Laserfiche WebLink
0 <br />RR�i1OARpE6CTlIRALDMWIICSANDIORTAUSS <br />STRUCTlI1AlSHEATHINGSEEPLAN <br />IIIINIIFACIUABi T1tRAYYINGS FOR SP�FC TAiSS PRONE <br />AND DETAILS FOR ATTACHMEIVF <br />INIMIATUL A HEEL HEIGHTS, SLOPE, OV9IWIGS) <br />PREP WOOD <br />N <br />TRIMAT24'OD.MAX <br />-OR- <br />2K BLOCKING AT SFEATWNG EDGES wI <br />2x RBBON MW ATTACHED TO <br />A Ild NALS INTO TRUSS <br />TRUES w1(3)10d NAILS, WO.C. <br />fAN11Al0US SiAIICTURAI SFO:ATHNG <br />CENTER MAX SPACING <br />NAIL PER TYPICAL SHEATHING DETAIL <br />STRUCTURAL SHEATHING NAIL <br />PER TYPICAL. SHEATHING DETAIL <br />FRAMING PEfi PLAN <br />FRAMING PER PLAN <br />DETAILATTRUSS HEEL> 91/4' <br />SEE PLAN AND DETALS FOR <br />ATTACHMENT <br />P WOODTRUSSESAT <br />ZrO.C. MAX <br />TRUSS ANCHOR PER PLAN <br />FRAMING PER PLAN <br />FASCIA, (SEE ARCH DWGS) <br />CONTINUOUS STRUCTURAL SHEATHING <br />NAIL PER TYPICAL SHEATHNG DETAIL <br />DETALATTYPICN.Tf�SS wIHEB. < 91H' <br />TRUSSATTACIBEIIT: <br />ALLM= ENDS ARE TO BE SEC M M TIEWALL EBDW USING OIE OFTIE BELOW METHODS. OIE RILL OP ICII MUST BE USED FOR CONIiNIOUS <br />LOAD PATH: <br />L NSfALLTYPICALTRUS ANCHORTHRONEXTERIOR&IIATHK EXT.SHEATtK SCION INUOUSAIDWLLTR OERC0MBINED NMI <br />UPLFT. <br />b. NSTAIITYWALTMOONiECTORFROM TRIZTIDTOPPLATE ONNSDEOFTHEWALL021A@EVERYORBSUMTOPPLATE EXT. <br />SIFATM60014TN000SANDWUTRAH,SFERCOBB SIM&UPLFf. <br />c. NSTALLANCIIORASCALIIDFORONTHEPIANS. TWErSTRAPSAREMBENS MOONTfENSNEOFTHEWAIL MIYSTRAPSFROM THE STIAS <br />TO THE lNO YING SIRUGT VIRL BE NLED FOR ON THE PLANS <br />d INSTALLTYPICAL TRUSS $WE FROM TRUSS M TOP PLATE EXT 98THING IS COMMAND WLL TRANSFER COWNED NA I UPLIFT. <br />ROOF TRUSS ON FRAMING <br />1 1V 1 scmw <br />1 /2"=1'-0" <br />s xvt: scmw <br />RWM-010 1 /2"= l'-0" <br />2x4 BLOCKING AT DIAGONALS ONLY. ATTACH AT EACH <br />END w/ (2) 12d TOENAILS. NAIL SHEATHING TO BLOCKING <br />STRUCTURAL SHEATHING PER PLAN <br />AT 6' O.C. w/ MINIMUM 8d NAILS. BLOCK 4 BAYS BACK <br />2x4 LADDER FRAMING AT 24' O.C. REQ'D AT <br />FROM GABLE TRUSS. <br />OVERHANGS GREATER THAN 128. ATTACH TO TRUSS <br />WHEN SECOND BRACE IS REQUIRED, NAIL TO OPPOSITE <br />TOP CHORD w/ (2)-16d NAILS AT 2e O.C. <br />SIDE OF BLOCKING. <br />CONT. 2x4 w/ (2) 12d NAILS <br />x=10%HHOUSEWDTH� <br />1. AT VERTICALS S-6" TO 6'-6' USE ONE 20 'L' BACK. <br />2. AT VERIICALS OVER 6'-6" TO 8'-4' USE (2) 2x4 "L" <br />2x6 DIAGONAL BRACING w/ (5) 10d COMMON NAILS TO <br />- <br />BACKS (1 EA. SIDE) (OR FRAME PER CASE 3 BELOW). 3 <br />BLOCKING. UNLESS NOTED OTHERWISE ON PLANS, PROVIDE <br />ONE BRACE NEAR THE PEAK AND THE REMAINDER AT 48 <br />O O <br />3. AT VERTICALS OVER 8'-4' TO 1-0' USE ONE 2x4 <br />O.C. ®APPROX. 45-DEG ANGLE <br />"L" BACK AND AN ADDITIONAL DIAGONAL BRACE IS <br />SPUCE DETAIL FOR DIAGONAL 4' LAP WITH 'T' LAP <br />REQUIRED AT THE PEAK AND AT EVERY OTHER VERTICAL <br />NAILED w/ (2) ROWS 10d GUN NAILS 0 8" O.C. <br />" <br />-I <br />MEMBER IN THIS RANGE. ATTACH THE DIAGONAL AT MID <br />RIDGE X <br />HEIGHT AND TO THE BLOCKING BELOW THE ROOF <br />(2) SIMPSON A23 w/ (8) 10d x 1-1/2' <br />O <br />SHEATHING w/ (5) 12ds AT EACH END. IN ADDITION TO <br />(ONE ON EACH SIDE OF BRACE TO TOP PLATE). <br />MU END <br />THE SECOND DIAGONAL, A STRONGBACK IS ALSO <br />- - <br />REQUIRED AT THESE VERTICALS AND MUST BE ATTACHED <br />" <br />TO EACH 'L' BACK WITH (2) 12d's AND ONE SIMPSON H5 <br />CONNECTOR. <br />BOSTON HIP <br />SIDE NAIL ALL ' BACKS AND SIRONGBACKS w/ 12d's SHEATHING PER PLAN <br />1L <br />AT 6' O.C. NOTCH 'L' BACKS AT TOP AND BOTTOM. PROVIDE CONT. 2x8 P.T. PLATE w/ 1/2' 0 x 10' <br />STRUCTURAL SHEATHING (�MI I ANCHOR BOLTS AT 4'-0' O.C. MAX. w/2'z2" PL <br />SEE PLAN FOR ATTACHMENT �+ �+ WASHERS AND 7" EMBEDMENT. <br />NAIL BOTTOM CHORD OF GABLE MASONRY WALL, BOND BEAM, LINTEL BEAM OR RAKED <br />TRUSS w 12d's AT 4' BEAM PER PLAN. FOR RAKED BEAM AT VAULTED <br />/ O.C. CONDITION, SEE PLAN AND DETAIL <br />/ CONE. 2x4 <br />20 NAILED FLAT TO TOP OF BRACE ('T° 2x6 NAILED <br />CONTINUOUS / \ BRACE) NAILED TO DIAG. w/ 10d GUN B TOP <br />STRUCTURAL NAILS 0 8' O.C. BUTT JOINT ALLOWED <br />SHEATHING SEE PLAN (48" MIN MEMBER LENGTH), BRACED <br />FOR ATTACHMENT ksREQUIRED TO BE CONTINUOUS OVER DIAG. <br />FIELD NAILING / BRACE SPLICE SHOWN <br />PER PLAN <br />2x4 BLOCKING AT 48' 0 C - <br />\ 3 TRUSS BAYS <br />\ 2x6 NAILED 0 BOTTOM <br />WOOD FRAMING <br />PER PLAN GABLE END DIAGONAL BRACE TYPICAL SPLICE <br />R09)GABLE END TRUSS BRACING DETAIL <br />GABLE END <br />SHEATHING SEE PLAN <br />FOR ATTACHMENT <br />PRE ENGINEERED <br />TRUSSES AT 24" O.C. <br />20 BLOCKING AT 2'-0' - <br />O.C. w/ (2) 12d TOE NAILS <br />EACH END TO TRUSS <br />BOND BEAM PER - <br />RM AND SCHEDULE <br />8' CMIJ WALL SEE PLAN <br />FOR VERT. RENF. <br />WALL BRACING �ATNON-BEARING EXTERIOR WALL <br />RO7 ,"TS <br />SHEATHING PER PLAN <br />META16 AT BLOCKING w/1/4' <br />MAX. GAP FROM TOP OF <br />WALL TO BOTT. OF BLOCKING <br />RWW-020 <br />20 OUTLOOKER <br />PER DRAWINGS <br />2x6 FASCIA <br />1 x6 w/(3) 8d 0 <br />EA. OUTLOOKER <br />20 OUTLOOKER <br />PER DRAWINGS <br />20 FASCIA <br />SHEATHING PER PLAN. <br />GABLE TRUSS - OR - <br />PER PLAN <br />20 BETWEEN EA. <br />OUTLOOKER w/(2) <br />10d TOENAILS <br />SHEATHING PER PLAN. <br />GABLE TRUSS <br />PER PLAN <br />EDIMENT BLOCKING @ GABLE <br />-VALLEY SET TRUSSES <br />AT 24' O.C. <br />-ROOF SHEATHING <br />VALLEY SET TRUSSES <br />PER PLAN <br />AT 24O.C. <br />-MIN. 9' LONG 20 GA. <br />ROOF SHEATHING <br />FLAT STRAP w/ (8) 10d <br />PER PLAN <br />-SHEATHING PER <br />SHEATHING PER <br />PLAN OR- <br />PLAN. -OR- <br />2x4 BLOCKING UNDER TRUSS <br />I <br />(1) SDWC15600 TRUSS SCREW <br />ENDS. NAIL TO TRUSS CHORDS <br />TO EVERY TRUSS BELOW <br />w/ (3) 10d EACH END. <br />Qna1ALLEY SET OVER FRAME <br />I I V V 1M <br />x=1o%IHOUSEWDTH <br />X <br />X - <br />RIM <br />O GAN.E END <br />GABLE <br />x=1o%HousEwrnH <br />ROOF SHEATHNG <br />NAILS <br />ROOF FASTDW ZO ES <br />0.113'x W <br />1 <br />2 <br />3 <br />SHINGLE <br />71U1'SPAN RATED SHEATHING3d <br />OFFSET DIMENSION T =10% HOUSE WIDTH <br />PANEL FDM@SUPPORTS (1) <br />x <br />x <br />4'OC. <br />TIE 1W$PANRATED SHHFATHNG <br />METAL 15jrSPANRATED SHEATHING <br />PAN9.FELD (1) <br />roz. <br />8'OC. <br />8'O.C. <br />NOTES: <br />1. LONG SIDE OFSHEATHING TO BE PEAPENDICUTARTOTRUSSESOR RAFTEWTYPIGIL <br />LEDGESPACINGALSOAPPLESOT3TGABLEE DWALLSORTRUSSES. <br />3 FAStEE<'NG DOLES 2 AND 3 ATE EQUAL TO 10%OF TOTAL HOUSE WIM DNE NSDN T OFFSET FROM ROOF EDGE. <br />30'WDEHOUSE = e'ZONE,49WDE HOUSE = 4'ZOHE, 50'WDE HOUSE = YZ00E, WWDE HOUSE = B'ZONE <br />rM 7*4 <br />ROOF SHEATHING ATTACHMENT DIAGRAM <br />20 LADDER FRAYING AT 2e O.C. REQ'D AT <br />OVERHANGS (BEATER THAN 12'. ATTACH TO TRUSS <br />TOP CHORD w/ (2)-16d NAILS AT 2e O.C. <br />CONT. 2x6 w/ (2) 12d NAILS <br />STRUCTURAL SHEATHING PER PLAN <br />2x BLUING BETWEEN EA. <br />TRUSS MEMBER OR TRUSS WEB. <br />2x LEDC>ER w/2-10d 0 EA. <br />(BOSSING TRUSS MEMBER <br />FOR ROOF SIGTHNG <br />NAIIUNG <br />(8) 10d NAILS EACH <br />2x4 BLOCKING AT DIAGONALS ONLY. ATTACH AT <br />EACH END w/ (2) 12d TOENAILS. NAIL SHEATHING <br />TO BLOCKING AT 6' O.C. w/ MNNLW 8d NAILS. <br />BLOCK 8'-O' BACK FROM GABLE TRUSS. <br />2x4 DIAGONAL BRACING w/ (5) 12d COMMON <br />NAILS EA E4ND 0 32' MAX SPACING <br />F LENGTH IS LESS THAN 4'-0" USE 2x41' BACK, <br />fF LENGTH IS (BEATER 1HEIN 4'-0' USE (2) 2x4 'L' <br />BACKS. NAIL 'L' BACKS w/12d 012'O.C.(NOTC�D <br />0 TOP w/2-12d TOENAILS <br />'L' BAq(-EXTEND 6' PAST <br />STRUCTURAL SHEATHING PER PLAN <br />2x4 OUTLOOKER FRAMING AT 24' O.C. OVER <br />DROPPED GABLE END TRUSS. ATTACH TO <br />TRUSS TOP CHORD w/ (2)-16d NAILS. - <br />CONT. 2x4 w/ (2) 12d NAILS -� <br />SIMPSON H10A w/(16)8d NAILS MIN. - <br />STRUCTURAL SHEATHING <br />PRE-ENGINEERED WOOD <br />TRUSSES AT 2'-0" O.C. MAX. <br />TRUSS ANCHOR <br />SEE CONN. CHART <br />BOND BEAM PER PLA <br />VFASCIA <br />SEE ARCH. <br />DRAWINGS <br />CMU <br />PRE-ENGINEERED ROOF <br />TRUSSES R MAX. 24' O.C. <br />CONNECTOR <br />FASTENERS <br />ALLOWABLE LOADS <br />1�TY <br />TYPE <br />GRAVITY <br />Ibs @ LO <br />UPLIFT (Ibs) @ <br />1.6 <br />LATERAL <br />Ibs L <br />META16 <br />8 <br />0.148"xl-1/2" <br />-- <br />1450 <br />F1: 34Cf <br />F2:770 <br />HETA16 <br />9 <br />0.148"xl1/2" <br />- <br />1810 <br />Fl:34ti <br />Fl- 770 <br />(2) META16 <br />10 <br />0.148"xl-1/2" <br />-- <br />1875 <br />Fl: 680 <br />F2:770 <br />(Z) META16 <br />" " <br />Fl. 1285 <br />- 1x4 FURRING AT <br />SHEATHING PER ARCH J MAX. 16' O.C. w/ <br />INSTALLED PER MANUF. (3)10d AT EA TRUSS <br />soy EXTERIOR COUNG FURRING <br />- or 3-Mv <br />14 <br />0.162 x3-1/2 <br />-- <br />1795 <br />F2: 1080 <br />(Z) HETA16 <br />I - Div <br />10 <br />0.1;48"xl 1/2" <br />-- <br />1920 <br />Fl: 680 <br />F2:770 <br />(2) HETA16 <br />dR - <br />12 <br />0.162"x3-1/2" <br />-- <br />2365 <br />Fl: 1350 <br />F2: 1430 <br />SCALE: N.T.S. <br />FLSTMI6 <br />8 <br />0.148"xl-1/2" <br />_- <br />1110 <br />F1:120 <br />" " <br />VALLEY SET TRUSSES <br />AT 24' O.C. <br />ROOF SHEATHING <br />PER PLAN <br />A30 8" <br />4 <br />4 x13 4 Titen 2 <br />F2: 90 <br />IVfTS12 <br />14 <br />0,148"xl 2" <br />-- <br />990 <br />-- <br />MTTS16 <br />14 <br />0.148"xl-1/2" <br />-- <br />990 <br />HTS16 <br />16 <br />0.148"x1- 2" <br />-- <br />1310 <br />-- <br />HTS20 <br />24 <br />0.148"x1- 2" <br />-- <br />1310 <br />L.STA12 <br />10 <br />0.148"x2-1/2" <br />-- <br />925 <br />-- <br />LSTA18 <br />14 <br />0.148"x2 2" <br />-- <br />1235 <br />-- <br />" <br />SHEATHING PER 1114x2- 2 -- 1640 -- <br />PLAN. WTA30 22 0.148"x2-1/2" -- 2050 - <br />- <br />----------------- T -- -, MtSTC52 62 0.148"x3- 4" -- 4735 -- <br />2x4 PURUN B EA VALLEY <br />TRUSS. NAIL TO COMMON <br />TRUSS w/(3) 16d GUN NAILS <br />BOTTOM CORD OF VALLEY <br />TRUSS NAILED TO PURUN <br />w/ 10d GUN NAIL 0 8' O.C. <br />MSTCM40 <br />10 <br />1,/rx2-1/e Titen 2 <br />-- <br />2800 <br />-- <br />14 <br />0.148"x3-1/4" <br />T <br />22 <br />0.148"x3" <br />3965 <br />F1: 775 <br />1 <br />5/8" ATR <br />F2: 525 <br />VGTR or L <br />1 <br />5/8" ATR <br />-- <br />2225 <br />Fl: 650 <br />16 <br />4"x3"SDS <br />F2: 630 <br />V GTR/L <br />2 <br />5/8" ATR <br />- <br />5545 <br />Fl: 650 <br />32 <br />1/4"x3" SDS <br />F2: 630 <br />1 <br />5 8" ATR <br />Fl 1185 <br />2x4 BLOCKING AT DIAGONALS ONLY. ATTACH AT EACH <br />END w/ (2) 12d TOENAILS. NAIL SHEATHING TO BLOCKING <br />AT 6' O.C. w/ MINIMUM 8d NAILS. BLOCK4 BAYS BACK <br />FROM GABLE TRUSS. <br />WHEN SECOND BRACE IS REQUIRED, NAIL TO OPPOSITE <br />SIDE OF BLOCKING. <br />VGT <br />16 <br />1/4"x3" SDS <br />4940 <br />F2: 590 <br />(2} VCT <br />2 <br />5/8"' ATR <br />7185-2pIy <br />t <br />F1:1185 <br />32 <br />4"x3" SDS <br />F2: 590 <br />DTi2Z <br />1 <br />8 <br />1/2" ATR <br />1/4"x3" SDS <br />_ <br />1825-2x4 min <br />2145 2 2x4 min <br />-- <br />1 <br />5 r ATR <br />FNTT <br />18 <br />0.148"x3-1/2" <br />-- <br />3610 <br />-- <br />HTf5 <br />1 <br />5/8"ATR <br />-- <br />4670 <br />-- <br />Z6 <br />0.148"x3" <br />HiTSKT <br />1 <br />5/8" ATR <br />-- <br />5445 <br />-- <br />26 <br />SD #10x2-1/2" <br />AT3L4Z <br />1 <br />7570 <br />1900 <br />-- <br />3 SEE PLAN FOR ATTACHMENT OF ALL STRUCTURAL <br />SHEATHING. <br />12 <br />0.162"x3-1/2" <br />3 1. AT VERTICALS 3'-6" TO C-6" USE ONE 2x4 'L' BACK. <br />2. AT VERTICALS OVER 6'-6" TO a-e USE (2) 2x4 °L" <br />BACKS (1 EA. SIDE) (OR FRAME PER CASE 3 BELOW). <br />AB#3 <br />1 <br />5/8" ATR <br />18205 <br />2475 <br />- <br />12 <br />0162"x3-1/2" <br />H2.5A <br />10 <br />0.131"x2-1/2" <br />__ <br />565 <br />F1:110 <br />F2:110 <br />H10A <br />18 <br />0.148"xl 1/2" <br />_ <br />yw <br />Fl: 565 <br />x SHTG. 3. AT VERTICALS OVER 8'-4' TO 13'-0' USE ONE 2x4 <br />BLOCKING 1L' BACK AND AN ADDITIONAL DIAGONAL BRACE IS <br />REQUIRED AT THE PEAK AND AT EVERY OTHER VERTICAL <br />MEMBER IN THIS RANGE. ATTACH THE DIAGONAL AT MID <br />HEIGHT AND TO THE BLOCKING BELOW THE ROOF <br />F2: 285 <br />H10A-2 <br />18 <br />0.148"xl-1/2" <br />__ <br />1080 <br />Fl : 680 <br />F2: 260 <br />8' CMU WALL OR UNTIL SHEATHING PER SHEATHING w 5 12d's AT EACH END. IN ADDITION TO <br />/ () <br />SEE PLAN FOR PLAN THE SECOND DIAGONAL A STRONGBACK IS ALSO <br />REINFORCEMENT REQUIRED AT THESE VERTICALS AND MUST BE ATTACHED <br />HUC48 <br />14 <br />1/4"x2-3/4" Titers Z <br />3500 <br />1135 <br />6 <br />0.148"x3" <br />TO EACH 'L! BACK WITH (2) 12d's AND ONE SIMPSON <br />H2.5A OR ONE USP RT5 CONNECTOR. <br />SIDE NAIL All "L' BACKS AND STRONGBACKS w/ 12d's <br />AT 6' O.C. NOTCH "L' BACKS AT TOP AND BOTTOM. <br />2x6 DIAGONAL BRACING w/ (5) 10d COMMON NAILS TO <br />- BLOCKING. UNLESS NOTED OTHERWISE ON PLANS, PROVIDE <br />ONE BRACE NEAR THE PEAK AND THE REMAINDER AT 48' <br />O.C. 0 APPROX. 45-DEG ANGLE. <br />SPLICE DETAIL FOR DIAGONAL 4' LAP WITH 'T' LAP <br />NAILED w/ (2) ROWS 10d GUN NAILS ® 8" O.C. <br />LUS26 <br />4 <br />0.148"x3" <br />865 <br />1165 <br />-- <br />SPH4 <br />0.148"xi-1/2" <br />Side: 640 <br />Center :1280 <br />DTC flips <br />4 <br />3/16"x2-3/4" Titan 2 <br />Fl : 8S <br />2 <br />0.131"x2-1%2" <br />F2:135 <br />A35 <br />12 <br />0.131"xl-1/2" <br />Fl: 650 <br />F2: 670* <br />SDWC15600 <br />1 <br />SDWC15600 <br />-- <br />615 <br />Fl: 130 <br />F2: 225 <br />SD C15450 <br />1 <br />SDVVC15450 <br />-- <br />295 <br />F2: L50 <br />TRUSS ANCHOR <br />SEE CONN. CHART <br />WOOD FRAMING PER PLAN STRUCTURAL <br />SHEATHING PER PLAN <br />PRE ENGINEERED - <br />UTCH HIP GABLE TRUSS BRACING DETAIL w/DROPPED GABLE TRUSSES AT24"D.C. <br />ENGINEERED WOOD <br />ROOF TRUSS AT 24' <br />O.C. MAX <br />CMU WALL <br />• <br />LOYD ROOF SHEATHING <br />(4) 1/4' 0 c 2-1/4' MASONRY <br />SCREWS AT EACH STRAP. (1) SIMPSON HTSM16 <br />CONDTIONS OF USE (OR APPROVED EQUAL) <br />SHEATHING PER PLAN 1. QUANTITY OF MISSED STRAPS DOES NOT EXC® FlVE (5) CONSECUTIVE LOCATIONS AT EACH MISSED <br />2. UPLIFT VALUE FOR TRUSS LOCATION DOES NOT EXCEED 1,175 lbs. UPLIFT. LOCATION. <br />R09CPARTIAL GABLE END TRUSS DETAIL IF FIELD "CONDITI�OJSTEXCEED CONDITIONS OF USE, CONTACTRUSS TNENGINEER OR ARCHITECT OF RECORD FOR APPROPRIATE SOLUTION. <br />PARTIAL GABLE <br />R13 MISSED TRUSS STRAP REPAIR <br />(TYPICAL CMU WALL CONNECTION) <br />sRTUC1m Sam PER PLAN <br />2x4 LADDER FMWG AT 24 O.C. RM AT <br />OMIM GREATER IM 12•. ATTACH TO TRUSS <br />TW OM w/ (2]-Rid INNS AT 24 04 <br />W. 2x4 w/ (2)12d NALs <br />sur"AL SIFAIIMNG <br />SEE PINT FUR ATFACHMENT <br />1. AT YERACHS S-6' TO t-8' USE ONE 2x4 V 60 <br />2. AT YERIICALS 014R 6'-6' TO 94 USE (2) 2x41' <br />8M (1 EA."(OR FM PM CASE 3 BET* <br />3. AT 1ERWAtS OYER 94 10 IS-0' USE ONE 2x4 <br />1' BACK AND AN AOOrNK W11 R BRACE IS <br />RE:QM AT X PEAK NO AT EVERY OTHER 1ERWAL <br />MILD W N IM RANGE ATFACH THE OIA00EWL AT 0 <br />IF]OLT AND M X D0C W MN THE ROOF <br />SHEATHING r/ (5)12ds AT EACH ENO. N AON110 M <br />1HE SEGO W�(1 K A SBxN6BACK 6 ALSD <br />REND AT THESE VERIM AND MUST BE ATIACIFD <br />TO E01' BACK w1H (2)12ds AND X SMM <br />nu MKCTM <br />SOE NAL All 1' RACKS ND =NCB= w/ 12ds <br />AT 6' O.C. NOTCH 1' EMCKS AT TOP AND V M. <br />(2)PT 2x4 w/ 1/2' OSB OR <br />PLYIw SPAS 6 TOP s <br />BOTH OF LINTEL w/ 1/4x5' <br />TAP= 0 6' O.C. EDGE NAIL <br />SLF 1w PR PLAN. <br />`SHEATHING PER PLNL <br />PWa W. 2x12 P.T. PUTS w/ 1/2' 0 x 1O' <br />ANCHOR BOLTS AT t4 O.C. MAX w/2'xf PL <br />wA%W AID r EMBEDIFIET. (Mk 3 RM) <br />dAS1NR1' LINTEL PER PLAN <br />n�GABLE END TRUSS BRACING DETAIL <br />BOSTON HIP <br />20 BMW AT OUGMU ONLY. ATTACH AT EACH <br />END w/ (2)12d MAU WL SHEATHING TO LLO(x1LG <br />AT 6' 04 w/ WWII 8d INNS CLOCK 4 BAYS BACK <br />FROM GABLE TRUSS <br />`■X BRACE IS REQW, ML TO OPPM <br />/ FIN SE SINE OF ROCIONG. <br />TRUSS ANCHOR <br />PER PLAN <br />• BOND BEAM PER PLAN <br />AND SCHEDULE SHEATHING <br />PER PLAN <br />3DINGr/(5)1�GIN� R08B WALL BRACING AT BEARING WALL <br />RWW. UNLESS NOTED ORFRW ON PLANS, PRM <br />O � "GP WE iNE Rou81DER AT 48' <br />a <br />0 <br />N <br />0 <br />co <br />� <br />45 <br />00 <br />O <br />0 <br />00 <br />� <br />N <br />V� <br />c� <br />• <br />-d <br />�O <br />0 <br />bb <br />-2 <br />cf) <br />N <br />as <br />' � r <br />G sue_ <br />T <br />s� <br />N <br />�i <br />v <br />o <br />O <br />00 <br />OI <br />00 <br />*N� <br />4 <br />0 �? <br />H <br />- A <br />%4-4 s-4 0 <br />an Ln 0 <br />PRODUCT MANAGER <br />I RELEASE I <br />DATE: xx /xx /xxxx <br />SPUCE M AL FOR OINxINAI 4• LAP VW 'T' LAP C.O.A.# ARCHITECTURE: <br />NAILED r/ (2) ROw510d GIN INNS 0 8• QC AA28Od M <br />C.O.A.# ENGINEER04G: PROJECT TYPE <br />��,�� <br />2) SMM A23 w/ (8)10d x 1-1/r 29M <br />ONE ON EACH SIDE OF BRACE TO TOP PLAN CI TtHOMAS A. WESENR, PESlrl le Fill 111 <br />P.E. # 73242 FLORIDA <br />■ BEWAMIIN NIESF, PE SPECIFICATION LEVEL <br />P.E.#8&025 FLORIDA SPECIFICATION <br />5/ <br />DATIE `% 11 I 11111, <br />����1 ap,�il11 , ✓�, PLAN NAME <br />NPC ILD NUMBER <br />2116.501 <br />.w • <br />�• i ,(SHEETS41 <br />