Laserfiche WebLink
2 ROWS 8d @ 6" O.C. <br />8d NAILS @ 6" O.C= <br />TO BLOCKING <br />(2) 12d NAILS <br />TO BLOCKING USP— <br />TRUSSES SUH24 <br />2X4 BLOCKING-' <br />AT EA. ROOF <br />PANEL JOINT AT USP SPT24- <br />48" O.C. MAX @ EACH STUD <br />2x4 SPF STUDS <br />@ 16" O.C. <br />USP SPT22 - <br />@ EACH STUD <br />(2) SYP#2 TOP PLATE <br />ROOF OR <br />FLOOR SHEATHING <br />LSTA12 EACH SIDE <br />@ EACH END OF WALL <br />STRUCTURAL SHEATHING <br />(MIN. 7/16"). NAIL w/10d @ <br />3" O.C. EDGES STAGGERED <br />& 6" O.C. INTERIOR - EXTEND <br />TO ROOF SHEATHING <br />1/2"x 12" A.BOLT 6" FROM ENDS <br />THEN 32" O.C. - OR 5/8" w/8 1/2" <br />EMBED WEDGE BOLT 6" FROM ENDS <br />THEN 32" O.C. W/#3 PT SYP <br />BASE PLATE <br />D <br />�____=�. �'e .�b•e SEE PLAN FOR DIM. <br />D • D • • D •�.I\ Q•DI�e <br />•4 4\ 1 <br />�•e s•S;rb•e s e e s e s•e <br />.e <� 40 .e 4D .e G .•e CN-I <br />D D I <br />4" 16" 14" SEE FND. PLAN <br />FOR FOOTING SPECS. <br />INTERIOR SHEARWALL @ TRUSSES <br />18 STEP-DOWN WA TO TRUSS <br />S-6J NO SCALE REV. 9/30/03 AS <br />SHEAR CAP. 500#/LIN. FT. <br />SEE STRUCTURAL NOTES AND NAI!_INCx <br />SCHEDULE FOR SHEATHING DETAIf_-%r <br />� VARIES w/ ROOF <br />SLOPE <br />GIRDER <br />SEE PLN. <br />FOR LOCATION <br />2X4 SPF BLOCKING <br />BETWEEN TRUSSES <br />e 24" O.G. MAX,w/ <br />2 X 4 CONT. AT <br />C2J16d EA. END CT"r .J <br />2'-0" O.C. WITH <br />USP MP34 a <br />16d NAILS AT <br />(2) 16d NAILS <br />2'-0" ON CENTER <br />8" O.C. MAX. <br />EACH TRUSS <br />SEE PLN. <br />1/2" SPAC <br />SHEATHING <br />USP 5PT24 TOP <br />(2) USP RT3 <br />USP 5PT22 BOT <br />(1) AT EACH BLOCK <br />OF EAGH STUD <br />TO G.T. & (1) G.T. TO <br />2x4 SPF TO 8'-5" <br />HIP JACK <br />I - H — r- <br />-9.2 EXTERIOR NON BRG. WALL DETAIL <br />CJ'_6 J N.T.S. <br />AC K <br />'RUSS <br />12 <br />5 <br />Aa <br />1/2" CEILING BOARDJ <br />USP SPT24 AT TOP <br />AND USP SPT22 AT BOTTOM <br />1/2" DRYWALL <br />OPTION: <br />MAXIMUM OF (3) 2 X 4 PLATES MAY BE <br />ADDED BELOW THE HEADER W/ EACH <br />PLY ATTACHED W/ (2) ROWS OF 16d <br />NAILS AT 8" O.C. <br />SEE 26/S-4 OR 27/S-4 <br />FOR MORE INFO @ OPENING <br />NOTE: 40" MAX. SILL <br />HGT. ON ALL BEDROOM <br />WINDOWS. <br />(2) 2 x SILL <br />1/2" DRYWAL <br />R-11 F.G. BATTS <br />WOOD BASE <br />CONIC SLAB <br />6 X 6 10/10 W.W.M. <br />6 MIL VISOUEENrt <br />PRE-ENG. WD TRUSSES @ 24" O.C. <br />INSULATION BAFFLE <br />BATT OR BLOWN INSULATION MIN. R-19 <br />/ TRUSS ANCHOR (SEE PLAN) <br />FIBERGLASS SHINGLE <br />ROOFING FELT <br />SEE ROOFING SCHEDULE <br />�! METAL DRIP EDGE <br />�2" X SUBFASCIA <br />CONT. VENTED ALUM SOFFIT <br />O.H. (2)-2" X 12" SYP BM. OR WIF85 <br />=E ELEV. (UNLESS OTHERWISE NOTED- SEE PLAN) <br />NAIL @ 6" O.C. <br />W/2-2" X 4" SPF TOP PLATES <br />MIN. SPLICE 48" W/12d @ 6" O.C. <br />—ALUM FRAMED WINDOW w/ SCREEN <br />CEMENTITIOUS DECORATIVE FINISH <br />7/8" THICK PER ASTM C-926-98A <br />2" X 4" @ 16" O.C. <br />W/2-12d EA. END W/ APA RATED <br />STRUCTURAL SHEATHING (MIN. 7/16") <br />NAIL 3" O.C. TOP & BOTTOM, 4" C. <br />SIDES & 6" O.C. INTERIOR <br />P.T. 2" X 4" #2 SYP BASE PLATE <br />w/1/2" X 8" A.B. OR 5/8"X7" <br />WEDGE BOLT, w/2" WASHER @ <br />32" O.C. MIN. 6" FROM END <br />GRADE <br />TOP OF SLAB <br />TREATED NQuo 0 <br />N <br />CLEAN FILL;,- m <br />SEE FOUNDATION PLAN <br />9 TYPICAL WALL SECTION <br />NEXTERIOR\ FRAME <br />C_68-12-03 REV. AS. SCALE: 1/2" = 1'-O" <br />u- � 4 ¢ 10 <br />® <br />O �%% Z <br />,,; o Ort0 <br />�o2 �.� O z <br />Z � C� cn � <br />W x��0 N u' in <br />TOP SPLICE F- Y¢ N a- z <br />TYVEK 0 < 0 < 0 <br />TAR PAPER WRAPPED 6" DOUBLE 10d _ U- w z0 U o o J <br />UP EXTERIOR FRAME WALL 2"x TOP PLATE 1/4" MIN. SPACE 2g�, o LLI Y < o .� w m <br />AND SEALED BY TYVEK M/,y Q I-¢ Z z O L) <br />INSTALLER <br />DECO FINISH W/ o ¢ z + w <br />STOP VULKEM 0 w cn <br />CAULKED TO 2 ROWS L>_ CD Z- w o w m ,� <br />TERMITE SHIELD - 2"x STUD @ 10d @ 6" 0/C W o o COuj o� o u- <br />24" O.C. MAX. o w o Y z �'� m o <br />TERMITE SHIELD Q <br />=w0¢ DI ¢.j mm <br />2"x P.T. PLATE 0' Z) o z _j 000 000 <br />NOTE: Cn a cwn ¢ uo 0 00 00 <br />-BOTTOM SPLICE w w o o 0 <br />PLATE LENGTHS MUST BE > ¢ z m + + 0) ¢ <br />OVER STUD ¢o�¢o <br />AT LEAST 8'-0" LONG. TYPICAL <br />TYPICAL INTERIOR <br />EXT. FRAME WALL 3 _Cn w Z 0, <br />r5_"*TOP PLATE SPLICE DETAIL <br />('20'NTERMITE DETAIL- z w � N ; z <br />mzoo <br />�_6SCALE: N.T.S. SCALE: N.T.S. o¢ o J o z <br />Ln 0 <br />�-6N.T.S w¢vc7 =_*°a' I= 0000 <br />zcivz ~�u"1.Ld O rZ <br />ZLu 00W Z O E �t Cn o <br />wz(ncozoLL oa0 N Cn Qw <br />��� Ow�Zd' LL <br />°m,� rI <br />Z Lu..I — <br />O g> W O p m N m O N Z cI <br />"S" NAIL O¢m=wm��� W 'ANNwp <br />2 - S.P.F. CONST. GRADE TOP PLATE , 3/8 SPACING l 3/8 m o o z = a a a o _ or? = a � <br />SPLICE MIN 48" APART 3/4„ 1/ 1/2' 7 fir. Q W L) ui � � rn w <br />S_ _� - i S 1/-��� ~ooz�o���c�l O ii a=1-w0 ¢ <br />1� �i = _" "= F = = i� =u= =u r--- b----� I— Y (n 0 i' En (n❑❑ LLLL ¢ o_ (n 0 Z 0 <br />II I I II II I I II II II ° <br />II II I II III I I II II II SINGLE NAIL EDGE SPACING S �N <br />c DOUBLE NAIL EDGES ACING `'€"❑ <br />II ° II I II III III <br />OPENING ® NAIL AT BASE 2 ROWS @ 4" O.C. W/8d COMMON NAIL ❑ <br />II II II I III <br />LL' <br />II,I�I �IIII, __ I,�III _I„II IIIIIIII c IIIIIIII IIIIIIII <br />II II I QQ NAIL AT TOP PLATE TWO ROWS @ 4" O.C. W/8d COMMON NAIL <br />W <br />NAIL OPENING PERIMETER C@ 3" O.C. W/8d COMMON NAIL <br />QNAIL INT. AT 6" O.C. W/8d COMMON NAIL <br />II II I �- <br />n <br />❑ <br />II II I � STAGGER ALL VERT. JOINTS & NAIL @ 4" O.C. <br />FLOOR SYSTEM IW/8d COMMON NAIL <br />2x8 P.T.'s LL PLATE NO SPLICE @ HEADER - NAIL SHEATHING TO <br />A F <br />HEADER W 8d COMMON NAIL@ 4" o/c <br />(2 STORY ONLY) / / '" Z IN2x4 P.T. BASE PLATE " t > ❑ �) <br />/'�7WALL SHEATHING INSTALL. & NAILING SCHED. N m <br />�-6NO SCALE REV. 02-11-04 MD 4 W <br />w <br />❑ mPI <br />In <br />IL <br />L\ <br />W <br />Z <br />>` ❑ <br />13 <br />z w <br />� z <br />wEnLu <br />J <br />zcn <br />Q N w M — <br />C7 - Q O p <br />O ❑ ❑Lij OU <br />J <br />2❑I—W Ll <br />❑¢w UJ(nCr <br />='� <br />�Z <br />PRE ENGINEERED WD <br />TRUSSES @ 24" O.C. <br />INSULATION BAFFLE z <br />O <br />12 BATT OR BLOWN INSULATION MIN. R-19 v) <br />TRUSS ANCHOR (SEE PLAN) w Lo <br />FIBERGLASS SHINGLE N 07 � o <br />ROOFING FELT Lo O ¢ M <br />APA RATED STRUCTURAL SHEATHING N <br />MIN 7/16" FASTENED TO TRUSSES 00 <br />' PER ROOF NAILING SCHEDULE W -10 <br />'--------- I Of lo <br />SEE STRUCTURAL NOTES AND NAILING ^ , <br />SCHEDULE FOR SHEATHING DETAIL 1/2" CEILING BOARD "*----METAL DRIP EDGE ` y <br />3/4" P.T. NAILER <br />1/2" DRYWALL 2" X SUBFASCIA O w <br />CONT. VENTED ALUM SOFFIT <br />CURTAIN NAILER 8" X 8" X 16" K.O. LINTEL BLOCK O 0 <br />2 X 4 NAILER TO 2X4 SPF BLOCKING 1 X 4 P.T. @ WINDOWS O.H. W/1 #5 DIA. REBAR & J W <br />HIP GIRDER GIRDER TRUSS. BETWEEN TRUSSES TRUSSES 1 X 8 P.T. @ S.G.D. SEE ELEV. 3000 PSI CONCRETE () z w z <br />TRUSS END NAIL W 2 - 12d EAC @ 24" O.C. MAX.w/ SEE PLN. PRECAST " U " LINTEL W_/ 1-#5 CONT. IN N < ¢ (z <br />/ N _ <br />WEB CROSSING (2)16d EA. END (TYP.) 3000 PSI CONC. @ OP GS. 6'-0" &OVER. z w - <br />JACK PRECAST "U" LINTEL ALL OPENINGS 0 z o <br />MATCH TRUSS UNDER 6'-0". ' 0 0 0 0- <br />[BOTTOM PROFILE FILL CELL -1 #5 DIA. REBAR W/ 3000 PSI Z p Z o <br />MARBLE STOOL CONC. ALL LOCATIONS SHOWN ON J O p w 0_ <br />_ _ _ _ _ FOUNDATION & FLOOR PLANS ^' = r- LL <br />USP MP34 @ 1 X 2 P.T FURRING ALUM FRAMED WINDOW W/ SCREEN w ` V ~ w � <br />DBL. 1j2" SPACE _ � ¢ <br />EACH BLOCK HEIGHT R-4.2 FOIL INSUL ON EXT w w <br />PLATE VARIES BLOCK WALLS PRECAST CONC SILL 0 07 : z <br />UA:... <br />USP SPT24 TOP 1 X 4 P.T. BASE NAILER 8" X 8" X 16" CONC. BLOCK W O <br />w <br />.. __USP SPT22 BOT___________________ oZ D o <br />SEE PL (2) USP RT3 OF EACH STUD WOOD BASE CEMENTITIOUS Lo —� ¢ <br />T7T7 (1) AT EACH BLOCK 2X4 BLOCKING CONIC SLAB DECORATIVE FINISH z O }' 3: o <br />FTG. DOWEL #5 DIA. REBAR z �- z = w <br />TO G.T. & (1) G.T. TO o= <br />6 X 6 10/10 W.W.M 18" IN CONC. -25" EXTEND (ACI 530) Z w <br />HIP JACK SHEATHING 0 ❑- Z O <br />ABOVE SLAB. ALL LOCATIONS w ¢ m z = <br />FILLER BLOCK 2x4 SPF TO 8'-0" 6 MIL VISQUEEN SHOWN ON FOUNDATION PLAN J („) ¢ <br />Cn <br />AT 16" O.C. NAIL @ 16" O.C. - GRADE D_ <br />TO STUD AT WALL RAKE CUT WALL TOP OF SLAB <br />W/ 4 - 12d. END NAIL TOP TO MATCH VAULTED - - - — - — - SHEET N0. � <br />TO TRUSS GIRDER TRUSS BOTTOM .= _ i;: ; ,°.', _ 3:u = o <br />p 0 p <br />N OS-6 <br />w <br />TREATED f• ¢ CLEAN FIL <br />Z \ I co <br />^OF = <br />SEE FOUNDATION C V J <br />K1'9.1 EXTERIOR NON BRG. WALL DETAIL w L <br />0 <br />S-6 AT HIP CONDITION W/ INT. VOL. CLG. �8TYPICAL WALL SECTIOWNCRETE BLOCK LAST PLOT DATE <br />N <br />/�+ March 11, 2005 <br />N.T.S. REV. 3-3-04 AS S_V SCALE: 1/2" = 1'-0" REV. 9-3-02 MKD/mk O <br />z J DETAI LS <br />