Laserfiche WebLink
(1) LAYER TYPE II (#30) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR <br />TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR <br />LESS. <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" <br />HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. <br />SHINGLE ROOF <br />SHINGLE ROOF <br />INSULATION15/32" <br />CDX PLYWOOD OR 7/16" <br />BAFFLE <br />BAFFLEE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />lx2 NAILER <br />w PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />• <br />w <br />16" O.C. 2X S.P.F. STUDS <br />o i <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />0 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />H­ <br />Z) Lwu LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL <br />= INSULATION PER <br />112" GYP. WB OR 318" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />g R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALS <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />METALSEAT <br />ER PLAN <br />O <br />OR FELT <br />ILE <br />PAPER FOR <br />MOISTURE <br />a,d <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" — <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' 0/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" O.C. <br />• BASEBOARD <br />MIN. 2500 PSI CONC. SLAB <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />.. 4 <br />M ' I —III _—III—III—I ° <br />I —I 1—I I I <br />6x6 w1.4xw1.4 1 I —III —I I I —I I I —I I d a <br />=I 1=III—I 11 I I <br />WWF OR FIBERMESH -III-III-III—I I ° <br />a. <br />STD. 90 HOOK (SEE DETAIL) <br />8"x3"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />30LID W/GROUT <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />- <br />FOUNDATION PLAN & NOTES) <br />M <br />v 4"x4" INSPECTION PORT AT <br />N EACH FILL CELL TYPICAL <br />w <br />a <br />0- AT GARAGE CONTRACTOR <br />N <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />/--411to 6" BELOW GRADE <br />=1NISH GRADE 00 <br />-III- STD.90*HOOK <br />III„III <br />(3) # 5 REBAR ON 3" CHAIR (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2—STORY WALL SECTION <br />SCALE: 3/4"= V-0" <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" NAILS TO <br />2nd FLO <br />BEAM/GI <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL <br />BAND JOIST V\ <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8) 1Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />ATE W/ <br />O.C. <br />Z•� �� � il�P�l�j•� l�l <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAN D <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />4 @ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS4 <br />aO <br />SEE FRAMING WEEP SCREED <br />r- <br />o z <br />PLAN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 1Odx1 1/2" <br />O/C FOR THE 1 ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)1Odx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1'-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1"" ^ ^ <br />2"x BOT. PLATE <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSS <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />15/32" OSB —� <br />EXPOSUREI <br />SHEATHING <br />PROVIDE s <br />2X4 RIBBONS, EACH W/4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />BLOCKING AS <br />L <br />REQUIRED PER <br />WEEP SCREED <br />_ <br />o SECTION X-X IF <br />NOT FULL <br />INSTALLED PER. MANUF. <br />o <br />-wi <br />4 HEIGHT SHEET - <br />SIMPSON HETA20 w/ (8)10dx1 1/2" <br />o <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-O" <br />FOR ADDITIONAL INFORMATION. <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=1'-0" "6') <br />NOTE: SEE TYPICAL WALL <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION <br />(1) ROW OF 2x BLOCKING @ MID <br />HGT. FOR WALL HGT. 5 8'-611. (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />PTS FOR WALL HGT. > 8'-6" <br />SIMPSON SP1 w/ (10) 1Od <br />NAILS AT EA. STUD <br />2 x STUDS @ 16" O.C. <br />2X P.T. PLATE <br />SEE SHEATHING <br />SPECS ON FLOOR <br />1/2" GYP. W.B. MIN. @ <br />GARAGE SIDE IF APPLICABLE <br />5/8"DIA, x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ <br />2"DIA.X 3/16" PLATE WASHER <br />(MIN. SHEAR 3500#. MIN. <br />TYPICAL TENSION 2600#.) <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />a �a'. <br />� <br />' °<U4> ° ° <br />•d ° d .. a ' I III —III `° <br />1.. f.:a'� ��° I I111IIIIIIII= <br />(3) #5 CONT. ON 3" <br />8" l 1'-8" 1 I CHAIR W/ 3" MIN. <br />g <br />1 l CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=1'-O" S6 <br />ADDITIONAL SLAB INFORMATION. <br />G FLOOR SYST M <br />2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEENFLOOR WALL SHEATHING <br />SYSTEM lAlAI I rl r%iArinKl MIA/nMAAA <br />(2)- 2x TOP PLATE <br />BEYOND I <br />5/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING w <br />SOLID 2x O <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING � <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />G- v <br />C <br />x <br />w <br />oll <br />x <br />E <br />Li <br />2x STUDS w <br />BEYOND. <br />SEE PLAN <br />O <br />U) <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />S 3/4" S 1/2" <br />1/2" <br />S 1/z" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUMy" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />III <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN %". <br />O NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />O <br />C NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />LL E <br />C NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />O w <br />O NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />U) <br />C STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />J o <br />w/ 8d COMMON NAIL <br />o � O <br />n PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />} ¢ r O F <br />¢ itP00w <br />lJ w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />z w � u- � <br />O (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N w C, O <br />MEMBER IF GABLE END <br />LL <br />NOTE: <br />8d NAILS FOR WALL SHEATHING MUST BE MIN ,131"X 2 1/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />WALL SHEATHING INSTALL. <br />C . <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />NO <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />-• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 10d x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />BEAM <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. r <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />E '4 a° <br />CV °4. <br />_ 4 <br />III ICI��I <br />1II��III-Iadaaaa <br />I I' Ll I I I I I1 I I=� <br />(3) # 5 REBAR ON 3" CHAIR 4" 1'-8" <br />W/T MIN. CLEARANCE <br />ALTERNATE FOOTING <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />EA END <br />EA END <br />EA END <br />EA END <br />SIMPSON <br />1'4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />- PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />-2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />- APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 1Od NAILS <br />- AT EA. STUD <br />- 2X P.T. PLATE <br />- WEEP SCREED INSTALLED PER. MANUF. <br />FINISH GRADE 00 <br />z °° <br />1— <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-0" <br />ADDITIONAL INFORMATION. <br />u <br />CV <br />O <br />N <br />O <br />M <br />M <br />f 1 <br />Lo <br />Lo <br />�k <br />w') <br />0 P<e <br />Z <br />3 `2 <br />�bd - <br />w <br />s� <br />0 <br />w <br />Z <br />a <br />Cn N Lr) ; E <br />'oM o <br />_W L L <br />} co <br />N U Q rn <br />Y/ �- L c') <br />� 0 U o <br />o <br />LL O <br />•� O o N Q <br />• N V w cl <br />7N� o E co <br />W W <br />V' <br />W <br />w w u) LU W p ►- <br />W0¢ aka ¢gYzoC z <br />of �0 <br />Q Q U <br />Qom-JW03CCU)u-() <br /><ox Z0 LL02�00I—Q~ <br />Z U <br />0 <br />0cnw�0Z0xooco <br />cnwaWcnwwWv5w�¢ � <br />z LL <br />¢�w0w LUZogO0¢ <br />lu <br />¢ a <br />°Oa o 0 oQ <br />O <br />O <br />N <br />0W <br />� V) � <br />> (!) CD O <br />z <br />0 `M O <br />a <br />J <br />Ln LL. <br />Q <br />Q Luce <br />0- ,--I <br />Q�Q00 <br />Z I— <br />� <br />W <br />Lu <br />-j C) <br />l0 <br />/1/1 <br />■ � <br />3 <br />Cfl <br />c— <br />00 <br />r- <br />00 <br />r- <br />O <br />04 <br />O <br />C)l <br />O <br />, <br />CD <br />N <br />C)i <br />N'N <br />0 <br />C)O <br />N <br />N <br />O <br />CV <br />N <br />d) <br />N <br />O <br />O <br />O <br />r <br />O <br />OO <br />N <br />T <br />A <br />C)� <br />N <br />1 <br />1 <br />� <br />- <br />O <br />- <br />CA <br />0 <br />0 <br />C) <br />C) <br />0 <br />0 <br />0 <br />0 <br />CD <br />1 <br />L <br />a <br />0 <br />N <br />0 <br />Cl) <br />0 <br />d <br />0 <br />L0 <br />0 <br />CO <br />0 <br />I` <br />1 <br />1 <br />Z Z <br />ZO <br />0 W <br />wUH> <br />(n <br />Q <br />Uo�Li <br />Lo•— <br />—17 <br />Z <br />Oa=Q <br />Z <br />w I I <br />�� <br />~m0Z <br />O <br />Z _I <br />1� <br />CL <br />Z � <br />z Z <br />LLJ0�0 <br />OUa>-w <br />` <br />Q <br />z <br />z <br />=QO <br />~ <br />z <br />Q <br />J <br />a <br />O� <br />O <br />W <br />� <br />a <br />Z <br />Z <br />z <br />J <br />Lu <br />00 <br />O <br />N <br />NLAST <br />PLOT DATE <br />Mar. 30, 21 <br />STRUCTURAL <br />z <br />■ ■ <br />p <br />J <br />DETAILS -MONO <br />