Laserfiche WebLink
CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />5'-0" <br />STUB -OUT FOR <br />GAS METER 0 — <br />O <br />1 <br />CV <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLS60ROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'4" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2) 16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15'4" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />w <br />15/32" CDX <br />Q <br />PLYWOOD OR <br />O <br />7/16" OSB <br />RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE <br />140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8o i JNG SHANK NAILS @ 6" O.C. & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS <br />8d RING SHANK NAILS @ 6" O.C. EDGES & <br />8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113INCH NOMINAL SHANK DIAMETER <br />0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />1b TO 20 RINGS PER INCH <br />16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH <br />2-3/8 INCH NAIL LENGTH <br />NOTE: * FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />9lF <br />+ <br />+ <br />+ + <br />+ + <br />+++ <br />+++ <br />+ <br />+ <br />+ <br />+ t <br />+ + <br />+ + <br />+ + + + <br />+ <br />+ <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" or 7/8" <br />5000s 1.8/1.7 <br />wood panels <br />Two 3/4" wood panels or 2 x <br />P — <br />1-1 /8" or two 1 /2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1 /8" or two 1 /2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />902.0 <br />2x — lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking <br />4'1/8" gap <br />k <br />N1 <br />FILL CELL <br />BOND BEAM STEP <br />#5 CONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />1/8" min. ) Small gap 21"' min. <br />2" <br />max. � 4 max. <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB we stiffener 2" min. <br />required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing, <br />OF THE JOIST ASA REQUIRED LEAVING%" GAP @ TOP sides by 6". - Hangers with sides not containing t. WEB STIFFENER <br />DOUBLE JOIST CONNECTION top flangeuthcuis. <br />- Birdsmouth cuts. N.T.S. <br />- Under 2nd floor coh imn w/ InwiQ <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for appropriate <br />zor=11sinler <br />details in <br />One 10d box <br />areas=20 of high <br />lateral load. <br />t <br />T <br />nail each side <br />at bearing. <br />Squash block <br />(2x4 minimum) <br />Bearing wall, Vern ' am LVL or <br />Glulam Beam O <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />J for each lapped joist. <br />Odnails SECTION @ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />❑ (o <br />A 1Y," ROUND HOLE MAY 61" 6"" DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1Y2" <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer 61 <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Use 10dx3" nails at <br />blocking panel *Non -stacking walls <br />require additional consideration. <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series De th End Intermediate <br />® <br />BCI5000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5- d <br />BCI 6000s® <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC160se <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />13C190SO <br />1 - / " <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />w/ (22) <br />NAILS 1 <br />5/8"o <br />THRU <br />BOLT <br />SIMPSC <br />w/ (22) . <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />III 0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 I <br />Plumbing H ETAL20 INSTALLATION <br />Joist <br />n joists meet over wall, provide <br />" minimum bearing for each. I -Joist can be offsetuJ <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />ki <br />Round tie Diameter (in) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7' <br />-87 5 <br />`Its <br />11 <br />12 <br />13 <br />Reotenguler Hole Side (in) <br />2 <br />S <br />$ <br />9 <br />10i <br />Any 16" joist <br />Span (ft) <br />a <br />'-0„ <br />-I" <br />V-2`" <br />V-2" <br />V-3"" <br />1'-3" <br />1'-7" <br />1'�-11" <br />2-4"" <br />2"-9" <br />3'_2" <br />7" <br />12 <br />1`-O" <br />1 "- '" <br />1"-2" <br />1 r-2'" <br />V-3" <br />1 a-9" <br />2'-4" <br />2°-11'" <br />3'-7" <br />4"-2" <br />4'-0" <br />5-4" <br />16 <br />1'-C" <br />V-1" <br />V-2" <br />V-2" <br />V-7" <br />2'�-5"w <br />3'-2"° <br />3',10'. <br />4.-�," <br />5"-7„ <br />6"-4" <br />7w-2," <br />20 <br />11"-0"" <br />i 1-1"" <br />1' 2ww <br />1%2" <br />2'"-0" <br />V' 0" <br />4`-0" <br />4%10r" <br />M-2y`] <br />CS'-11;" <br />' 11"24 <br />1" 0," <br />1"-1""1'-2°°1°-3w" <br />a_5"e3w-7"w4rewa5"-10w"8"-4"" <br />'-6" <br />10< 0" 1 <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1%" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />�nstall tight to top flange. <br />A <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1/4%2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />" depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />° <br />U00 <br />FINISH GRADE <br />SLEEVE THRU STEMS <br />SEE PLAN FOR---'°• ° . • • <br />FOUNDATION INFO <br />STEM FOUNDATION <br />GRADE <br />REINF. SEE PLAN <br />A/C CHASE 4" PVC (2) #5 RE BAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />'10 LOCATION OF <br />° \ SECOND H10A <br />° <br />SIMPSON H10A (WHEN <br />w/ (18) 10d x 1 1/2" ° REQUIRED) <br />NAI LS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE N,1 PENETRATION PVC OR SCH40 SLEEVE <br />G <br />I I-1 11=1 I I-1 1 1• l i=1 I I=1 I -i I I=1 <br />12" BELOW <br />GRADE <br />�I ,14111 I •Jr�II IT <br />I I <br />� I <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE VERTICAL THRU FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE PLUMBING LINE <br />PENETRATION i <br />CL- - - - - - — - - - - - - - - - - - - - - - <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />-----4. d <br />11=1 I <br />-III—II1-1 o—III—III- <br />=1 11= <br />° <br />SEE FND. PLN. <br />SIZE & REINF. <br />N <br />0 <br />N <br />N <br />y. _, F <br />N <br />'r 0 <br />0 �� '', '� <br />` <br />< <br />e cJ I ?"... Ft <br />z <br />w <br />s <br />O <br />". <br />LU <br />f <br />� <br />Z <br />/A AW' � <br />W L 1011 U <br />N <br />cMd <br />N 7 <br />0 V <br />4)D 0 U o <br />0 U- o Q <br />t U�� <br />.N U w Q <br />E^i <br />W L 0 D <br />0 <br />a <br />V, <br />LU <br />LLJ <br />(D <br />0 LLI uj W Q <br />W�Q � � <br />JOz�O OX <br />z� <br />JY)O2o�cn 0LL¢QQUQ0zLLUZ) — _ZU¢¢ <br />H- 1-- <br />d 0 b <br />OCO =OZO�OOmZcoWa.>5WWWZV5Q �U <br />-¢ <br />�aWOz"0LJz¢wY�W¢ <br />Qgo— <br />ozog o :D <br />0, <br />u- ¢ O I- ¢ u_ <br />O <br />O <br />N <br />Ow <br />~ <br />(n <br />� O <br />O <br />a(i)J� <br />� (� LE <br />LU Q <br />Q U Q 06 <br />Z 1— <br />w <br />LUJ� <br />d- <br />co <br />O <br />— <br />CO <br />'c- <br />CO <br />— <br />O <br />N <br />O <br />O <br />C- <br />CNI <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />n1 <br />CA <br />N <br />M <br />O— <br />O <br />O <br />— <br />ap <br />CD <br />CV <br />r- <br />CM <br />O <br />N <br />,;I-M <br />O <br />O <br />O <br />0.)O <br />O <br />O <br />N <br />O <br />O <br />' <br />>1 <br />r <br />I <br />O <br />Nl <br />O <br />c'7 <br />O <br />I d I <br />O <br />LO <br />O <br />I CD <br />O <br />I,- <br />N <br />Z Z <br />Il�f� <br />CO <br />0 W <br />� <br />W0F_ <br />CO <br />-0Q <br />Q <br />00 <br />OW <br />III <br />U") <br />z <br />z <br />�=Q <br />0 � <br />~ca0Z <br />Z J <br />� <br />z <br />1� <br />�ZZ <br />LL <br />0�>_ <br />00 <br />� <br />�ZZ <br />Z>_ r-I <br />= Q O <br />~ <br />■ <br />Z <br />U <br />Q <br />O"Ja <br />0 <br />z <br />Z <br />Z <br />J <br />LU� <br />CY) <br />NT <br />0 <br />o <br />N <br />LAST PLOT DATE <br />Feb. 26, 21 <br />STRUCTURAL <br />z <br />Q <br />J <br />DETAILS <br />