Laserfiche WebLink
1x4 1l2" DRYWALL DOOR JAMB (REFER 1x4 1/2" DRYWALL DOOR JAMB (REFER 1x4 1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER TO PRODUCT <br />TO PRODUCT P.T. TO PRODUCT <br />MAX. 8" DO NOT DO THIS <br />PROPER INSTALLATION <br />2N BOT. PLATE W/ (2)10d @ 6" O.C.. <br />APPROVAL FOR CONN. APPROVAL FOR CONN. APPROVAL FOR CONN. <br />1 x4 <br />` #5 REBAR (TYP,) ' <br />ATTACHED WALL SHEATHING TO <br />2X BOTTOM PLATE W/ 8d 4" <br />1x4 P.T. FURRING <br />3/16" 0 X 3" LONG FURRING ROWS 3/16" x <br />3-1/4" LONG X 3/16" 0 FURRING <br />(TYP jBAR ` <br />AND NAIL/ D W/ d COMMON@ <br />6" O.C. EDGES AND 12" O.C. FIELD <br />@ <br />O.C., 2 ROWS STAGGERED <br />TAPCONS T O.C.& <br />TAPCON. INTO TAPCON @ 16 .C. & 4 2X8 <br />STAGGERED IN 16 <br />` �' <br />1x8 P.T. FROM EACH END w/ MIN. 1X8 <br />BLOCK@ SPACING ,+ O.C. 2-ROWS INTO 2" EDGE DIST. ATTACH <br />1 DETAIL <br />2x BAND JOIST W/ FACE NAIL 10d <br />JOIST <br />PER MANUFACTURE MASONRY THROUGH �� <br />1-1 /2 DETAIL 1 x8 w/ (2) ROWS 8d� NALS 3" DETAIL <br />St'D. 90° HOOK (TYP.) <br />STD. <br />FILL <br />@TOP & TTM CHORD, AND (1 <br />1 x4 P.T. & 1 x8 P.T. STAGGERED @ 12 O.C. <br />SOLID <br />(T <br />BOTH CELLS HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />3/16" x 3 -1/2" DOOR JAMB (REFER <br />TAPCON @ 16° 1x4 P.T. TO PRODUCTLil <br />METAL SEAT PLATE <br />O.C. & 4" FROM DOOR JAMB (REFER APPROVAL FOR CONN. 1x4 1/2" DRYWALL <br />LAP SHEATHING TO <br />DOOR JAMB (REFER EACH END W/ MIN TO PRODUCT <br />2" EDGE DIST. APPROVAL FOR CONN. 2x8 P.T. wl (2) ROWS 3/16" <br />' ` <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />TO PRODUCT <br />x 3-1/2" TAPCON @ 16" 1x4 <br />APPROVAL FOR CONN. (2) ROWS 3/16" x 3-1/2" O.C. & 4 FROM EACH FURRING <br />TAPCON @ 16" O.C. & END w/ MIN. 2" EDGE DIST, <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />' t2�� NOTC Fes@ @FIRST COURSE <br />` <br />- <br />SIMPSON HGAM1OKTA @ 12" O.C. <br />w/ (4)1/4x1 1/2" SDS SCREWS <br />2x P.T. AS REQ'D MIN. 2" EDGE DIST. (2) ROWS 10dx3" 2x8 <br />' ` <br />INTO BAND JOIST & (4)1/4"x2 3/4" <br />TITEN INTO K.O. BLOCK <br />2x DETAIL 21 /4" DETAIL STAGGERED @ 12" O.C. 3_ 1 /4�� DETAIL <br />NOTCH WEB AT THE <br />±5A FIRST 2 COURSES <br />LFILLED <br />BUILDOUT OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />sCALE.N.T.s. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />UPLIFT CAPACITY <br />W/ 1/4" x 31/4" TAPCON (1 1/4"MIN. A -A <br />_ 16100 #FOR 2 STRAPS <br />FILL 1st4 COURSES <br />SOLID w�GRouT <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />2'-0" 8" <br />1 PLY PRE-ENGINEERED TRUSS <br />t <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. 1/4" x 31/4" TAPCONS <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4)1/4"x1 1/2" SDS <br />• ' <br />1/2" DRYWALL * <br />SCREWS & (5)1/4" x 21/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 #) <br />2 x 8 45A DIAGONAL (4)10d NAILS INTO LEAVE A CUT OUT IN O.S.B. ON THE <br />BRACE(S) 2 x 8 BRACE/ BLKG. INSIDE TO ALLOW FOR INSULATION <br />r. <br />7l16" OSB TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA 2 x 8 45 DIAGONAL BRACE AT EA, <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />. <br />SCRIBE (NOTCH) OF W/ (3)10d NAILS <br />• • • • • <br />OVERHANG <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 AT A EAFACE <br />. <br />RETROFIT TRUSS DETAIL <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />N.T.S. <br />x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSBINSTALL WDW. SCREW ANCHOjm\\-2PROVIDE TAPCON WITHIN <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 <br />RETROFIT WALL OVERHANG DETAIL NTS) <br />INTO ARCH BLKG. PER 4" MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />FOR OVERHANGS BETWEEN 3/4" TO 1 112" <br />1-112" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />IF TRUSSES USED W/ 3 #6 X 4Y," WOOD <br />) () <br />" DOUBLE 2x4 SCAB FOR Z-6" TO 4'-0" O.H. <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />(2)10d NAILS @ 8" O.C. <br />ARCH DETAIL J 4' MAX. RAD. <br />TITEN w/ � <br />x0 <br />Vtciq/yq� TO TRUSS TOP CHORD <br />16" O.C.(CENTERED) <br />MIN. 4" EMBEDMENT ATD <br />BEN <br />r n r n <br />1-05 -O <br />SCALE: N.T.S. SS <br />12 <br />+ + GT <br />h PLYWOOD SHEATHING <br />JACK TRUSS PROVIDED BY SEE , <br />+ + <br />TRUSS COMPANY OR PLAN <br />+ + <br />2x6 #2 SYP @ 24" O.C. <br />+ + <br />INISH FLO <br />2 x 8 BUCK -CONNECT TO BLOCK SECTION <br />+ + BLOCKING AS <br />r ° <br />WITH 1/4" x 31/4" TAPCON (1 1/4"MIN. B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED— <br />„ EMBEDMENT INTO ) <br />/4 MAX <br />PER NAILING SCHEDULE ALL <br />TO SUPPORT <br />TRUSS <br />° • ° !.• #5 BAR <br />2'-0" 8" <br />BLOCK HEADER SOLID BLKG. AT TOP BTWN. ARCH <br />(5)12d NAILS SIMPSON i <br />+ SOFFIT <br />+ <br />► "� ► D CENTERED <br />D' 10 • ` • : 2 <br />1 X 4 FURRING BLKG. & BUCK <br />2X6 TO 2X4 H NAILS <br />2X4 SYP EACH TRUSS • , <br />►'' ° IN TOP 4 <br />► d ' KNOCKOUT / N <br />� <br />- • '; ° CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK 2 x 8 VERT. W/ O 2 10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ <br />s. <br />CONNECTOR • <br />= <br />— a <br />MONO FOOTING ' <br />PROVIDE 2 x 8 DIAG. BRACE B <br />(3) , <br />SIZE AND REINF. PER PLAN — <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />SEE LINTEL <br />AND SECTION DETAILS <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY�/ <br />SCHED. <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL ° • ° <br />2 x 8 VERT. BRACES INSIDE TO ALLOW FOR INSULATION <br />O <br />ARCH <br />#2 SYP @ 24" O.C. � <br />ENTER SO IT <br />.► <br />DIRT • � z <br />TO BE INSTALLED <br />2 <br />4'-0" MAX SEE PLAN <br />PRECAST LINTEL <br />NDARD 4 <br />:*�F:rl <br />BUILT UP PLWD. BUCK - <br />SCRIBE (NOTCH) BACKSIDE 7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />.•: <br />#5 BAR IN • HOOKN <br />TO FIT ARCH CONNECT W/ <br />NOTE: IF TRUSSES USED) W/ (2) #6 X 4Yz" WOOD <br />FOR OVER HANG <br />FILLED CELL OL �� <br />8d NAILS 2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />SHED ROOF ENDS TO BE SCREWS 16" O.C. MAX. OR IF MASONRY <br />@ <br />(MAX. 4'-0") <br />• • • <br />• : • • •. � � •, • : •, <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL <br />4' MAX. RAD. <br />GABLE ONLY, CORNERS WALL USE (2)1/4" X 31/2" TAPCONS AT 16" <br />, <br />INSTALL WDW, SCREW THRU OSB INTO 2 x 8 <br />SHALL NOT BE FRAMED AS O.C. <br />✓ �• ` �'• • f ,• f ' � ,• <br />ANCHOR INTO ARCH BLKG. <br />HIP. <br />STEMWALL FOOTING SIZE AND <br />PER INSTALLATION DETAILS 13-13 ARCH DETAIL rK <br />DESIGNED ONLY FOR THE SECTION @ENTRY L <br />SECTION ROOF EXTENSIONrM <br />REINF. PERLAN AND STEMWALL <br />SCALE: N.T.S. SS <br />INSTALLATION OF SHINGLE SCALE: 3/4" = V-0" SS <br />SCALE: 3/4" = V-0" <br />SS <br />MONO TO STEMWALL FOOTING SECTION DETAILS <br />AND METAL ROOF FINISH <br />SCALE: 3/4" = V-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />DRILL 3/4"x5"MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT 20 ga. PANEL <br />MORE INFO <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS ANCHOR <br />SIMPSON HTT4 w/ (18)10d x 1 <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />"SQUEEZED" <br />W.W.M. AT PERIMETER <br />1/2" NAILS TO STUDS & (1) - <br />COURSES TO PREVENT THE MORTAR FROM BEING OUT. 1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />(1) #5 BARS CONT. <br />5!8" DIA. ALL THREAD ROD <br />a #5x6' EMBEDDED INTO EXISTING BOND BEAM <br />E a. INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 PANEL PER ANCHOR) <br />g <br />OCCURS <br />TOP WITH MIN. 3" <br />EPDXIED w/ SIMPSON "SET" <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />COVER 6'-0" <br />EPDXY MIN. 6"EMBEDMENT & <br />0 <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL (EVERY OTHER <br />E� <br />3 MIN. EDGE DISTANCE <br />� FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />v NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />°. <br />o <br />A <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />v n <br />REINFORCING AS FOLLOWS: <br />SEALANT <br />a <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. ':„:% ''°:: " <br />p° ° <br />#5x6' EMBEDDED INTO <br />PRESS PANEL REINFORCING INTO PLACE. <br />' 6" MIN. LAP SPLICE W/ <br />t, ► <br />L) z <br />`g EXISTING FOOTING (2) #5x6' IN CONC. <br />' COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />, ° <br />`I <br />N <br />I DRILL 3/4"x5" MIN. HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING- DO NOT <br />GRADE >. ► <br />`. <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6" MIN. LAP <br />p <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE NOTE: <br />`� ° ► <br />Cl) <br />\ <br />REMAIN FREE OF MORTAR. <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS SEE GLASS BLOCK INSTALLATION NOTES. <br />> <br />` <br />�"0 <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />, ° <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16"MIN. COVER EA. WAY <br />SECTION <br />A <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 3/4" =1'-0° <br />SCALE: 3/4" =1'-0" <br />FOR WIND SPEEDS UP TO 110 MPH', PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />C� <br />•,fV <br />`C"v <br />W <br />_ �a0 <br />0� <br />_) <br />F <br />�0 w <br />fir/ O <br />F E S S <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />LO <br />rooE" <br />"J <br />Lo 0 <br />g 04 <br />N <br />;v�I <br />N <br />J , <br />i! V• W <br />a <br />W <br />J' <br />cNna <br />LL U.a <br />-rW°' 0- <br />LL - <br />LLJ <br />11 <br />13 <br />o <br />_ <br />g <br />2M-3 <br />°o <br />W <br />�pjO' <br />Go <br />e a <br />Z <br />uUL <br />N F, Z <br />o U <br />a <br />d N O <br />U N <br />Z <br />W <br />71 <br />0 <br />Z N <br />Z �pp <br />Q <br />J <br />a <br />E3 <br />Ln <br />z <br />o <br />'�• <br />V <br />O) V) <br />r- 1 10 <br />M <br />M <br />w <br />J <br />E <br />� o <br />o <br />o <br />U <br />� <br />W <br />Z <br />1--- <br />NisEO <br />R <br />o <br />�o <br />6 <br />�o <br />FF <br />Z LL <br />z <br />tti <br />W <br />a LLk <br />tp <br />C' <br />ild <br />a <br />u 3 <br />�0 <br />> d. <br />J <br />O <br />M <br />L <br />� <br />0 <br />U <br />CF) <br />^ <br />Q <br />• � <br />U <br />ry <br />' <br />O <br />1^ <br />O <br />C m <br />o <br />ccN <br />0 <br />Ln <br />.� <br />2 <br />to <br />r <br />T <br />T <br />0) <br />000 <br />rn <br />a� <br />E <br />z <br />c <br />E <br />:9a <br />0 <br />Q <br />JOB <br />NO: <br />21-1070 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />SS <br />