Laserfiche WebLink
1x4 1/2" DRYWALL DOOR JAMB (REFER 1x4 �1/2" DRYWALL DOOR JAMB (REFER 1x4 1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER TO PRODUCT <br />�— <br />P.T. To PRODUCT — - <br />MAX. 8 DO NOT DO THIS <br />PROPER INSTALLATION <br />2"x BOT. PLATE WI (2) 10d @ 6" O.C. <br />TO PRODUCT APPROVAL FOR CONN. <br />APPROVAL FOR CONN. APPROVAL FOR CONN. <br />1x4 1 X 4 <br />#5 REBAR (TYP,) <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />. <br />1x4 P.T. 3/16"0 X 3" LONG FURRING FURRING <br />2 ROWS 3/16 x 3-1/2 <br />() <br />#5 REBAR <br />AND NAILED W/ 8d COMMON @ <br />2X BOTTOM PLATE W/ 8d @ 4" <br />O.C., 2 ROWS STAGGERED <br />N <br />� <br />3-1/4" LONG X 3/16"0 FURRING TAPCONS <br />TYP <br />( ) <br />6" O.C. EDGES AND 12" O.C. FIELD <br />N <br />TAPCON. INTO STAGGERED @ 16" TAPCON 16" O.C. & 4" 2X8 <br />BLOCK@ SPACING 1x8 P.T. FROM EACH END w/ MIN. 1X8 <br />R ,� <br />r <br />M <br />�� O.C. 2-ROWS INTO 2" EDGE DIST. ATTACH <br />PER MANUFACTURE 1 DETAIL <br />MASONRY THROUGH 1� <br />To. HOOK <br />2x BAND JOIST W/ FACE NAIL 10dr <br />•< e <br />1x8 w/ 2 ROWS 8d NALS �� <br />1-1/2 DETAIL ( ) 3 DETAIL <br />STD. 90^ <br />@ TOP & BTTM CHORD, AND (8) <br />o <br />1 x4 P.T. & 1x8 P.T. STAGGERED @ 12" O.C. <br />FILL SOLID HOOK (TYP. <br />BOTH CELLS ) <br />FACE NAILS 10d @TRUSS VERT. <br />l F F'd`00n <br />�- <br />3/16" x 3 -1/2" DOOR MB <br />TAPCON @ 16" 1x4 P.T. <br />WEB <br />.,-, z . <br />L.L. <br />a <br />TO PRODUCT <br />O.C. & 4" FROM DOOR JAMB (REFER 1/2" DRYWALL0I'D <br />APPROVAL FOR CONN. 1x4 <br />NOTE:; <br />LAP SHEATHING TO <br />• "� <br />( ` <br />z <br />w <br />DOOR JAMB (REFER EACH END W/ MIN. TO PRODUCT <br />APPROVAL FOR CONN. 2x8 P.T. w/ 2 ROWS 3/16" <br />2" EDGE DIST. O <br />BOTTOM OF BAND <br />w` <br />d4 �+ <br />g <br />2 <br />TO PRODUCT <br />x 3-1/2" TAPCON @ 16 <br />JOIST TYPICAL <br />APPROVAL FOR CONN. 1x4 <br />2 ROWS 3/16" x 3-1/2" <br />O O.C. & 4' FROM EACH <br />r <br />;f <br />TAPCON 16" O.C. & FURRING <br />@ END w/ MIN. 2" EDGE DIST. <br />� NOTC @ FIRST COURSE <br />SIMPSON HGAMIOKTA @ 12" O.C. <br />{ <br />w <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />+2 <br />- <br />w/ (4) 1/4xl 1/2" SIDS SCREWS <br />IX <br />p <br />2x P.T. AS REQ'D MIN. 2" EDGE DIST. (2) ROWS 10dx3" 2x8 <br />INTO BAND JOIST & (4) 1/4"x2 3/4" <br />z <br />2x DETAIL 2 1/4" DETAIL STAGGERED @ 12" O.C. 3-1/4" DETAIL <br />NOTCH WEB AT THE <br />FIRST 2 COURSES <br />TITEN INTO K.O. BLOCK <br />+5^ <br />BUILDOUT OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />LED CELL PER <br />P AN <br />FOUNDATION <br />FILLED CELL INSTALLATION H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />`� o <br />SCALE: N.T.S. SS <br />SCALE: N.T.S. <br />SS <br />i q <br />' M <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. <br />INFO SCALE: N.T.S. <br />i, ,} <br />M <br />co <br />N V -0 d m <br />0 B o <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />UPLIFT CAPACITY = 805 #FOR 1 STRAP <br />w o o Q <br />- 0 <br />W/ 1/4" x 3 1/4" TAPCON ( 1 1/4" MIN. A <br />-A <br />=1610 #FOR 2 STRAPS <br />TLAII AND <br />FILL ista coURSES <br />SOLID W/GROUT <br />i U <br />�N w Q l <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />2'-0" 8" <br />1 PLY PRE-ENGINEERED TRUSS <br />wr �: " I- ' Lx1.F <br />`. <br />L.. 000 <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. <br />1/4" x 3 1/4" TAPCONS <br />I w <br />€ ` <br />• <br />O m <br />� � r ° <br />BLOCK HEADER ARCH BLKG. &BUCK,•� <br />SIMPSON HM9KT w/ (4) 1/4"xl 1/2" SIDS <br />^• <br />e <br />t <br />1/2" DRYWALL <br />SCREWS & (5) 1/4" x 2 1/4" TITEN (IF TRUSS <br />- <br />-_ <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />x •_I_E ASZIA. <br />, <br />8d NAILS AT 8" O.C. AT BUCK <br />^: ;;,'i :.'. ° : < SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 #) <br />" <br />' <br />2 x 8 45^ DIAGONAL <br />BRACES <br />() (2)x <br />LEAVE A CUT OUT IN O.S.B. ON THE <br />INSIDE TO ALLOW FOR INSULATION <br />B•'�'� INALL T FIE • <br />8 BRACE/IBLKG. <br />7/16" OSB <br />TO BE INSTALLED <br />r: - `' '. ''>: BOND BEAM OR CAST IN PLACE BEAM <br />- <br />` M HL,>V, 1 •. "' T rml I"".AIi xTEI) <br />b, <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />ARCH PA CUT HOLE IN Q.S.B. FOR <br />BUILT UP PLWD. BUCK PANEL <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />I I<_.w <br />I- -# . -LL F <br />", �,I� 0 � <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />SCRIBE (NOTCH) POLY -CELL IN THIS AREA <br />FACE OF ARCH W/ (3) 10d NAILS <br />„. <br />A, ENED PER I <br />BACKSIDE TO FIT ARCH (4) 10d NAILS INTO 2 x 8 <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />BEL 1:T ')� EL° ' =rl)D _,.`FT <br />ovERHAN b <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />_ , .- - . -1,MLE L . 0 ,.. B DC ,NII1_f NkILI.L' T CIu T� -16 <br />N.T.S. <br />E;,^r C', H F R I R-1: <br />INSTALL WDW. SCREW ANCHOR 2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 <br />PROVIDE TAPCON WITHIN <br />vH 9 ��� I° f+�IL x `� E 1= d <br />a. <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />o w � <br />� � � J � Q O Z <br />INTO ARCH BLKG. PER <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />4" MIN. OF BRACE <br />� E1�J6L k� � Tm a �, :I it 1, TE 3� `kP�hl :�F� ITIE L'.. E <br />3 <br />i.N THE DE S I04 PR Si Q :_, , ; r, Tw1i #_)IIL I I „ , N[) K ;L,AC HNI <br />FOR OVERHANGS BETWEEN 3/a° TO 1 1/2° <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />1-1/2' THK. OR MORE BUCK WITHIN 6 MIN. OF START OF ARCH <br />START OF ARC <br />IF TRUSSES USED) W/ (3) #6 X 4'%" WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />/ <br />? I. ,T O «1 THEE DE�-I N iC:; TER; t N' SHEET SN <br />F :P fOHF:! V FACwHi'w1-far 1 A] 5•�,`" ll EI L ° - LI � 4-J a F _.a I:.. . <br />-° <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />w (� W LLJ <br />Q Q (D <br />� <br />� O= � _ � O � � � � U O OL J 0 <br />� � � J Z � � p U) 2o o Z ¢ Q <br />ARCH DETAIL J <br />4' MAX. RAID. <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ <br />i <br />P }0' TzF PRO AIL)F wFAN EL FA <br />t _1L 0 7` € EI'EEL"I 1047 <br />F- � <br />� <br />//��(( O Q <br />Otow,OZO�OOmZ U <br />w wCO w w w ¢ <br />c� > z o z LL O a <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />12 <br />g c <br />3W d .�'!0 11. �3} 1�. € A ;- _} .i- .,. .. f:C.. �r,..l� `S __:L i. �� 1Y1 A';:.. G..� C_ IN ��I�.@:"��.��+I&•AT� � <br />11—p" F—p" <br />C0 0 z <br />¢ ¢ ¢ O z � m Z w w 2 w U ° Q <br />SCALE: N.T.S. SS <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />i <br />T T ET <br />_t_ F: F, ".I= 4 16 (; 34 N'1 �4 1,RC) IN n r APtE (P ,, h f_n .(v VE <br />- <br />INISH FLOge <br />o K o = o ¢ Z < ¢ <br />U_ ¢ o F ¢ LL <br />2 <br />WITH <br />x 8 BUCK - CONNECT TO BLOCK SECTION <br />1/4" x 31/4" TAPCON (1 1/4" MIN. B_B <br />ROOF SHEATHING ATTACHED" <br />�� _: <br />PANS <br />° <br />H <br />EMBEDMENTINTO K.) <br />PER NAILING SCHEDULE <br />ALL <br />E _' F € L E 1 NI 1 S F7S' IT 1 <br />° D <br />° <br />1/4" MAX " <br />2'-0" 8 <br />� , � 9 2` 2021 1. N ; I I I OI A1 E , 0-KIN 3�k <br />OI FL PAN I.AALA I0 II E <br />D , . D #5 BAR <br />� P a <br />10" a <br />O <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />5 12d NAILS SIMPSON <br />O <br />i <br />I H E `` F � °'� `�° <br />' <br />CENTER / <br />p D° ED W <br />°, 90` H IN TOP - <br />tV <br />1 X 4 FURRING <br />BLKG. & BUCK <br />2X6 TO 2X4 8d NA w/ (10) <br />8d NAILS <br />-REFER, TO THE. PRODUCT APPROVAL V' L< ETVR INSTAL,L� T ION DETAI'LS•': <br />° q <br />KNOCKOUT / N <br />13• . ' <br />Z LLJ <br />� <br />CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />I — — ° <br />Z) <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />TRUSS AS SHOWN FOR O.H. UP TO 2 -6 <br />PROVIDE 2 x 8 DIAG. BRACE BT <br />2 x 8 VERT. W/ (2) 10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ (3) <br />- = p <br />_ <br />MONO FOOTING - _—_ •,, , ° <br />I ° <br />> U.) O p <br />0 M O <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />TAPCON AT EA. SIDE <br />BUCK - (1) WITHIN 4" <br />12d NAILS <br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />2 10d NAILS 8" O.C. <br />O @ <br />SIZE AND REINF. PER PLAN — <br />AND SECTION DETAILS `I <br />� <br />MLn <br />a J <br />JACK TRUSS PROVIDED BY <br />XOV <br />I ° <br />Ln LL. V- <br />2 x 8 VERT. BRACE(S) <br />LEAVE A CUT OUT IN O.S.B. ON T <br />INSIDE TO ALLOW FOR INSULATION <br />MIN. OF START OF <br />ARCH <br />TRUSS COMPANY OR 2x4 <br />FRygN TO TRUSS TOP CHORD <br />�FN <br />CLEAN FILL o ° ' <br />Z <br />Q LLJ Ln <br />Q <br />TO BE INSTALLED <br />#2 SYP @ 24" O.C. <br />+ + GTy PLYWOOD SHEATHING <br />+ + <br />DIRT <br />° STANDARD o <br />I— �- M <br />� <br />4'-0" MAX SEE PLAN <br />BUILT UP PLWD. BUCK - <br />+ + <br />0 90` HOOK N <br />Q Q 00 <br />U <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />+ + <br />BLOCKING AS <br />#5 BAR IN <br />Z I -- <br />Z <br />TO FIT ARCH CONNECT W/ <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />NOTE: IF TRUSSES USED) W/ (2) #6 X 4'/2' WOOD <br />SHED ROOF ENDS TO BE SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />+ + <br />+ REQUIRED <br />FILLED CELL ®® , a �' , - ® , g ® <br />®. ° ®, e � ®~ � � �®®� � �® <br />Uj <br />J 00 <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL EQUAL <br />4' MAX. RAID <br />GABLE ONLY, CORNERS WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />TO SUPPORT <br />TRUSS + <br />_ _ <br />®® ' <br />INSTALL WDW, SCREW <br />ANCHOR INTO ARCH BLKG. <br />THRU OSB INTO 2 x 8 <br />SHALL NOT BE FRAMED AS O.C. <br />HIP. <br />+ + SOFFIT <br />+ <br />>� �• �� ®• �� ®• ®• �• <br />STEMWALL FOOTING <br />SIZE AND <br />PER INSTALLATION DETAILS <br />B-g <br />ARCH DETAIL K <br />DESIGNED ONLY FOR THE SECTION @a ENTRY L <br />2X4 SYP d s ® <br />REINF. PERLAN AND <br />STEMWALL <br />SCALE: N.T.S. SS <br />INSTALLATION OF SHINGLE SCALE: 3/4" = 1'-0" <br />SS <br />EACH TRUSS <br />MONO TO STEMWALL FOOTING SECTION DETAILS <br />N <br />AND METAL ROOF FINISH <br />SCALE: 3/4" = V-0" <br />CONNECTOR <br />Noy <br />GLASS BLOCK INSTALLATION NOTES <br />SEE LINTEL <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />O <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />SCHED. <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />o <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />ENTER SO IT <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />PRECAST LINTEL <br />O <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />SEE ELEVATION <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />ao <br />cfl <br />ao <br />` ao <br />o <br />O <br />O <br />NO <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />"S" <br />2X2 #2 P.T. MIN. FOR OVER HANG <br />EPDXY CAP TO PREVENT LEAKAGE <br />� <br />TYPE OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />W/J-CHANNEL SECURED (MAX. 4'-0") <br />o <br />0 <br />0 <br />0 <br />0 <br />o <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT 20 ga. PANEL <br />@24" O.C. FASTENED TO <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />O <br />N <br />6 <br />N <br />& <br />N <br />N <br />N <br />N <br />N <br />A <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS ANCHOR <br />CMU W/ 3" LONG T-NAILS @ <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") <br />N <br />O- <br />O <br />O <br />ob <br />N <br />0 <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />„ <br />W.W.M. AT PERIMETER <br />„ <br />24 O.C. <br />� <br />4 <br />�. <br />O <br />r <br />O <br />0 <br />O <br />O <br />, <br />N <br />COURSES TO PREVENT THE MORTAR FROM BEING SQUEEZED OUT. 1/4 EXPANSION BOLT (2 <br />(1) #5 BARS CONT. WHERE THIS CONDITION <br />SECTION ROOF EXTENSIONrM <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />o <br />O <br />O <br />O <br />O <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />OCCURS <br />ITH MIN. 3° <br />O <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />COVERTOP <br />SCALE: 3/4" = 1'-0" SS <br />o <br />g <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL (EVERY OTHER <br />g _0' F.F. <br />FILL CELL FULL HEIGHT W/ <br />CD <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />�- "� NON SHRINK GROUT. <br />U <br />N � <br />� <br />�- <br />r' <br />o <br />N <br />O <br />' �''� <br />o <br />� <br />O <br />� <br />o <br />O <br />O <br />� <br />° <br />o <br />A <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />° ° <br />SEE SHEET D2 AND <br />SIMPSON HTT4 w/ (18) 10d x 1 <br />LU <br />REINFORCING AS FOLLOWS: <br />SEALANT <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. D NOT FURROW. <br />C J 0 0 U OW. <br />_ <br />I=III-III=III=III-III; <br />o - - - - - <br />g I -III -III -III -III -III- <br />� �'-' <br />FLOOR PLAN FOR <br />1/2" NAILS TO STUDS & (1) - <br />MORE INFO <br />5/8" DIA. ALL THREAD ROD <br />< a <br />¢ <br />J <br />� #5x6 EMBEDDED INTO <br />z Z <br />* PRESS PANEL REINFORCING INTO PLACE. <br />6 MIN. LAP SPLICE W <br />_ <br />1=III=III=III <br />D — <br />D — — <br />� I I -III -III. <br />EPDXIED w/ SIMPSON SET <br />S <br />U z <br />EXISTING FOOT <br />FOOTING 2 x N <br />� #5 6 I CONC. <br />( ) <br />M C//�J <br />W <br />-Z O <br />p w cA <br />* V REINFORCING <br />COVER PANEL REI ORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />- - - <br />1=III=III- <br />- � <br />° _ - <br />° I I I_I I I_I <br />I=III=III' <br />EPDXY MIN. 6 EMBEDMENT & <br />3" MIN. EDGE DISTANCE <br />¢ o <br />Cl)FILLED CELL <br />DRILL 3/4"x5" MIN. HOLE <br />-F-+ <br />�--+ <br />W <br />V <br />w <br />� p <br />- <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING DO NOT <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6 MIN. LAP <br />GRADE III LI I <br />SET BAR IN EPDXY <br />O a <br />17- w <br />0 <br />a. _ <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />NOTE: <br />CV D <br />" <br />LO -0 <br />Z <br />z <br />w <br />REMAIN FREE OF MORTAR. <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />z_ \ ' <br />c., <br />r o t, " <br />I"' <br />w = z <br />m O <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />° ° <br />\ <br />4" SAW CUT <br />= <br />Z <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET, (REMOVE <br />(2) #5 REBAR. MIN. 3" <br />0 <br />z <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. COVER EA. WAY <br />A SECTION <br />ry <br />>- w O <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />�--� <br />a- <br />Z Z � <br />Z Z <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />I <br />1 SCALE: N.T.S. <br />w 00 <br />F- <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FILLED CELL DETAIL <br />( <br />Q <br />V <br />a w <br />D z z <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: 3/4" = V-0" <br />RETROFIT FOR MISSING <br />SCALE: N.T.S. <br />Of <br />Q <br />z rl <br />z <br />= Q O <br />F- <br />MSTAM STRAP <br />INSTALLATION OF GLASS BLOCK. <br />Q <br />SCALE: 3/4" = V-0" <br />O 0 <br />a <br />A 2023 <br />m <br />z <br />Z <br />w <br />J <br />Virtual Review Assist, In <br />o <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 9th Editi <br />co <br />O <br />> <br />LAST PLOT'ATE <br />Nov. 30, 22 <br />by Debra Anne Klahr PX2300 <br />N , <br />STRUCTURAL <br />z4_0 <br />0 <br />_I <br />DETAILS—RETRO FIT <br />j1ii i i tai.,:ris I.; .11 E 1,111,:a. 1 <br />