Laserfiche WebLink
1X4 1/2" DRYWALL <br />DOOR JAMB (REFER 1 X 4 1/2" DRYWALL <br />DOOR JAMB (REFER 1 X 4 1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER <br />TO SHT. SDW2-K1 P.T. <br />To SHT. SDW2-K1 <br />TO SHT. SDW2-K1 <br />Mom' 8„ DO NOT DO THIS <br />PROPER INSTALLATION <br />2"x BOT. PLATE W/ (2)10d @ 6" O.C.. <br />FOR CONN. DETAILS ', '% <br />FOR CONN. DETAILS �� � � 1 X 4 <br />/ �" <br />� <br />FOR CONN. DETAILS / <br />i 1 X 4 <br />�' ° <br />�� #5 REBAR (TYP,) <br />3/4" PLYWOOD DECKING GLUED <br />�� � <br />3116"0 X 3" LONG ;�� FURRING <br />3/16"� X 3-1/2" LONG �' ' � �� FURRING <br />#b REBAR (TYP,) <br />AND NAILED W/ 8d COMMON @ <br />-1/4" LONG X /1 , - FURRING <br />3 0 G 3 6 0 <br />TAPCONS <br />6" O.C. EDGES AND 12" O.C. FIELD <br />TAPCON. INTO <br />STAGGERED @ 16" <br />TAPCONS STAGGERED 2X8 <br />ATTACHED WALL SHEATHING TO <br />BLOCK@ SPACING „ <br />DETAIL <br />1X8 P.T. <br />O.C. 2-ROWS INTO <br />STAGGERED @ 16" O.C. 1X8 <br />2-ROWS INTO <br />2X BOTTOM PLATE W/ 8d @ 4" O.C., 2 <br />ROWS STAGGERED <br />PER MANUFACTURE <br />MASONRY THROUGH 1-1 /2" DETAIL <br />MASONRY THROUGH �� <br />3 DETAIL <br />. <br />D. 90 HOOK (TYP.) <br />STD. 90^ HOOK (TYP.) <br />I _ <br />1x4 P.T. & 1x8 P.T. <br />1x8 P.T. & 2x8 P.T. <br />FILL SOLID <br />BOTH CELLS 4h, <br />2x BAND JOIST W/ FACE IL <br />3/16" x 3 -1/2" <br />TAPCON @ 16" <br />E11L L <br />10d @ OP & BTTM CHORD, <br />METAL SEAT PLATE NOTE: AND (8) FACE NAILS 10d @ <br />O.C. & 4" FROM <br />1X4 P.T. <br />3/16" x 3 -1/2" <br />DOOR JAMB (REFER 1/2" DRYWALL <br />1 X 4 <br />LAP SHEATHING TO TRUSS VERT. WEB <br />BOTTOM OF BAND <br />DOOR JAMB (REFER EACH END W/ MIN. <br />DOOR JAMB REFER TAPCON <br />( <br />TO SHT. SDW2-K1 FOR <br />� "' <br />JOIST TYPICAL <br />TO SHT. SDW2-K1 2" EDGE DIST. <br />TO SHT. SDW2-K1 — -- <br />CONN. DETAILS <br />FOR CONN. DETAILS <br />' <br />FOR CONN. DETAILS } <br />10d @ 12" O.C. 1 X 4 <br />FURRING <br />2X8 P.T. WITH 3/16" 0 X 3" <br />t2" NOTC @FIRST COURSE <br />USP HGAM10 @ 12" O.C. w/4-SDS 1/4x1 1/2" <br />LONG TAPCONS <br />- <br />SCREWS INTO BAND JOIST & (4) 3/16"xl-3/4" <br />2x P.T. AS REQ'D <br />2X8 P.T. <br />STAGGERED @ 16" O.C. 2X8 <br />WEDGE BOLTS INTO K.O. BLOCK <br />2x DETAIL <br />2 1/4" DETAIL <br />2-ROWS INTO MASONRY 3-1 /4" DETAIL <br />NOTCH WEB AT THE FIRST 2 COURSES <br />_ <br />+5A <br />FILLED CELL PER FOUNDATION PLAN 40 <br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />FILLED CELL INSTALLATION H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. SS <br />SCALE: N.T.S. <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR <br />ADDL. INFO SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />UPLIFT CAPACITY = 945 #FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. A -A <br />= 1890 #FOR 2 STRAPS <br />FILL 1st COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />:' SOLID W/GROUT <br />n 2'-0" 8" <br />1-PLY PRE-ENGINEERED TRUSS <br />' e <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. 1/4" x 31/4" TAPCONS <br />& 1, t„ <br />24 <br />BLOCK HEADER ARCH BLKG. & BUCKZ <br />USP RT16M W/ (8) NA11 NAILS (6) 4 x <br />TAPCONS <br />1/2" DRYWALL * <br />', (IF TRUSS IS 2 PLY INSTALL USP HTWM16 W/ (6) <br />10d1NAILS x 12" NAILS AND <br />8d NAILS AT 8" O.C. AT BUCK <br />(4) 4 X 1 4 WEDGE BOLTS [ (1) STRAP = 1225 # <br />2 x 8 45^ DIAGONAL (4) 10d NAILS INTO LEAVE A CUTOUT IN O.S.B. ON THE <br />, <br />(2) STRAPS 2450#]) <br />BRACE(S) 2 x 8 BRACE/ BLKG. INSIDE TO ALLOW FOR INSULATION <br />7/16 OSB TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BETWEEN OVER 1 1/2' <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA 2 x 8 45 DIAGONAL BRACE AT EA. <br />IN PLACE BEAM <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. ' %'.' ' ; •. •: <br />SCRIBE (NOTCH) * <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 FACE OF ARCH W/ (3)10d NAILS <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />OVERHAN : ` <br />'•j°� <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />N.T.S. <br />'t. <br />INSTALL WDW. SCREW ANCHOR 2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />INTO ARCH BLKG. PER ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />4" MIN. OF BRACE <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU -� <br />2 X 4 #2 SYP SCAB TO SIDE OF � <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />FOR OVERHANGS BETWEEN 3/4" T01 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />START OF ARC <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4'Y? WOOD <br />' DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />/ <br />k0� (2) 10d NAILS @ 8" O.C. <br />TO TRUSS TOP CHORD <br />FRygN <br />ARCH DETAIL <br />WALL USE (3)1/4" X 31/2" TAPCONS AT 16" <br />SCALE: N.T.S. SS <br />O.C. 12 <br />+ ` <br />+ F/y0 <br />+ TN PLYWOOD SHEATHING <br />�� �� <br />1 -Q 5 -O <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />- <br />+ + <br />+ + <br />+ + <br />INiSH FLO <br />2 <br />x 8 BUCK -CONNECT TO BLOCK SECTION <br />BLOCKING AS <br />+ + <br />° <br />WITH <br />1/4 x 31/4 TAPCON (1 1/4 MIN. <br />" B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />D <br />„ EMBEDMENT INTO K.) <br />1/4 MAX <br />PER NAILING SCHEDULE ' <br />ALL <br />TO SUPPORT <br />° _ . ° <br />` #5 BAR <br />2'-0" 8 <br />TRUSS + <br />+ SOFFIT <br />+ <br />D a D <br />p . ° <br />10 ° CENTERED W/ <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />5 -12d NAILS <br />() <br />+ <br />° _ <br />°° 9_" IN TOP <br />1 X 4 FURRING — <br />BLKG. &BUCK <br />2X6 TO 2X4 USP RT3A <br />2X4 SYP sop <br />p .. ° <br />KNOCKOUT / N <br />EACH TRUSS <br />� � <br />° CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />PROVIDE 2 x 8 DIAG. BRACE BT <br />2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x J <br />CONT. W/ (3) <br />/ <br />° ° <br />CONNECTOR <br />MONO FOOTING <br />1 <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />TAPCON j T EA. SIDE <br />BUCK - 1 WITHIN 4 <br />12d NAILS <br />JACK TRUSS PROVIDED BY <br />SEE LINTEL <br />SCHED. <br />7 <br />SIZE AND REINF. PER PLAN ° <br />AND SECTION DETAILS <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />/- <br />° <br />CLEAN FILL D ° D <br />2 x 8 VERT. BRACES <br />() <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO IT <br />DIRT <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />PRECAST LINTELJ <br />°. o <br />4'-0" MAX SEE PLAN <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />LSTANDARD <br />D 90° HOOK N <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4'Y2" WOOD <br />FOR OVER HANG <br />FILLED CELL- <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />- <br />INSTALL WDW, SCREW <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL <br />4' MAX. RAD. <br />WALL USE (2)1/4" X 31/2" TAPCONS AT 16" <br />ANCHOR INTO ARCH BLKG. <br />THRU OSB INTO 2 x 8 <br />O.C. <br />-Ilk <br />PER INSTALLATION DETAILS <br />g-g <br />ARCH DETAILSTEMWALL <br />rK <br />SECTION @ ENTRY rL <br />SECTION @ ROOF EXTENSION M <br />FOOTING <br />REINF. PERLAN AND <br />SIZE AND <br />STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" = V-0" SS <br />SCALE: 3/4" = V-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" = 1'-0" <br />GLASS BLOCK INSTALLATION PERFORMED IN ACCORDANCE WITH FRC / FBC <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />EXCEED (3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />FOR ADDITIONAL INSTRUCTION. <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />REINFORCING. PROVIDE LOWER <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />DRILL 3/4"X6"MIN. HOLE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />HTT16 W/ (18) -16d NAILS TO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />�� <br />COURSES TO PREVENT THE MORTAR FROM BEING SQUEEZED OUT. 1/4 EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />STUDS & 1 - 5/8" DIA. ALL <br />() <br />,_ #5X6 EMBEDDED INTO <br />PER ANCHOR <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL ) <br />(1) #5 BARS CONT. <br />OCCURS <br />THREAD ROD EPDXIED W/ <br />Z I EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />TOP WITH MIN. 3" <br />SIMPSON "SET" EPDXY MIN. <br />; <br />0il <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEAD IN LIEU OF CHANNEL (EVERY OTHER <br />COVER 6'-0" F F <br />5" EMBEDMENT & 3" MIN. <br />Q FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) <br />EDGE DISTANCE <br />1 <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE EXPANSION STRIP <br />o S2 NON SHRINK GROUT. <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />° <br />c P o <br />w a A <br />REINFORCING AS FOLLOWS: <br />* SEALANT <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DON T FURROW. <br />o u ow. _ <br />-1 I -1 I El I i== I I=III- <br />— — — <br />o ° — — — — <br />k. I I —I 11=III—I � I, ; ,III-1 I I- <br />n <br />� � , <br />* PRESS PANEL REINFORCING INTO PLACE. <br />#5X6 EMBEDDED INTO <br />,� <br />6 MIN. LAP SPLICE W/ <br />III=III—III- <br />g EXISTING FOOTING 2-#5X6 IN CONC. <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />1=1 I F1 11= <br />_ = <br />cn N FILLED CELL <br />SMOOTH. DO NO FURROW. <br />00 0 <br />° <br />o III —III —I <br />III= <br />DRILL 3/4"X6" MIN. HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE p p I I=fl - <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6" MIN. LAP <br />p ° <br />, 4 <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />ii <br />REMAIN FREE OF MORTAR. NOTE: <br />" z <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS SEE GLASS BLOCK INSTALLATION NOTES. <br />r 2 p <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />\ (2) #5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) *(110 mph FASTEST WIND =130 mph, 3 SEC. GUST. FRC TABLE R301.2.1.3) <br />16" MIN. COVER EA. WAY <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN *(110 mph FASTEST WIND =130 mph, 3 SEC. GUST. FBC TABLE 1606.1.6.1) <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 3/4" = V-0" <br />SCALE: 3/4" = V-0" <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />N <br />N <br />0 <br />U <br />vi E <br />� N <br />F- <br />N <br />�o <br />coo <br />o <br />a <br />U <br />r <br />N N .. <br />O ry <br />cNi1 <br />_o"'0 0 <br />m fG d' U <br />w O <br />E <br />(Z U_ Cf) <br />�MY <br />N O <br />0o' <br />Y <br />� 0 00 <br />Q. OD <br />U5 <br />rn `� <br />0 <br />A <br />B <br />D® <br />N CBD <br />1° <br />G <br />P <br />A. <br />OkL jia®� <br />a� <br />V lEo Z o <br />m� <br />Wow � OR c;(��t/ <br />/11111 <br />To the best of the engineer's knowledge and <br />understanding, the structural plans and <br />specifications comply with the 2007 Florida <br />Building Code, Residential with 2009 revisions <br />signed and sealed for the structural portion of this <br />drawing. <br />� <br />o <br />� M <br />N <br />M <br />Z :h! co <br />O=6 <br />j r-, o <br />1­4Q 0 M o <br />,--I <br />Q '> fu <br />Fes- >LL� <br />Ce i N <br />Z = 4, Z <br />M <br />WJ <br />CD <br />Lna) <br />LnLn V <br />Q <br />Z <br />W <br />� <br />0 z <br />WU_ o <br />J <br />mQW W <br />vF-2:Noo <br />�} <br />V <br />rl <br />�O z r z¢ V <br />zrQOE¢ <br />r-I <br />2¢ ¢ <br />�,z-wiz <br />0 <br />LDzokaw <br />�:5-5 o-' <br />rl <br />Oz0 <br />��w <br />O <br />� ■ � <br />W <br />J <br />J <br />2 <br />lfl <br />0 <br />l0 <br />Lq <br />Z <br />J <br />�$ <br />Boa <br />¢ z U <br />a <br />O <br />U LL, <br />NCao <br />o°WCF <br />za0®Zz <br />Z <br />� <br />1 <br />WWo�,o <br />a�J¢oQ� <br />oLy>2oa <br />W <br />z <br />LL <br />wn!wOLLz¢ <br />p <br />M <br />??QOQ <br />a�u`C1 <br />NNoza <br />J � Y w <br />aa�� <br />0 <br />LL <br />W <br />U <br />Z <br />Z <br />0 <br />g <br />SCALE <br />AS NOTED <br />PLOT DATE: 09 / 10 / 2011 <br />VERSION NO. <br />1.01 <br />JOB NO: 11-1260-1263 <br />SHEET NO. <br />SS <br />