1X4 1/2" DRYWALL
<br />DOOR JAMB (REFER 1 X4 1/2" DRYWALL DOOR JAMB (REFER
<br />1 X 4 1/2" DRYWALL
<br />, UNACCEPTABLE INSTALLTION
<br />,
<br />DOOR JAMB (REFER P T
<br />TO SHT. SDW2-K1
<br />TO SHT. SDW2-K1 TO SHT. 1
<br />PROPER INSTALLATION MAX. $" DO NOT DO THIS
<br />` '
<br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C.
<br />FOR CONN. DETAILS
<br />N. DETAILS
<br />FOR CONN. DETAILS FOR CONN. DETAILS
<br />1 X 4
<br />1 X 4
<br />` #5 REBAR (TYP,) '
<br />3/4 PLYWOOD DECKING GLUED
<br />ATTACHED WALL SHEATHING TO
<br />1 X 4
<br />3-1/4" LONG X 3/16"� FURRING
<br />Ei!
<br />T 16"0 X 3" LONG FURRING 3/16"0 X 3-1/2" LONG
<br />FURRING
<br />�P )BAR 4` '
<br />AND NAILED W/ 8d COMMON @
<br />6" O.C. EDGES AND 12" O.C. FIELD
<br />2X BOTTOM PLATE WI 8d @ 4"
<br />O.C., 2 ROWS STAGGERED
<br />TAPCON. INTO
<br />STAGGERED @ 16" TAPCONS STAGGERED
<br />2X8
<br />` '
<br />BLOCK@ SPACING „
<br />1 DETAIL
<br />1X8 P.T. STAGGERED 16 O.C.
<br />O.C. 2-ROWS INTO 2-ROWS INTO
<br />1X8
<br />PER MANUFACTURE
<br />MASONRY THROUGH 1-1 /211 DETAIL MASONRY THROUGH 1�
<br />3 DETAIL
<br />STD. 90^ 90° HOOK (TYP.)
<br />2x BAND JOIST W/ FACE NAIL 10d
<br />@ TOP & BTTM CHORD, AND (8)
<br />1x4 P.T. & 1x8 P.T. 1x8 P.T. & 2x8 P.T.
<br />FILL SOLID
<br />BOTH CELLS
<br />HOOK (TYP.)
<br />FACE NAILS 10d @ TRUSS VERT.
<br />WEB
<br />3/16" x 3 -1/2"
<br />TAPCON @ 16"L17
<br />METAL SEAT PLATE
<br />1X4 P.T.
<br />NOTE:
<br />O.C. & 4" FROM
<br />3/16" x 3 -1/2" DOOR JAMB (REFER
<br />1 X 4 1/2" DRYWALL
<br />LAP SHEATHING TO
<br />DOOR JAMB (REFER EACH END W/ MIN
<br />2" EDGE DIST.
<br />DOOR JAMB REFER TAPCON TO SHT. SDW2-K1 FOR
<br />{
<br />TO SHT. SDW2-K1 CONN. DETAIL
<br />`
<br />BOTTOM OF BAND
<br />D
<br />TO SHT. SDW2-K1
<br />JOIST TYPICAL
<br />FOR CONN. DETAILS
<br />FOR CONN. DETAILS „
<br />10d @ 12 O.C.
<br />1 X 4
<br />J
<br />FURRING
<br />_ —
<br />2X8 P.T. WITH 3/16"0 X 3"
<br />' f2„ NOTC F,0 @FIRST COURSE
<br />USP HGAM10 12" O.C. w/4-SDS
<br />@
<br />1/4x1 1/2" SCREWS INTO BAND
<br />LONG TAPCONS
<br />2X8 P.T.
<br />2X8
<br />`
<br />„
<br />2x P.T. AS REQ'D
<br />STAGGERED @ 16" O.C.
<br />I `
<br />JOIST & (4) 3/16"x1-3/4 WEDGE
<br />BOLTS INTO K.O. BLOCK
<br />2x DETAIL
<br />21 /4" DETAIL 2-ROWS INTO MASONRY 3-1/4" DETAIL
<br />t5^
<br />NOTCH WEB AT THE
<br />FIRST 2 COURSES '
<br />BUILDOUT @ OVER SIZE DOOR
<br />-WINDOW ROUGH OPENINGS CC
<br />FILLED CELL PER
<br />FOUNDATION PLAN
<br />FILLED CELL INSTALLATION rH
<br />RETROFIT FOR MISSING
<br />EMBEDDED STRAP
<br />SCALE: N.T.S.
<br />SS
<br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S.
<br />SCALE: N.T.S.
<br />SS
<br />2x8 P.T. BUCK -CONNECT TO BLOCK
<br />SECTION
<br />UPLIFT CAPACITY = 945 # FOR 1 STRAP
<br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN.
<br />A'A
<br />=1890 # FOR 2 STRAPS
<br />FILL 1st4 COURSES
<br />EMBEDMENT INTO BLK.) 1/4" MAX
<br />�. SOLID W/GROUT
<br />2'-0'
<br />8"
<br />1-PLY PRE-ENGINEERED TRUSS
<br />,
<br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN.
<br />ARCH BLKG. & BUCK
<br />1/4" x 31/4" TAPCONS
<br />USP RT16M W/ (8) NA11 NAILS & (6)" x 24"
<br />BLOCK HEADER
<br />TAPCONS
<br />1/2" DRYWALL
<br />' ` (IF TRUSS IS 2 PLY INSTALL USP HTWM16 W/ (6)
<br />10d NAILS x 1? NAILS AND
<br />8d NAILS AT 8„ O.C. AT BUCK
<br />LEAVE A CUTOUT IN O.S.B. ON THE
<br />(4) T" X 1 t" WEDGE BOLTS [ (1) STRAP =1225
<br />2 x 8 45^ DIAGONAL (4)10d NAILS INTO
<br />BRACE(S)
<br />INSIDE TO ALLOW FOR INSULATION
<br />2 STRAPS 2450#
<br />() �)
<br />:'.
<br />2 x 8 BRACE/ BLKG.
<br />7/16" OSB
<br />TO BE INSTALLED
<br />BOND BEAM OR CAST
<br />FOR OVERHANGS BETWEEN OVER 1 1/2'
<br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR
<br />POLY -CELL IN THIS AREA
<br />2 x 8 45 DIAGONAL BRACE AT EA.
<br />- IN PLACE BEAM
<br />CONTACT ENGINEER OF RECORD FOR ;:........, .,;.
<br />FURTHER INSTRUCTIONS. °
<br />SCRIBE (NOTCH)
<br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8
<br />FACE OF ARCH W/ (3)10d NAILS
<br />AT EA. END
<br />RETROFIT TRUSS DETAIL
<br />OVERHAN
<br />CONNECT W/ 8d NAILS BRACE/ BLKG.
<br />N.T.S.
<br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB
<br />INSTALL WDW. SCREW ANCHOR -,ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8El
<br />PROVIDE TAPCON WITHIN
<br />RETROFIT WALL OVERHANG DETAIL
<br />(NTS)
<br />INTO ARCH BLKG. PER
<br />A
<br />4" MIN. OF BRACE
<br />2 X 4 #2 SYP SCAB TO SIDE OF
<br />INSTALLATION DETAILS -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU
<br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6"
<br />FOR OVERHANGS BETWEEN 3/4"TO 1 1/2"
<br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF
<br />ARCH
<br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH
<br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H.
<br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D.
<br />START OF ARC
<br />IF TRUSSES USED) W/ (3) #6 X 4Y2 WOOD
<br />4 MAX. RAD.
<br />SCREWS @ 16" O.C. MAX. OR IF MASONRY
<br />xO (2)10d NAILS @ 8" O.C.
<br />ARCH DETAIL
<br />J
<br />WALL USE (3) 1/4' X 31/2" TAPCONS AT 16"
<br />TO TRUSS TOP CHORD
<br />SCALE: N.T.S.
<br />SS
<br />O.C. 12
<br />�FNOT
<br />N PLYWOOD SHEATHING
<br />1 r-0or 51-011
<br />JACK TRUSS PROVIDED BY SEE
<br />+ +
<br />TRUSS COMPANY OR PLAN
<br />2x6 #2 SYP @ 24" O.C.
<br />+ +
<br />+
<br />INISH FLO
<br />2 x 8 BUCK - CONNECT TO BLOCK
<br />SECTION
<br />+ + BLOCKING AS
<br />°
<br />"�
<br />WITH 1/4" x 31/4" TAPCON (1 1/4" MIN.
<br />B-B
<br />ROOF SHEATHING ATTACHED
<br />+ REQUIRED
<br />> ` ' ►
<br />„ EMBEDMENT INTO
<br />/4 MAX )
<br />PER NAILING SCHEDULE ALL
<br />TO SUPPORT
<br />TRUSS
<br />•
<br />° ' ' '
<br />:�
<br />#5 BAR
<br />2'-0" 8"
<br />+ + SOFFIT
<br />• ►: .:, • p °°
<br />�" •
<br />D'
<br />CENTERED W/
<br />BLOCK HEADER
<br />SOLID BLKG. AT TOP BTWN. ARCH
<br />5 -12d NAILS
<br />()
<br />+
<br />►
<br />_
<br />TOP
<br />1 X 4 FURRING
<br />BLKG. & BUCKIN
<br />2X6 TO 2X4 USP RT3A
<br />2X4 SYP • •
<br />. '
<br />• e - •
<br />,
<br />KNOCKOUT / N
<br />EACH TRUSS
<br />a •B .
<br />°
<br />°
<br />CHAIR BLOCK
<br />8d NAILS @ 8" O.C. AT BUCK
<br />2 x 8 VERT. W/ (2) 10d
<br />s
<br />CONNECTOR
<br />PROVIDE 2 x 8 DIAG. BRACE BTWPILI
<br />NAILS AT EA. END
<br />PROVIDE (2) MIN.
<br />PROVIDE 2x
<br />CONT. W/ (3)
<br />�
<br />MONO FOOTING
<br />- -- •e •' e
<br />VERT. BRACES WHEN HGT. OF
<br />TAPCON AT EA. SIDE
<br />12d NAILS
<br />SEE LINTEL
<br />.
<br />SIZE AND REINF. PER PLAN
<br />BRACE EXCEEDS 24"
<br />BUCK- (1) WITHIN 4"
<br />JACK TRUSS PROVIDED BY
<br />SCHED.
<br />AND SECTION DETAILS
<br />LEAVE A CUT OUT IN O.S.B. ON T
<br />MIN. OF START OF
<br />TRUSS COMPANY OR 2x4
<br />-� °
<br />.►
<br />2 x 8 VERT. BRACE(S)
<br />INSIDE TO ALLOW FOR INSULATION
<br />ARCH
<br />#2 SYP @ 24" O.C.
<br />ENTER SO IT
<br />CLEAN FILL •. !
<br />DIRT 4
<br />z
<br />TO BE INSTALLED
<br />BUILT UP PLWD. BUCK-
<br />4'-0" MAX SEE PLAN
<br />PRECAST LINTEL
<br />•••'.
<br />°ffTANDARD c
<br />SCRIBE (NOTCH) BACKSIDE
<br />7/16" OSB ARCH PANEL
<br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH
<br />SEE ELEVATION
<br />#5 BAR IN ►
<br />HOOK iv
<br />TO FIT ARCH CONNECT W/
<br />START OF ARC
<br />IF TRUSSES USED W/ 2 #6 X 4%" WOOD
<br />) ()
<br />FOR OVER HANG
<br />FILLED CELL, -� -.� -�, , . -� ,
<br />8d NAILS
<br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS)
<br />4' MAX. RAD.
<br />SCREWS @ 16" O.C. MAX. OR IF MASONRY
<br />(MAX. 4'-0")
<br />... �- �. k, V :. L,
<br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL
<br />WALL USE (2)1/4" X 31/2" TAPCONS AT 16"
<br />L
<br />INSTALL WDW, SCREW
<br />THRU OSB INTO 2 x 8
<br />O.C.
<br />. � .
<br />, f , f , f , , Sk
<br />ANCHOR INTO ARCH BLKG.
<br />PER INSTALLATION DETAILS
<br />ARCH DETAIL rK
<br />SECTION @ENTRY L
<br />SECTION @ROOF EXTENSION M
<br />STEMWALL FOOTING SIZE AND
<br />REINF.
<br />B-gMONO
<br />TO STEMWALL FOOTING
<br />PERLAN AND STEMWALL
<br />SCALE: N.T.S. SS
<br />SCALE: 3/4" =1'•0" SS
<br />SCALE: 3/4" =1'-0" SS
<br />SECTION DETAILS
<br />SCALE: 3/4" =1'-0"
<br />GLASS BLOCK INSTALLATION NOTES
<br />NOTE:
<br />IF RETROFIT FILLED CELL CONDITIONS
<br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY
<br />EXCEED
<br />(3) PER PROJECT, CONTACT ENGINEER OF RECORD
<br />AT LEAST 2 HOURS BEFORE PLACING MORTAR.
<br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP
<br />FOR ADDITIONAL
<br />INSTRUCTION.
<br />EXTENDS TO SILL.
<br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL.
<br />MASONRY WALL. SEE PLAN FOR
<br />EXISTING BOND BEAM.
<br />REINFORCING. PROVIDE LOWER
<br />D SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS
<br />HOOKED DOWEL
<br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE
<br />SEE SHEET D2 AND
<br />DRILL 3/4"X6"MIN. HOLE
<br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE
<br />EXPANSION STRIP
<br />FLOOR PLAN FOR
<br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT
<br />20 ga. PANEL
<br />MORE INFO
<br />SET BAR IN EPDXY
<br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS
<br />ANCHOR
<br />HTT16 W/ (18) -16d NAILS TO
<br />CAP TO PREVENT LEAKAGE
<br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER
<br />"SQUEEZED"
<br />W.W.M. AT PERIMETER
<br />STUDS & (1) - 5/8" DIA. ALL
<br />COURSES TO PREVENT THE MORTAR FROM BEING OUT.
<br />1/4" EXPANSION BOLT (2
<br />WHERE THIS CONDITION
<br />#5X6' EMBEDDED INTO
<br />E INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS
<br />9 ga. PANEL PER ANCHOR)
<br />(1) #5 BARS CONT. OCCURS
<br />TOP WITH MIN. 3"
<br />THREAD ROD EPDXIED W/
<br />SIMPSON "SET" EPDXY MIN.
<br />cr
<br />Z
<br />EXISTING BOND BEAM
<br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING
<br />REINFORCING
<br />COVER g�_0"
<br />5"EMBEDMENT & 3"MIN.
<br />co
<br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL
<br />(EVERY OTHER
<br />F'F
<br />EDGE DISTANCE
<br /><
<br />FILL CELL FULL HEIGHT W/
<br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS.
<br />COURSE) EXPANSION STRIP
<br />LL W
<br />NON SHRINK GROUT.
<br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE
<br />,
<br />p U
<br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL
<br />° ;:
<br />;' o
<br />v a
<br />A
<br />REINFORCING AS FOLLOWS:
<br />�; =:' '
<br />Q
<br />1
<br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW.
<br />;:;:::..:.�. : {: :;• :='. SEALANT
<br />':.:;,:.,.
<br />LL a
<br />* PRESS PANEL REINFORCING INTO PLACE.
<br />, ..'-:'.
<br />v z
<br />5X6' EMBEDDED INTO
<br />6" MIN. LAP SPLICE W/
<br />a � °
<br />¢ �
<br />EXISTING FOOTING
<br />2-#5X6' IN CONC.
<br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL
<br />' �, . �'..'':':.' = REINFORCING PANEL
<br />':
<br />In
<br />FILLED CELL
<br />SMOOTH. DO NO FURROW.
<br /><:
<br />'f'° "'
<br />n
<br />DRILL 3/4"X6" MIN. HOLE
<br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT
<br />.,..
<br />GRADE o,
<br />SET BAR IN EPDXY
<br />:.
<br />FURROW. MAINTAIN UNIFORM JOINT WIDTH.
<br />�'�> � � `..;" 6 MIN. LAP
<br />� p
<br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST
<br />`<" SPLICE NOTE:
<br />REMAIN FREE OF MORTAR.
<br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS
<br />SEE GLASS BLOCK INSTALLATION NOTES.
<br />g o
<br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE
<br />SEALANT
<br />, °
<br />\tea
<br />,4" SAW CUT
<br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY.
<br />GLASS BLOCK DETAIL
<br />\ ' (2) #5 REBAR. MIN. 3"
<br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE
<br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160
<br />16" MIN. COVER EA. WAY
<br />A SECTION
<br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN
<br />EXISTING FOOTING
<br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING.
<br />1 SCALE: N.T.S.
<br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE
<br />SECTION AT DEEP MONO FOUNDATION
<br />RETROFIT FOR MISSING MSTAM STRAP
<br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS.
<br />RETROFIT
<br />FILLED CELL DETAIL
<br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING.
<br />SCALE: 3/4" =1'-0"
<br />SCALE: 3/4" =1'-0"
<br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR
<br />SCALE: N.T.S.
<br />INSTALLATION OF GLASS BLOCK.
<br />ID
<br />Z M
<br />0094
<br />—
<br />z
<br />Q
<br />J
<br />z
<br />U,
<br />Ln
<br />W C/)
<br />-� W
<br />°U
<br />—
<br />0 w
<br />m
<br />IU)
<br />v ' _
<br />o
<br />U) M
<br />~
<br />C)
<br />�C)
<br />m N
<br />W
<br />— U
<br />'. O
<br />M M
<br />Ofcc M
<br />O O N
<br />= Qj
<br />U
<br />I--U.000
<br />7
<br />m
<br />C -4
<br />QCL
<br />om,
<br />o- o
<br />0 O a
<br />Qo
<br />A I
<br />B Do
<br />NCB`DC
<br />t
<br />r
<br />Owl
<br />-.- • • ••• N
<br />o O n
<br />0 •ir
<br />�f N e
<br />Z
<br />_ A
<br />Nod
<br />�
<br />''r.l1i131k��c.
<br />❑ ❑
<br />To the best of the Engineer's knowledge, information, and
<br />belief, the structural plans and specifications contained
<br />within these drawings comply with the Florida Building
<br />Code 5th Edition (2014) Residential. Engineer's signature
<br />and seal is only for the structural engineering portions of
<br />the drawing pages bearing Engineer's signature and seal.
<br />O
<br />ON
<br />Z
<br />0��
<br />> V) M O
<br />Q o Ln
<br />d-
<br />v LL Ln
<br />Q
<br />f— M
<br />DC V � '
<br />a O
<br />Q
<br />E
<br />Z
<br />J �
<br />W
<br />oZ
<br />U
<br />wo
<br />zaa
<br />Z�
<br />�z80
<br />�W�
<br />z
<br />Lu
<br />�u-5
<br />CIS
<br />Z
<br />Z=
<br />�--I
<br />ro
<br />a
<br />O
<br />C
<br />w3
<br />O
<br />>
<br />1
<br />g
<br />V
<br />^^f
<br /><
<br />W
<br />20
<br />W
<br />p
<br />U a m 2
<br />AN
<br />Zao�
<br />,,,3
<br />Z
<br />J
<br />W
<br />LL1
<br />o
<br />O"wv
<br />EF<6
<br />I�
<br />Q
<br />Q
<br />Z
<br /><Z
<br />k
<br />Z
<br />$ z
<br />�o
<br />m
<br />g
<br />=
<br />az
<br />SCALE : AS NOTED
<br />DATE : 2/24/2014
<br />TECH: MJAMES
<br />VERSION NO. 10
<br />SHEET NO.
<br />SS
<br />
|