. "HWR" HOT WATER RETURN <br />b. CHART AND SCHEDULE SHALL INDICATE THE FOLLOWING INFORMATION: <br />AA. MANUFACTURER, TYPE, AND MODEL NUMBER <br />BB. CAPACITY OR SIZE <br />CC, SYSTEM IN WHICH IT IS INSTALLED <br />DD. SYSTEM OR EQUIPMENT WHICH IT CONTROLS <br />EE. LOCATION KEYED INTO VALVE NUMBER <br />c. VALVE TAGS AND CHAIN SHALL BE SECURELY ATTACHED TO THE VALVE SO THAT <br />NORMAL OPERATION OF THE VALVE OR TAMPERING WILL NOT ALLOW IT TO BE <br />REMOVED. <br />2.07 SLEEVES, INSERTS AND ESCUTCHEONS: <br />A. PROVIDE SLEEVES FOR ALL WORK PASSING THROUGH FLOOR, WALL, AND CEILING <br />CONSTRUCTION. MAINTAIN ALL RATINGS. <br />B. LOCATE AND PROVIDE SLEEVES AND INSERTS BEFORE THE FLOOR, WALL OR CEILING IS <br />CONSTRUCTED. IF THIS CONTRACTOR DOES NOT COMPLY WITH THE ABOVE, HE SHALL BEAR ALL <br />COSTS INCURRED FOR CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF SLEEVES <br />AND INSERTS. HOLES REQUIRED FOR SLEEVES IN EXISTING WALLS AND FLOORS, OR TO <br />CONFORM TO THE ABOVE, SHALL BE SAW CUT OR CORE DRILLED. THIS CONTRACTOR SHALL <br />PROVIDE ALL DRILLING REQUIRED FORTHE INSTALLATION OF HANGERS. <br />C. PIPE SLEEVES THROUGH OUTSIDE WALLS AND SLAB -ON -GRADE FLOOR SHALL BE SCHEDULE 80 <br />BLACK STEELPIPE WITH 150 LB. BLACK STEEL SLIP-ON WELDED FLANGES WELDED AT THE <br />LA <br />CENTER OF THE OUTSIDE. EXTEND SLEEVES1 2 INCHES BEYOND EACH SIDE OF THE WALL. PACK <br />THE SPACE BETWEEN SLEEVE AND PIPE WITH OAKUM TO WITHIN 2 INCHES OF EACH FACE OF <br />THE WALL. PACK THE REMAINING SPACE AND MAKE WATERTIGHT WITH AN APPROVED <br />WATERPROOF COMPOUND. (INSIDE FACE OF SLAB -ON -GRADE FLOOR.) FOR EXISTING WALL <br />CONSTRUCTION, CENTER FLANGE WILL NOT BE REQUIRED. <br />D. PIPE SLEEVES THROUGH CONCRETE FLOORS OR INTERIOR MASONRY WALLS SHALL BE SCHEDULE <br />SL S OU E E 0 <br />40 BLACK STEEL PIPE, SET FLUSH WITH FINISHED WALL OR CEILING SURFACES, BUT EXTENDING 2 <br />INCHES ABOVE FINISHED FLOORS. PLASTIC, PVC, OR LIGHT METAL SLEEVES SHALL NOT BE <br />INSTALLED. <br />E PROVIDE 0 STRIP TYPE INSERTS PRESSED STEEL CONSTRUCTION WITH <br />E. PR E R D T <br />ACCOMMODATION FOR REMOVABLE NUTS AND THREADED RODS UP TO 3/4 INCH DIAMETER, <br />PERMITTING LATERAL ADJUSTMENT. INDIVIDUAL INSERTS SHALL HAVE AN OPENING AT THE TOP <br />TO ALLOW REINFORCING RODS TO 1/2 INCH DIAMETER TO BE PASSED THROUGH THE INSERT <br />BODY AND SHALL BE SIMILAR TO FEE AND MASON MANUFACTURING COMPANY FIGURE 178. <br />STRIP INSERTS SHALL HAVE ATTACHED RODS WITH HOODED ENDS TO ALLOW FASTENING TO <br />REINFORCING RODS SHALL BE SIMILAR TO FEE AND MASON MANUFACTURING COMPANY. <br />F. WHERE PIPE MOTION DUE TO EXPANSION AND CONTRACTION WILL OCCUR, MAKE SLEEVES OF <br />SUFFICIENT DIAMETER TO PERMIT FREE MOVEMENT OF PIPE. WHERELL SLEEVES PASS <br />INSULATED PIPES, THE SLEEVES SHALL BE LARGE ENOUGH TO PASS THE PIPE AND THE <br />INSULATION. CHECK FLOOR AND WALL CONSTRUCTION FINISHES TO DETERMINE PROPER <br />LENGTH OF SLEEVES FOR VARIOUS LOCATIONS. <br />G. ESCUTCHEON PLATES SHALL BE PROVIDED FOR ALL EXPOSED UNINSULATED PIPES PASSING <br />THROUGH WALLS, FLOORS, AND CEILINGS. PLATES SHALL BE NICKEL PLATED, OF THE SPLIT RING <br />TYPE, OF SIZE TO MATCH THE PIPE. WHERE PLATES ARE PROVIDED FOR PIPES PASSING <br />THROUGH SLEEVES WHICH EXTEND ABOVE THE FLOOR SURFACE, PROVIDE DEEP RECESSED <br />PLATES TO CONCEAL PIPE SLEEVES. <br />H. PACK THE SPACE BETWEEN SLEEVES AND STRUCTURE, AND SLEEVES AND PIPES PASSING <br />THROUGH FIRE RATED INTERIOR WALLS, FLOORS, AND CEILINGS WITH AN APPROVED FIRE AND <br />SMOKE PROOF PACKING MATERIAL. FIRE -STOPPING MATERIAL SHALL MAINTAIN ITS <br />DIMENSIONS AND INTEGRITY WHILE PREVENTING THE PASSAGE OF FLAME, SMOKE, AND GASES <br />UNDER CONDITIONS OF INSTALLATION AND USER WHEN EXPOSED TO THE ASTM E119 <br />TIME -TEMPERATURE CURVE FOR ATIME PERIOD EQUIVALENT TO THE RATING OF THE <br />ASSEMBLY PENETRATED. COTTON WASTE SHALL NOT IGNITE WHEN PLACED IN CONTACT WITH <br />THE NON -FIRE SIDE DURING THE TEST. FIRE -STOPPING MATERIAL SHALL BE NON-COMBUSTIBLE <br />AS DEFINED BY ASTM E136; AND IN ADDITION, FOR INSULATION MATERIALS, MELT POINT SHALL <br />BE A MINIMUM OF 1700 DEGREES F. FOR 1-HOUR PROTECTION AND 1850 DEGREES F. FOR <br />2-HOUR PROTECTION. <br />I. FASTEN SLEEVES SECURELY IN FLOORS, WALLS, ETC. SO THAT THEY WILL NOT BECOME <br />DISPLACED WHEN CONCRETE IS POURED OR WHEN CONSTRUCTION IS BUILT AROUND THEM. <br />TAKE PRECAUTIONS TO PREVENT CONCRETE, PLASTER, OR OTHER MATERIALS BEING FORCED <br />INTO THE SPACE BETWEEN PIPE AND SLEEVE DURING CONSTRUCTION. <br />17_112IIIIWA: to1111111 II1810I <br />3.01 WATER SYSTEM: <br />A. PIPING SHALL BE RUN PARALLEL WITH THE LINES OF THE BUILDING; WELL SUPPORTED FROM <br />THE STRUCTURE: FREE FROM POCKETS AND SAGS: PITCHED TO DRAIN POINTS; AND INSTALLED <br />WITH PIPE EXPANSION LOOPS, MECHANICAL EXPANSION JOINTS, PIPE GUIDES, OFFSETS AND <br />ANCHORS TO ADEQUATELY PROVIDE FOR THERMAL EXPANSION. <br />B. ABOVE GROUND PIPING SHALL BE INSTALLED TO PROVIDE NOT LESS THAN 3/4" SPACING FROM <br />FINISHED COVERING TO OTHER COVERING OR SURFACES OF OTHER CONSTRUCTION. SEPARATE <br />BELOW GROUND H & CW PIPING THAT ARE TO BE INSTALLED IN THE SAME TRENCH, BY A <br />MINIMUM OF 12". PIPE SHALL HAVE LONG TURN RADIUS TURNS WITHOUT KINKS. PIPING SHALL <br />NOT MAKE CONTACT WITH OTHER PIPE, CONDUIT REINFORCING STEEL OR CONCRETE. <br />C. ALL PIPING SHALL BE PROTECTED FROM WATER HAMMER OR SHOCKS BY APPROVED WATER <br />HAMMER ARRESTORS. <br />D. VALVES SHALL BE INSTALLED ON BRANCHES AND AT SINGLE FIXTURES WHEN TRIM DOES NOT <br />INCLUDE STOPS. PROVIDE CHICAGO MODEL NO. 1018 HEAVY DUTY STOPS OR APPROVED EQUAL. <br />E. FINAL CONNECTIONS SHALL BE MADE TO ALL EQUIPMENT WITH PROPER CONNECTION <br />WHETHER FURNISHED BY THIS CONTRACTOR OR BY OTHERS. THIS CONTRACTOR SHALL PROVIDE <br />FAUCETS, TRAPS, STRAINERS AND SUPPLIES. <br />3.02 DRAINAGE SYSTEMS: <br />A. THE INTERIOR DRAINAGE SYSTEMS SHALL BE CONSTRUCTED USING MATERIALS AND METHODS <br />AS SPECIFIED AND/OR INDICATED. <br />B. PROVIDE PROPERLY TRAPPED AND VENTED WASTE CONNECTION TO FIXTURES, FLOOR DRAINS, <br />AND SPECIAL EQUIPMENT. <br />C. DRAIN PIPING SHALL BE UNIFORMLY PITCHED TO CONFORM WITH STATE AND LOCAL PLUMBING <br />CODE. <br />D. NOT USED <br />E. TRAPS OF MATERIAL AND DESIGN APPROVED BY THE LATEST ADDITION OF THE APPLICABLE <br />PLUMBING CODE SHALL BE FURNISHED & INSTALLED BY THE PLUMBING CONTRACTOR FOR ALL <br />EQUIPMENT AND APPLIANCES. ALL TRAPS SHALL HAVE THE BOTTOM CLEANOUTS WHERE <br />ACCESS CAN BE PROVIDED. <br />F. CAREFULLY INSPECT FOR DAMAGED MATERIALS. RUN PIPING AS SHOWN ON THE DRAWINGS, <br />MAKE CHANGES IN DIRECTION WITH LONG SWEEP 1/8 OR 1/16 BENDS. CONNECTIONS TO <br />STACKS MAY BE WITH SANITARY T-FITTINGS. <br />3.05 STERILIZATION: <br />A. THE NEW PORTIONS OF THE POTABLE WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY <br />FLUSHED CLEAN, DISINFECTED AND TESTED AS PER THE STATE PLUMBING CODE. <br />3.06 COMPLETION: <br />A. PROVIDE PROPERLY EXECUTED CERTIFICATE OF INSPECTION FROM THE LOCAL PLUMBING <br />INSPECTORS OFFICE. <br />B. VERIFY THAT PROJECT RECORD DOCUMENTS ARE COMPLETE AS SPECIFIED UNDER SUBMITTALS <br />AND RECORD DOCUMENTS. <br />3.07 SCAFFOLDING, RIGGING AND HOISTING: <br />A. PROVIDE SCA FO SCAFFOLDING, RIGGING HOISTING AND SERVICES NECESSARY FOR DELIVERY ERECTION AND INSTALLATION OF MATERIAL, EQUIPMENT AND APPARATUS FURNISHED UNDER <br />THIS DIVISION. REMOVE SAME FROM PREMISES UPON COMPLETION OF WORK. <br />3.09 CUTTING AND PATCHING <br />A. PROVIDE ALL CUTTING AN PATCHING NECESSAR T INSTALL THE WORK SPECIFIED IN THIS <br />P E UTT D NECESSARYTO <br />DIVISION. PATCHING SHALL MATCH ADJACENT SURFACES. <br />B. SAW CUT, CHANNEL, CHASE, AND CORE -DRILL FLOORS, WALLS, PARTITIONS, CEILINGS, AND <br />OTHER SURFACES <br />T E FOR PLUMBING INSTALLATION. PERFORM CUTTING BY SKILLED <br />E NECESSARY R 0 UM <br />MECHANICS OF THE TRADE INVOLVED. REPAIR CUT SURFACES TO MATCH ADJACENT SURFACES. <br />C. FIRESTOP ALLPENETRATIONS BETWEEN FLOORS &FIRE RATED WALLS. <br />D. NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ENGINEER, & ALL <br />SUCH CUTTING SHALL BE ACCOMPLISHED IN A MANNER DIRECTED BY THE ENGINEER. <br />3.09 APPROVALS AND SUBSTITUTIONS <br />A. IT IS THE INTENT OF THESE SPECIFICATIONS THAT WHEREVER A MANUFACTURER IS SPECIFIED <br />AND SUBSTITUTIONS ARE ALLOWED, THEY SHALL CONFORM IN ALL RESPECTS TO THE SPECIFIED <br />ITEM CRITERIA AS DELINEATED, SPECIFIED EQUIPMENT SHALL BE INTERPRETED AS MINIMUM <br />PERFORMANCE REQUIREMENTS. <br />B. SUBSTITUTED EQUIPMENT WHERE PERMITTED MUST CONFORM TO SPACE REQUIREMENTS. <br />ANY SUBSTITUTED EQUIPMENTTHAT CANNOT MEET SPACE REQUIREMENTS, WHETHER <br />APPROVED OR NOT, SHALL BE REPLACED AT THE CONTRACTOR' S EXPENSE, ANY MODIFICATION <br />R ADDITIONAL COSTS THAT RESULT FROM SUBSTITUTED OF RELATED SYSTEMS 0 10 EQUIPMENT 0 E <br />SHALL BE BORNE BY THIS CONTRACTOR. <br />C. IT SHALL BE MANDATORY FOR THIS CONTRACTOR TO SUBMIT HIS BID PRICE BASED ON <br />SPECIFIED MANUFACTURERS OR SUPPLIERS OF MATERIALS OR SERVICES. IF THE CONTRACTOR <br />DESIRES TO , SUBSTITUTE OTHER THAN SPECIFIED HE SHALL SUBMIT SEPARATE PRICES FOR EACH <br />U <br />OF THESE ITEMS FOR ADDITIONS OR DEDUCTIONS TO THE BID PRICE, FOR ACCEPTANCE OR <br />REJECTION AT THE TIME BIDS ARE DUE. SHOULD THESE SUBSTITUTIONS BE REJECTED, THE <br />CONTRACTOR SHALL BE OBLIGED TO PROVIDE SPECIFIED MATERIALS AND SERVICES. <br />3.10 CODES, PERMITS, TESTING AND INSPECTIONS <br />A. ALL WORK SHALL MEET OR EXCEED LATEST REQUIREMENTS OF THE STATE BUILDING & <br />PLUMBING CODES, LOCAL CODES AND AUTHORITIES EXERCISING JURISDICTION OVER THE WORK <br />OF THIS PROJECT. DURING THE PROGRESS OF THE WORK IT SHALL BE SUBJECT TO THE <br />INSPECTION OF THE OWNER, CITY AGENCIES, UTILITY INSPECTORS,AND TO SUCH OTHER <br />INSPECTORS AS MAY HAVE JURISDICTION AT THE CONTRACTOR'S COST. <br />B. ANY PORTION OF WORK WHICH IS NOT SUBJECTTO THE APPROVAL OF AN AUTHORITY HAVING <br />JURISDICTION SHALL BE PROVIDED IN ACCORDANCE WITH NATIONAL FIRE PROTECTION <br />ASSOCIATION REQUIREMENTS. <br />C. COMPLY WITH APPLICABLE UTILITY COMPANY RULES AND REGULATIONS. <br />D. THE CONTRACTOR SHALL SECURE REQUIRED PERMITS INSPECTION & TEST CERTIFICATES, TRANSMIT SAME TO THE OWNER AT THE COMPLETION OF THE WORK. PAY ALL ASSOCIATED <br />FEES. <br />E. AT COMPLETION OF THE WORK, CONTRACTOR SHALL SUBMIT TO THE OWNER'S <br />I WRITING ASTATEMENT STATING: 1 THAT THE WORK IS COMPLETE 2 REPRESENTATIVE N W G (} E () <br />THAT THE ENTIRE INSTALLATION IS IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATION; <br />3 THAT PRELIMINARY TEST HAVE BEEN MADE; AND 4 THAT THE WORK IS READY FOR FINAL <br />INSPECTION AND TEST, <br />F. A FINAL INSPECTION OF THE INSTALLATION TO DETERMINE COMPLIANCE WITH THE DRAWING <br />AND SPECIFICATIONS WILL BE MADE BY THE OWNER'S REPRESENTATIVE. WORK WILL BE <br />CHECKEDQUALITY OF MATERIALS, QUALITY OF WORKMANSHIP PROPER INSTALLATION <br />FOR Q <br />AND FINISHED APPEARANCE. THIS CONTRACTOR SHALL PROVIDE THE SERVICES OF THE PROJECT <br />FOREMAN FOR INSPECTION ION PURPOSES. S. THE FOREMAN SHALL REMOVE AND REINSTALL ACCESS <br />SE <br />PANELS, CEILING TILES, ETC., AS REQUIRED TO FACILITATE ANY INSPECTIONS REQUIRED BY THE <br />OWNER'S REPRESENTATIVE. <br />G. THE CONTRACTOR SHALL ARRANGE AND CONDUCT OPERATING TESTS ON ALL EQUIPMENT IN <br />PRESENCE <br />THE F OWNER'S REPRESENTATIVE. THE COMPONENT PARTS OF SYSTEMS AND <br />ENC 0 THE 0 H <br />THE VARIOUS SYSTEMS SHALL L M DEMONSTRATED TO OPERATE IN ACCORDANCE WITH THE <br />L BE <br />REQUIREMENTS AND INTENT OF THIS SPECIFICATION. ANY NON -COMPLYING OR DEFECTIVE <br />MATERIALS OR WORKMANSHIP DISCLOSED AS A RESULT OF THE INSPECTION AND TESTS SHALL <br />BE CORRECTED PROMPTLY BY THE CONTRACTOR, AND THE TESTS REPEATED AS OFTEN AS <br />NECESSARY UNTIL APPROVED AND ACCEPTED BY THE OWNER'S REPRESENTATIVE. <br />3.11 SHOP DRAWINGS AND EQUIPMENT SUBMISSIONS <br />A. LAYOUTS AND CERTIFIED EQUIPMENT MANUFACTURER'S DATA SHALL BE SUBMITTED FOR <br />APPROVAL PRIOR TO FABRICATION, ERECTION OR PURCHASE. <br />B. SHOP DRAWINGS SHALL INCLUDE BUT NOT NECESSARILY LIMITED TO: PLUMBING FIXTURES <br />AND TRIM, PIPING, PIPE INSULATION, SHOCK ARRESTORS, VALVES, TRAP PRIMERS, WATER <br />HEATERS, CLEANOUTS AND FLOOR DRAINS, <br />C. CERTIFICATION SHALL BE SUBMITTED BY THE CONTRACTOR ATTESTING TO THE FACT THAT <br />SPECIFIED PERFORMANCE CRITERIA ARE MET BY ALL EQUIPMENT. <br />3.12 CLEANING AND TESTS <br />A. THE CONTRACTOR SHALL KEEP THE BUILDING AND SITE CLEAN FROM HIS OWN RUBBISH <br />AND/OR WASTE MATERIALS AND, UPON COMPLETION OF HIS CONTRACT, SHALL LEAVE THE <br />BUILDING, SITE AND INSTALLATION IN A CLEAN CONDITION COMPLETELY ACCEPTABLE TO THE <br />OWNER'S REPRESENTATIVE. <br />B. CLEAN AND TEST ALL NEW AND EXISTING PLUMBING SYSTEMS, FIXTURES AND EQUIPMENT. <br />C. IF ANY PART OF A SYSTEM SHOULD BE STOPPED BY ANY FOREIGN MATTER AFTER BEING PLACED <br />IN OPERATION CLEAN AND RECONNECT SYSTEM. <br />3.13 OPERATING AND MAINTENANCE INSTRUCTIONS <br />A. AFTER FINAL TESTS AND ADJUSTMENTS FULLY INSTRUCT OWNER'S OPERATING PERSONNEL IN <br />ALL DETAILS OF OPERATIONS FOR EQUIPMENT INSTALLED. A SIGNED RECEIPT WHICH SHALL BE <br />OBTAINED FROM THE OPERATOR SHALL BE CONSTRUED AS EVIDENCE THAT INSTRUCTIONS <br />WERE SATISFACTORY. <br />B. FURNISH THREE (3) COPIES OF WRITTEN DESCRIPTIONS OF ALL SYSTEMS COVERING ALL <br />MANUAL OPERATING PROCEDURES, AUTOMATIC CONTROL DESCRIPTIONS AND AUTOMATIC <br />TEMPERATURE & PRESSURE SETTINGS WRITTEN DESCRIPTIONS SHALL INCLUDE LUBRICATION <br />SCHEDULES, PARTS LIST, PERFORMANCE SERVICES FOR EQUIPMENT, FILTER SIZE/QUANTITY <br />SCHEDULE, ETC. WHEN MANUFACTURER STANDARD INSTRUCTIONS ARE UTILIZED, THEY SHALL <br />BE CLEARLY MARKED AS TO INDICATED APPLICABILITY. <br />EPLUMBINGN ACTO HA L FURNISH THE FOLLOWING: <br />C. AT THE END OF THE PROJECT, THE CONTRACTOR R SHALL <br />APPROVED OPERATING INSTRUCTIONS FOR EACH PRINCIPAL ITEM OF EQUIPMENT FOR THE USE <br />OF THE OPERATION AND MAINTENANCE PERSONNEL. THE OPERATING INSTRUCTIONS SHALL <br />INCLUDE WIRING DIAGRAMS, CONTROL DIAGRAMS, AND CONTROL SEQUENCE FOR EACH <br />PRINCIPAL ITEM OF EQUIPMENT. OPERATING INSTRUCTIONS SHALL BE PRINTED OR ENGRAVED, <br />AND SHALL BE FRAMED UNDER GLASS OR IN AN APPROVED LAMINATED PLASTIC & POSTED <br />WHERE DIRECTED BY ENGINEER. OPERATING INSTRUCTIONS SHALL BE ATTACHED TO OR POSTED <br />ADJACENTTO EACH PRINCIPAL ITEM OF EQUIPMENT. INCLUDE START UP, PROPER <br />ADJUSTMENT, OPERATING, LUBRICATION, SHUT -DOWN, SAFETY -PRECAUTIONS, PROCEDURE IN <br />THE EVENT OF EQUIPMENT FAILURE, AND OTHER ITEMS OF EQUIPMENT. OPERATING <br />INSTRUCTIONS EXPOSED TO THE WEATHER SHALL BE WEATHER PROTECTED. OPERATING <br />INSTRUCTIONS SHALL NOT FADE WHEN EXPOSED TO SUNLIGHT & SHALL BE SECURED TO <br />PREVENT REMOVAL OR PEELING. <br />D. PROVIDE VALVE TAGS & CHARTS. <br />3.14 GUARANTEES <br />A. EXCEPT AS OTHERWISE SPECIFIED, ALL WORK SHALL BE GUARANTEED TO BE FREE FROM LEAKS <br />OR OTHER DEFECTS RESULTING FROM THE USE OF INFERIOR MATERIALS, EQUIPMENT, OR <br />DAMAGES TO HE <br />WORKMANSHIP, ALL DEFECTIVE MATERIAL OR WORKMANSHIPAS WELL AS G T <br />WORK OF ALL TRADES RESULTING FROM SAME SHALL BE REPLACED AT THE CONTRACTOR'S <br />EXPENSE. <br />B. THE GUARANTEE PERIOD SHALL BE FOR ONE (1) YEAR FORM THE DATE OF ACCEPTANCE, WHICH <br />SHALL BE THE DATE OF FINAL PAYMENT OR THE DATE OF FORMAL NOTICE OF ACCEPTANCE, <br />WHICHEVER IS EARLIER. <br />C. CERTIFICATION SHALL BE SUBMITTED BY THE CONTRACTOR ATTESTING TO THE FACT THAT <br />SPECIFIED PERFORMANCE CRITERIA ARE MET BY ALL EQUIPMENT. <br />D. IF, WITHIN ANY GUARANTEE PERIOD, REPAIRS OR CHANGES TO GUARANTEED WORK ARE <br />REQUIRED AS A RESULT OF THE USE OF DEFECTIVE MATERIALS OR EQUIPMENT, INFERIOR <br />WORKMANSHIP OR WORK THAT IS NOT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT, <br />AND UPON RECEIPT OF NOTICE FROM THE OWNER, THE FOLLOWING SHALL BE DONE WITHOUT <br />EXPENSE TO THE OWNER: <br />a. REPAIR ALL DAMAGE TO THE BUILDING OR SITE/EQUIPMENT OR CONTENTS THEREOF <br />WHICH IS THE RESULT OF THE USE OF DEFECTIVE MATERIALS OR EQUIPMENT OR <br />INFERIOR WORKMANSHIP, OR OF WORK NOT IN ACCORDANCE WITH THE TERMS OF <br />THE CONTRACT. <br />b. MAKE GOOD ANY WORK OR MATERIALS, OR THE EQUIPMENT AND CONTENTS OF SAID <br />BUILDING OR SITE DISTURBED IN FULFILLING ANY SUCH GUARANTEE. <br />E. IN FULFILLING THE REQUIREMENTS OF THE CONTRACT OR OF ANY GUARANTEE EMBRACED IN <br />OR REQUIRED THEREBY, ANY WORK GUARANTEED UNDER ANOTHER CONTRACT IS DISTURBED, <br />RESTORE SUCH DISTURBED WORK TO ORIGINAL CONDITION AND GUARANTEE SUCH RESTORED <br />WORK TO THE SAME EXTENT AS IT WAS GUARANTEED UNDER SUCH OTHER CONTRACT. <br />F. IF UPON FAILURE TO PROCEED PROMPTLY AFTER NOTICE TO COMPLY WITH THE TERMS OF THE <br />GUARANTEE, THE OWNER MAY HAVE DEFECTS CORRECTED AND CONTRACTOR AND HIS <br />SURETY SHALL BE LIABLE FOR ALL EXPENSES INCURRED. <br />3.15 AS -BUILT DRAWINGS <br />A. AS BUILT DRAWINGS, INDICATING ALL MODIFICATIONS RELATIVE TO CONTRACT DRAWINGS <br />DURING THE PROGRESS OF THE WORK SHALL MAINTAIN AN ACCURATE RECORD OF ALL <br />U G L <br />CHANGES MADE IN THE PLUMBING SYSTEMS. THE AS BUILT DRAWINGS SHALL INCLUDE <br />CHANGES IN MANUFACTURERS (WITH MODEL NUMBERS AND TRADE NAMES). MATERIALS, <br />SIZES, LOCATIONS AND HOOK-UP POINTS. AS-BUILTS SHALL BE GIVEN TO OWNER'S <br />REPRESENTATIVE AT COMPLETION OF WORK -ONE (1) REPRODUCIBLE (SEPIA) AND THREE (3) <br />COPIES OF PRINTS. <br />3.16 ELECTRICAL WORK <br />A. ELECTRICAL COMPONENTS OF PLUMBING EQUIPMENT AND SYSTEMS, SUCH AS MOTORS, <br />FACTORY MOUNTED STARTERS, FACTORY MOUNTED DISCONNECTS AND CONTROL EQUIPMENT <br />SHALL BE PROVIDED BYTHE PLUMBING CONTRACTOR. <br />B. TEMPERATURE CONTROL EQUIPMENT, INCLUDING AQUASTATS, ETC. SHALL BE FURNISHED BY <br />THE PLUMBING CONTRACTOR, TEMPERATURE CONTROL WIRING NOT SPECIFICALLY SHOWN <br />ON ELECTRICAL DRAWINGS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR. AUTOMATIC <br />CONTROL CONTRACTOR SHALL OBTAIN HIS REQUIRED POWER FROM NEAREST SPARE BREAKERS, <br />PROVIDE POWER TRANSFORMATION IF REQUIRED, AND ALL SYSTEM LOW VOLTAGE AND/OR <br />LINE VOLTAGE WIRING. <br />C. RELAYS AND WIRING REQUIRED FOR INTERLOCKING SYSTEMS SHALL BE FURNISHED AND <br />INSTALLED BY THE PLUMBING CONTRACTOR. POWER WIRING SHALL BE PROVIDED BY THE <br />ELECTRICAL CONTRACTOR. <br />3.17 SAFETY <br />A. COMPLY WITH ALL OF THE SAFETY REQUIREMENTS OF OSHA THROUGHOUT THE ENTIRE <br />CONSTRUCTION PERIOD OF THE PROJECT. <br />B. FURNISH, PLACE AND MAINTAIN PROPER GUARDS FOR PREVENTION OF ACCIDENTS AND ANY <br />OTHER NECESSARY CONSTRUCTION REQUIRED TO SECURE SAFETY OF LIFE AND/OR PROPERTY <br />3.18 REMOVAL AND ALTERATIONS <br />A. THE CONTRACTOR SHALL REMOVE, RELOCATE, REPLACE, ADJUST, ADAPT AND MODIFY EXISTING <br />FIXTURES AND/OR SYSTEMS AS REQUIRED BY THE DRAWINGS OR SPECIFICATIONS AND AS MAY <br />BE REQUIRED WHEN SUCH WORK IS UNCOVERED AND FOUND TO INTERFERE WITH THE <br />COMPLETION OF WORK IN THIS CONTRACT OR OTHER CONTRACT WORK. REMOVED ITEMS <br />SHALL BE STORED IN A PLACE DESIGNATED D BY THE OWNER. IF HOWEVER THE OWNER DOES <br />E <br />NOT DESIRE TO RETAIN POSSESSION OF REMOVED ITEMS, THEY SHALL BECOME THE PROPERTY <br />OF THE CONTRACTOR WHO SHALL REMOVE THEM FROM THE PROJECT SITE AND DISPOSE OF <br />THEM IN A LEGAL MANNER. <br />GENERAL NOTES: <br />1. ALL PLUMBING ROUGHING AND MOUNTING HEIGHTS ARE TO BE IN STRICT ACCORDANCE WITH <br />LOCAL CODES. THIS CONTRACTOR SHALL COORDINATE HIS WORK WITH FOOD SERVICE EQUIPMENT <br />ROUGH -IN DRAWINGS AND ARCHITECTURAL DRAWINGS, AS WELL AS CONTRACTORS OF ALL OTHER <br />TRADES, PRIOR TO INSTALLATION. <br />2. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTING OR <br />LOCATION OF PIPING. ANY ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER <br />INSTALLATION AND TO MAINTAIN PROPER CLEARANCES, SHALL BE PROVIDED AND INSTALLED BY <br />THIS CONTRACTOR. THIS CONTRACTOR SHALL PROVIDE ACCESSIBLE SANITARY CLEANOUTS AND ALL <br />SANITARY SYSTEM VENTING AND FITTINGS AS PER LOCAL AND STATE REQUIREMENTS. <br />3. THIS CONTRACTOR SHALL PROVIDE AND INSTALL ALL APPURTENANCES REQUIRED TO PLACE ALL <br />FIXTURES AND EQUIPMENT IN FULL OPERATIONAL CONDITION. APPURTENANCES INCLUDE, BUT ARE <br />NOT LIMITED TO, SHUT-OFF VALVES, FLEXIBLE RISERS, ANGLE STOPS, VACUUM BREAKERS, <br />ESCUTCHEONS, PIPE SLEEVES, PRV'S, BACKFLOW PREVENTERS, TEMPERATURE AND PRESSURE <br />GAUGES, T & P RELIEF VALVES, UNIONS, FLEXIBLE GAS CONNECTIONS, GAS REGULATORS, GAS COCKS, <br />CLEANOUTS, ETC. <br />4. ALL EXPOSED PIPING SHALL BE PAINTED TO MATCH THE APPROVAL OF THE ARCHITECT'S CRITERIA. <br />INSTALL WATER SHOCK ARRESTORS AT EACH FIXTURE OR BATTERY OF FIXTURES. ALL INDIRECT <br />WASTE PIPING SHALL BE COPPER AND CHROME PLATED BRASS WHERE EXPOSED. <br />5. THIS CONTRACTOR SHALL OBTAIN DIMENSIONED ROUGHING DRAWINGS FROM EQUIPMENT <br />SUPPLIER PRIOR TO WORK COMMENCING. <br />6. THIS CONTRACTOR SHALL FLASH ALL FLOOR DRAINS WATERTIGHT. <br />7. NEW 2" FLOOR DRAIN W/ ST. ST. STRAINER "P" TRAP ASSEMBLY, 2" VP UP FOR NEW ADA SHOWER <br />DRAIN. CUT SLAB ABOVE AND CONNECT INTO EXISTING SANITARY LINES BELOW FLOOR SLAB. THIS <br />CONTRACTOR TO FIELD VERIFY ONCE SLAB IS CUT AND CONNECT INTO THE EXISTING BATHROOM <br />GROUPS SANITARY BRANCH MAIN IN THE PROPER DIRECTION OF FLOW AND CONNECTION <br />REQUIREMENTS. FRENCO'S CAN NOT BE USED BELOW THE FLOOR SLAB, FITTINGS MUST BE USED. <br />8. NEW 2" FLOOR DRAIN WITH ST. ST. STRAINER "P" TRAP ASSEMBLY, 2" VP UP FOR NEW ADA SHOWER <br />DRAIN. THIS CONTRACTOR TO VERIFY EXACT LOCATION AND INV, ELEVATION IN THE FIELD - TYP. <br />GENERAL PLUMBING NOTES <br />1. CONTRACTORS SHALL VISITTHE PROJECT PRIOR TO SUBMITTAL OF PROPOSAL AND <br />THOROUGHLY FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND CONDITIONS THAT <br />WILL AFFECT THE PERFORMANCE OF THEIR WORK. ANY DISCREPANCIES OR QUESTIONS <br />REGARDING THE ABOVE SHALL BE SUBMITTED IN WRITING TO THE ENGINEER PRIOR TO BIDDING <br />FOR CLARIFICATION. FAILURE TO DO SO WILL NOT ENTITLE THEM TO ANY ADDITIONAL <br />COMPENSATION FOR PROVIDING A COMPLETE AND APPROVED SYSTEM. <br />2. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL FINAL PLUMBING <br />CONNECTIONS TO EQUIPMENT SUPPLIED UNDER OTHER SECTIONS OF SPECIFICATIONS OR <br />SUPPLIED BY THE OWNER. THE PLUMBING CONTRACTOR SHALL ALSO PROVIDE ALL INDIRECT <br />WASTES FROM THE ABOVE MENTIONED EQUIPMENT TO FD'S. REFER TO EQUIPMENT DRAWINGS <br />FOR SPECIFIC REQUIREMENTS INCLUDING ROUGH -IN LOCATIONS AND SIZES. <br />3. FIRESTOP ALL PENETRATIONS BETWEEN FLOORS & FIRE RATED WALLS WITH APPROVED FIRE <br />STOPPING ASSEMBLIES AS MANUFACTURED BY 3M INDUSTRY, HILT[ OR APPROVED EQUAL. THE <br />ASSEMBLIES SHALL COMPLY WITH THE LATEST APPLICABLE REQUIREMENTS OF THE: BUILDING <br />CODE, NFPA STANDARDS AND OWNERS INSURANCE COMPANY. PROPOSED APPLICABLE <br />ASSEMBLIES SHALL BE UL LISTED AND SHALL BE PART OF THE PLUMBING EQUIPMENT <br />SUBMITTAL. <br />4. BEFORE COMMENCEMENT OF WORK OR ORDERING FIXTURES OR OTHER EQUIPMENT, THIS <br />CONTRACTOR SHALL: <br />a. VERIFY EXACT LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF EXISTING UTILITIES AND <br />PIPING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER OF ANY <br />DISCREPANCIES. <br />b. COORDINATE INDICATED WORK WITH THE WORK AND CONTRACTORS OF ALL OTHER <br />TRADES, PRIOR TO INSTALLATION. <br />c. REVIEW ALL ARCHITECTURAL PLANS AND ENLARGED PLANS AND ELEVATIONS BEFORE ANY <br />ROUGHING WORK OR PLUMBING WORK IS STARTED. <br />d. PROVIDE AND INSTALL ALL PLUMBING WORK INDICATED ON PLUMBING, AND <br />ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS <br />OF PLUMBING FIXTURES, <br />5, DO NOT SCALE THESE DWGS. REVIEW ARCHITECTURAL DRAWINGS FOR ROOM TYPES, <br />I BEFORE BIDDING AND PLUMBING WORK I LOCATIONS NOTES AND DIMENSIONS BE 0 D U S STARTED. <br />QUESTIONS REGARDING DI E D IN WRITING TO THE ENGINEER PRIOR <br />THE ABOVE SHALL BE SUBMITT E <br />TO BIDDING FOR CLARIFICATION. FAILURE TO DO SO WILL NOT ENTITLE THEM TO ANY <br />ADDITIONAL COMPENSATION FOR PROVIDING A COMPLETE AND APPROVED SYSTEM. <br />6. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTING OR <br />LOCATION OF PIPING. ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER <br />INSTALLATION AND TO MAINTAIN PROPER CLEARANCES SHALL BE AND INSTALLED BY THIS <br />CONTRACTOR, STRUCTURAL MEMBERS SHALL NOT BE COMPROMISED. OFFSET PIPING AS <br />REQUIRED TO AVOID EXISTING FIXED EQUIPMENT, PIPING & STRUCTURAL MEMBERS. DO NOT <br />RUN IN OR THRU ELECTRICAL ROOMS AND ELEVATOR MACHINE ROOMS. ALL PIPING SHALL BE <br />CONCEALED INSIDE WALLS, BELOW FLOORS, OR ABOVE CEILINGS UNLESS INDICATED <br />OTHERWISE. ALL PIPES DROPPING AT COLUMNS SHALL BE INSTALLED WITHIN THE COLUMN <br />ENCLOSURE SUCH THAT DIMENSIONS TO THE ENCLOSURE ARE NOT ALTERED. <br />7. NOT USED. <br />8. REFER TO ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE LOCATIONS AND MOUNTING <br />HEIGHTS THAT SHALL BE IN STRICT ACCORDANCE WITH STATE CODES AND ADA REQUIREMENTS. <br />THIS CONTRACTOR SHALL COORDINATE WORK INDICATED ON PLUMBING DRAWINGS WORK <br />WITH ARCHITECTURAL DRAWINGS AS WELL AS FIELD CONDITIONS PRIOR TO INSTALLATION. <br />FINAL LOCATION SHALL BE AS DIRECTED BY ARCHITECT. <br />9. THE FIXTURE ROUGH -INS SHOWN ARE ACCURATE TO THE BEST AVAILABLE INFORMATION. <br />HOWEVER, IN SOME INSTANCES, THE OWNER OR SUPPLIER MAY SUBSTITUTE OR THE <br />EQUIPMENT ITEM MAY VARY FROM WHAT IS SHOWN. THEREFORE THE CONTRACTOR SHALL <br />VERIFY ALL CRITICAL DIMENSIONS WITH THE OWNER PRIOR TO CONSTRUCTION. FAILURE OF <br />THE CONTRACTOR TO VERIFY THESE DIMENSIONS SHALL PLACE THE RESPONSIBILITY FOR ANY <br />SUBSEQUENT ACTION DIRECTLY UPON THE CONTRACTOR. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRENCHES, COMPACTING, AND BACKFILLING FOR <br />ALL UNDERSLAB PIPING. COORDINATE ALL UNDERGROUND PIPING WITH GRADE BEAMS, WALL <br />FOOTINGS AND OTHER STRUCTURAL CONDITIONS. SET SLEEVES IN FLOORS AND WALLS AND <br />ATTACHMENTS FOR HANGERS AS CONSTRUCTION PROGRESSES. ALL PENETRATIONS MUST BE <br />SEALED AND HELD TIGHT TO COLUMNS OR WALLS AS POSSIBLE. <br />11. THIS CONTRACTOR SHALL LOCATE VALVES, SHOCK ARRESTORS AND TRAPS IN ACCESSIBLE <br />LOCATIONS. PROVIDE 12"x12" ACCESS PANELS WITH HINGED DOORS AND RATED WHERE <br />REQUIRED (INCLUDING AT EXISTING VALVES ABOVE CEILINGS). FINAL LOCATIONS OF ACCESS <br />PANELS SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. CONTRACTOR SHALL <br />PROVIDE ACCESS PANELS IN SOLID & NON -REMOVABLE CEILINGS, WALLS AND ANY OTHER <br />ENCLOSURES TO PROVIDE ACCESS TO BALANCING VALVES AND SHUT-OFF VALVES. SELECTION <br />OF ACCESS PANEL TYPE, COLOR ETC. SHALL MATCH THAT OF SURROUNDING CEILING, WALL OR <br />ENCLOSURE. <br />12. THIS CONTRACTOR SHALL PROVIDE ALL PIPING, APPURTENANCES & FINAL CONNECTIONS <br />REQUIRED TO LEAVE ALL EXISTING AND NEW PLUMBING SYSTEMS IN A SAFE AND OPERATIONAL <br />CONDITION AT THE COMPLETION OF THE PROJECT. APPURTENANCES INCLUDE, BUT ARE NOT <br />LIMITED TO: SHUT-OFF VALVES, FLEXIBLE RISERS, ANGLE STOPS, VACUUM BREAKERS, <br />ESCUTCHEONS, TRAPS, PIPE SLEEVES, CLEANOUTS ETC. <br />13. EXACT LOCATION OF ALL NEW FLOOR AND WALL OPENINGS SHALL BE DETERMINED IN FIELD PER <br />EXISTING CONDITIONS AND COORDINATED WITH ALL TRADES. <br />14. SLOPE DRAINAGE PIPING 1/8" PER FOOT UNLESS OTHERWISE NOTED. <br />15. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS. <br />PROVIDE INSURANCE CERTIFICATES AS MAY BE REQUIRED BY THE CONSTRUCTION MANAGER <br />AND OWNER. <br />16. LOCATE ALL HOSE BIBBS V-0" ABOVE FLOOR IN TOILET ROOMS. INSTALL (1) CHROME PLATED <br />HOSE BIBB WITH VACUUM BREAKER AND LOOSE KEY OPERATION UNDER LAVATORY IN TOILET <br />ROOMS EQUIPPED WITH FLOOR DRAINS. LOCATE EXTERIOR WALL HYDRANTS 3'-0" MINIMUM <br />ABOVE GRADE AND AS PER CODE. <br />17. SIZES OF CONCRETE BASES OR PADS OF ALL EQUIPMENT SHALL BE COORDINATED DURING <br />APPROVAL OF SHOP DRAWINGS. <br />18. SECTIONALIZING VALVES FOR ALL PUMPS, HEATERS, PLUMBING EQUIPMENT, AND BRANCH <br />PIPING SHALL BE PROVIDED. PROVIDE A VALVED BYPASS AT ALL EQUIPMENT INCLUDING WATER <br />HEATERS FOR MAINTENANCE OF EQUIPMENT. <br />19. LOCATE ALL EQUIPMENT WHICH MUST BE SERVICED, OPERATED, ADJUSTED OR MAINTAINED IN <br />FULLY ACCESSIBLE POSITIONS. <br />20. ALL PIPING AND EQUIPMENT SHALL BE PROPERLY SUPPORTED FROM STRUCTURE. PROVIDE <br />SUPPLEMENTARY STEEL AND SUPPORTS AS REQUIRED OR DIRECTED. <br />21. LOCATE PIPING AND EQUIPMENT TO CLEAR ALL SERVICES. LOCATE ALL PIPING AS CLOSE AS <br />QU I <br />POSSIBLE TO STEEL FRAMING UNLESS OTHERWISE NOTED. <br />22. DO NOT RUN PLUMBING PIPING THROUGH TRANSFORMER VAULTS, ELECTRICAL SWITCHGEAR <br />ROOMS, ELECTRICAL ROOMS OR TELEPHONE ROOMS. <br />23. PROVIDE CLEANOUTS ON DRAINAGE PIPING AT: ALL CHANGES IN DIRECTION, BASE OF STACKS, <br />WHERE INDICATED AND AS PER PLUMBING CODE. LOCATE CLEANOUTS IN ACCESSIBLE <br />LOCATIONS. <br />24. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING VENTS THRU ROOFS. ALL <br />ROOFING WORK REQUIRED TO INSTALL NEW ROOF MOUNTED EQUIPMENT OR TO MAKE <br />PENETRATIONS THROUGH THE ROOF SHALL BE PROVIDED BY THIS CONTRACTOR AND SHALL BE <br />ACCOMPLISHED BY A ROOFING SUB -CONTRACTOR APPROVED BY THE MANUFACTURER OF THE <br />EXISTING ROOFING, SO AS TO MAINTAIN THE EXISTING ROOF WARRANTY. <br />25. CONTRACTOR SHALL EXERCISE EXTREME CARE WHILE CUTTING WALL OR FLOOR SLAB NOT TO <br />DAMAGE EXISTING UTILITIES WHICH ARE TO REMAIN. <br />26. UTILITY SHUTDOWNS AND REMOVALS SHALL BE COORDINATED WITH THE LANDLORD & <br />OWNERS REPRESENTATIVE AND SHALL BE ACCOMPLISHED AT A TIME CONVENIENTTO THEM. <br />27. TRIP LEVERS FOR NEW HANDICAPPED WATER CLOSETS SHALL BE INSTALLED FACING WIDER <br />SECTION OF HANDICAPPED STALL AS PER A.D.A. REGULATIONS. <br />00 <br />,It <br />O <br />O <br />i <br />N <br />N <br />1 <br />EL- <br />U <br />w <br />�_- <br />0 <br />N <br />w <br />PROJECT: <br />PINCHASERS EAST PASCO <br />ANTHONY PERRONE <br />6816 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33542 <br />PROJECT NUMBER: 21161 <br />M O <br />0 <br />N U <br />o � <br />¢ U <br />W <br />i�iW <br />r- <br />_3�: O� <br />V <br />_1 ce U <br />ceo <br />O <br />m <br />W 3: <br />x3 <br />O� <br />0 <br />, <br />10 <br />v <br />o T <br />u M 1 <br />- N � <br />w LO <br />r_ L0 <br />r f <br />= CD <br />�/ V� <br />J 0 <br />F- � <br />zui . <br />w LL. <br />u <br />N <br />v) N <br />z JT <br />. <br />F_ I. <br />y r- <br />L <br />WLu N <br />V °O <br />CV � <br />('') <br />C) <br />a <br />- t, <br />, 7!!5v <br />Ci ,* o <br />0 a U <br />U <br />� (0-, <br />O M■■� M.01 <br />E� <br />0 r.(5r,o0 <br />W) 0 <br />• po E„i M M <br />cl M M <br />� U c1 (=�) O <br />N M <br />O M <br />• Io � tjDtfi tn <br />O N 0 0o0 00 O <br />U 0 U <br />rA 0 un j U <br />'d .s c�., 4 <br />[�� -4111� I O C)4N <br />�1 <br />P-� <br />M <br />00 <br />STAMP: <br />"'*j-o**04 #y60# <br />t- <br />4-j - �/r <br />0 <br />r <br />*, , r <br />W, <br />,N <br />I <br />�, <br />o r <br />� { <br />s � .� j <br />:. <br />y j' <br />. <br />:.. <br />a 1 F ," <br />f . ',�. <br />r , C � - <br />air. <br />,. <br />ar� t. <br />t;�04i 111 +'.iiF ,t <br />ISSUE: <br />DATE: <br />ISSUED FOR PERMIT <br />01 /25/2023 <br />DRAWING SCALE: NOTED <br />DRAWN BY: LRV <br />CHECKED BY: FZ <br />DRAWING TITLE: <br />PLUMBING - SPECIFICATIONS <br />DRAWING NUMBER: <br />P200 <br />f� <br />