Laserfiche WebLink
2x KNEE WALL OR PRE-ENG FLOOR <br />TR /- STRUCTURAL SHEATHING 11 <br />M USS, STUDS C& 24'O.C. w/ ATTACHMENT PER PLAN, GONT. <br />ETA16 @ 24- O.C. (MAX.)- THROUGH FLOOR SECTION <br />NOTE 2.4 VERTICAL INSTALLED 71GHT TO\ 2x FRAME WALL PER PLAN, <br />TOP AND BOTTOM CHORD * , C <br />(3)$d TOENAILS AT LOCATIONS NAONT.,2x,PIA *112116d <br />.07 <br />WHE E EMBEDDED STRAPS C <br />AND END GABLE TRUSS PANEL EDGE NAILING <br />VERTICAUS MISAUGNS. - - - - - - - - - FLOOR SHEATHING & <br />ATTACHMENT PER GEN. NOTES <br />TRUSS ERPLAN PANEL EDGE NAILING <br />PER ;�� <br />SHEATHING PER PLAN .. 2.4 BRACING MIN. IT -WIN <br />V LL, BOND BEAM A LENGTH w/(3)1 Od NAILS END <br />ALLI GABLE & MIN. (3) FLOOR TRUSS, <br />&VERT. REINF. PER PLAN <br />8' CMU WA BRACING SPACED MAX. W-W D.C. <br />rL0_1Y_1M Tw TO ""', —WIL, -.1f.- <br />LTM-010 <br />2x FRAME WALL I STRUCT RAIL SHEATHING & <br />=LPLAN <br />r <br />2x PLATE W/ (2)1 0 C: <br />S ,�l <br />ATTACHMENT PER PLAN, CONT. <br />FLOOR SHEATHING & ATTACHMENT <br />THROUGH FLOOR SECTION... <br />PER GENERAL NOTES <br />TRUSSIJOIST <br />PANEL EDGE NAILING <br />PER PLAN <br />N <br />BEAM/GIRDER PER PLAN <br />PANEL EDGE NAILING <br />... NO TE: ILO CONT. WALL SHEATHING <br />SHEATHING PER <br />INSTALL LSTA1 5 STRAP EA STUD. <br />PLAN <br />CORNERS & FLANIUNG ALL OPENINGS. <br />CENTER STRAP AT TOP OF .IRDER <br />CMNECnON AT BUM <br />11/0M023 <br />�2MW <br />�YNOT <br />TO SCALE <br />2x FRAME WALL PER PLAN, CONT. 2x <br />STRUCTURAL SHEATHING & <br />2x FRAME WALL PER PLAN, OONT. <br />2x FRAME WALL PER PLAN, CONT <br />PLATE W/ (2)1 Sd NAILS 0 EA TRUS. <br />ATTRACHMENT PER PLAN, COrrT <br />Zx PLATE wl (2)1 Sd NAI I'S 111 "' 0 C- <br />.1.....N -1 (2) 10d NAILS @ EA. <br />2x PLATE wl (2)1 6d NAILS 61 O.0 <br />FLOOR SHEATHING & ATT,I ,.ME.T <br />,C <br />T OUGH FLOOR SECTION <br />PANEL EDGE NAILING <br />FLOOR SHEATHING & A 'TTACHMENT <br />T.0 <br />FLOOR SHEATHING & ATTACHMENT <br />LSTA1 2 9 EA. TRUSS VERTICAL, <br />PER GENER�L NOTES <br />IL <br />(4) led NAILS RIBBON TO EA, <br />PER GENERAL NOTES <br />COUPLING NUT, OR THREADED <br />PER GENERAL NOTES <br />BEND @ BOTTOM PLATE <br />TRUSS, TYP TOP & BOTTOM <br />ROD CU T TO LENGTH <br />FIELD FRAME 2X4KNEE WALL <br />Bd NAILS WO.C. WALL <br />OR PRE-ENG FLOOR TRUSS, <br />SHEATHING TO EA <br />STUDS C& 24' D.C., TOE NAIL <br />TRUSS END LEG <br />L <br />BOTTOM PLATEiCHORD w) <br />PANEL EDGE NAILING <br />1 Od NAILS @ 6- D.C. <br />TRUSS PER PLAN <br />P <br />META16ANCHOR <br />LS 15 @ EA. VERTICAL, BEND <br />SHEATHIN-G <br />@ EA.TRUSS <br />TRUSS PER PLAN (2)1. <br />TRUSS JOIST PER PLAN <br />0 BOTTOM OF TOP PLATE <br />PER PLAN <br />LAN <br />MU ... BOND SEAM <br />TOE NAIL TO P <br />TZ14 <br />SHEATHING <br />'T 2 <br />1/2' ALL -THREAD 0 32- <br />O.C. C& ALL CORNERS AND <br />SHEATHING PER PLAN <br />2x FRAME WALL PER PLAN <br />& VERT. REINF. PER PLAN <br />ftARAM101ALIOM1111110111 <br />- <br />11�0.1f.23 <br />FLOOR TRUSSIJOIST TO FRAME WALL 11/30/2023 <br />FLTR TRUSSIJUST TO FRAME WALL <br />w, <br />rR�11TW.SSMIM11WALL <br />LO'2) <br />R <br />rLO3� <br />�1.,f <br />\__/NOT TO SCALE <br />LTM-020 <br />MC0-RB(L&;`D-) <br />LGW-030 <br />2x FRAME WALL PER PLAN, <br />STRUCTURAL SHEATHING & <br />2x FRAME WALL PER PLAN <br />6d <br />CONT. 2x PLATE w/ (2)16d <br />W/ (2 <br />ATTACHMENT PER PLAN, CONT. <br />60 C <br />NAILS @ 16. O.C. <br />THROUGH FLOOR SECTION... <br />HOLD DOWN CONNECTION PER PLAN <br />FLOOR SHEATHING & <br />w/ ANCHOR BOLTS OR EPDXY ANCHOR <br />ATTACHMENT <br />w/6` MIN. EMBED. (EXPANSION BOLTS <br />4PER <br />GENERAL NOTES <br />TRUSS / JOIST <br />PANEL EDGE NAILING <br />ARE NOT ALLOWED) <br />2x BOTTOM PLATE PER PLAN <br />PER PLAN <br />ER PER PLAN <br />2x BLOCKING @ EA. BRG. <br />SHEATHING <br />PER PLAN <br />PANEL EDGE NAILING <br />�64 <br />STUD PER PLAN AS SHOWN <br />.. NOTE: <br />- <br />PRE-ENGINEERED <br />ILO CONT. WALL SHEATHING INSTALL <br />L' <br />_ <br />USSIJOIST PER PLAN <br />T R6SS/JOIST <br />U CONNECTION TO <br />S <br />LSTAIS STRAP EA STUD, CORNERS & <br />8'CMU WALL, BOND BEAM & <br />SEAM <br />F�LANKING ALL OPENINGS. CENTER <br />VERT. REINF. PER PLAN <br />PER MANIL .. <br />STRAP AT TOP OF BEWGIRDER <br />CONNECTION AT BEN <br />NG SMOS TO BMD BW DETAIL <br />(�j,�,2'-STORY <br />11/01/2023 <br />2128/2022 <br />NOT TO SCALE <br />�Z_080 <br />L;;Z60 <br />2x4 LEDGER OR TRUSS TOP <br />CHORD W (2)12d NAILS TO EA 2x4 LEDGER OR TRUSS TOP <br />STRUCTURAL SHEATHING & WALL STUD (MAX. 16' D.C.) CONT 2x4 BIL CKINGAFDG STRUCTURAL SHEATHING & CHOP /(2)12dNAILSTOEA <br />D <br />ATTACHMENT PER PLAN, CONT. STIR CTURAL SHEATHING ATTACHMENT PER w' (3)(d EA WALL STUD (MAX. Is- O.C.) <br />M PLAN, CONT. NAILED TO EA TRUSS THROUGH FLOOR SECTION <br />THROUGH FLOOR SECTION & ATTACH ENT PER PLAN THROUGH FLOOR SECTION N STRUCTURAL SHEATHING <br />U STRUCTURAL SHEATHING & .1 (3) -Od @ STUD & TOE ATTACHMENT PER PLAN, CONT. <br />2x FRAME WALL PER PLAN, CONT 2x FRAME WALL PER PLAN CONT STRUCTURAL SHEATHING 2x FRAME WALL PER PLAN & ATTACHMENT PER PLAN <br />FLOOR SHEATHING & ATTAC & ATTAC I HMENT PER PLAN CONT. 2x PLATE 2)lid <br />2� PLATE w/ (2)16d NAILS C& Is- O_C� 2x PLATE w/ (2)16d NAILS @ is' O.C: NAILS @ E�/T(IRUSS <br />PER GENERAL= FLOOR SHEATHING & ATTACHMENT CONT. 2x4 RIBBON <br />PER GENERAL NOTES MFLOOR SHEATHING & <br />I — I — I ATTACH ENT PER GEN. NOTES <br />z z z z Lj �Iz � z z2t j __jRI NI I L - - z z f I % z z z z <br />TRUSS PER PLAN PRE-ENG ROOF TRUSS PER <br />Px KNEE WALL OR MANLI STRAP PER PLAN <br />PRE-ENG TRU9S PER PLAN TRUSS BOTTOM CHORD OR 2x LEDGER <br />T EA7 <br />2.=PW OR <br />PRE-ENG TRUSS PER PLAN <br />TOP CHORD BEARING <br />PRE-ENG ROOF TRUSS PER <br />MANUF., STRAP PER PLAN <br />% <br />TRU ER TRAF P " <br />LAN RE;UN. ROOF TRUSS PER <br />S. ' P� \�MA �UF EF <br />ST., ;F PLA, <br />j <br />8,� CMU WALL,BOND BEAM 10d NAIL TO EA VERTICAL & TO <br />8'CMU WALL, BOND BEAM <br />(2) 2x6 LEDGER wl 1/4" x 5� <br />CONT. 2.4 RIBBON TRUSS BOTTOM CHORD OR <br />& VERT. REI F. PER PLAN BOTTOM PLATE/CHORD @ 16`O.C. <br />& VERT. REINF. PER PLAN <br />SOS SCREW TO EA TRUSS <br />2x LEDGER Dd NAIL <br />VERTICAL & TO BOTTOM <br />PLATE/CHORD @ B'O.C. <br />_ .." wl (2)1 <br />B'CMU WALL, BOND BEAM TO CONT. RIBBON 9 1 V O.C. <br />& VERT. REINF. PER PLAN <br />"NOTE: <br />NOTE: <br />DETAIL L01 IS REQUIRED TO ACCOMPANY THIS DETAIL <br />DETAIL L01 IS REQUIRED TO ACCOMPANY THIS DETAIL <br />DETAIL L02 IS REQUIRED TO ACCOMPANY THIS DETAIL <br />TO �W"f ff �WXI @ IN �RV <br />FLOOR TO MASONRY WALL @ LOW ROOF 2128/2022 <br />FLOOR TO MASONRY WALL @ LOW ROOF 12J1712021 <br />&NO;TOSCALE <br />\_,/NOT TO SCALE LTM-110 <br />SCALE <br />20 <br />�;;7130 <br />STRUCTURAL SHEATHING & <br />ATTACHMENT PER PLAN, COW. <br />STRUCTURAL <br />2�4 BLOCKING BETWEEN EA <br />THROUGH FLOOR SECTION <br />VA <br />CONT. 2X4 BLOCKING/LEDGER <br />SHEATHING <br />TRUSS (OR CONTINUOUS AS <br />2x FRAME WALL PER <br />W �LE)lDd @ EA STUD & TOE <br />NA To EATRUSS <br />CONTINUOUS <br />TRUSS ALLOW) /(3) 10d TOE <br />IN IL TO <br />PLA <br />(AN, CONT. 2� PLATE W <br />2),6d NAILS C) 16' O.C. <br />W <br />__ <br />BEAM/GIRDER PER PLAN <br />fj <br />STRUCTURAL SHEATHING <br />& ATTACHMENT PER PLAN <br />CO <br />EDGE NAILING PER <br />FLOOR SHEATHING & <br />' SHEATHING & <br />'LA <br />P�R PLAN <br />DETAILS <br />AUSSES <br />ATT'ACHMENT <br />ACHM PER <br />G RA TES <br />ENERAL No <br />EDGE NA <br />! <br />7 <br />SHEATH ING <br />L k, <br />Fieldstone <br />TRUSS JOIST <br />A BIDS 9 <br />EA'TxRUSS <br />#3 <br />PLA <br />TRUSSNOIST PER PLAN <br />OST <br />PRE -ENG ROOF TRUSS PER <br />SHEATHING <br />PER PLAN <br />PER PLAN <br />HTU26 OR <br />C.O.A.# ARCHITECURE: <br />SHEATHING PER PLAN <br />MANUF., HTU26 OR HANGER <br />PER MA NF, U.N.O. <br />U <br />BEAM OR <br />HANGER PER <br />AA26002802 <br />z <br />EDGE NAIL SHEATHING <br />FLOOR <br />TRUSS <br />-NOTE: WA <br />TOTHE WHTINGIVE <br />C.O.E.# ENGINEERING: <br />GIRDER <br />BEING CONTINOUS TO THE <br />BEAM BELOW IS TO USE LSTAI 2 <br />29349 <br />... NOTE: <br />@ EA STUD ABOVE TO BEAM <br />13 IBRAHEM E <br />ILO CONT. WALL SHEATHING INSTALL LSTA15 STRAP <br />BELOW <br />Z: <br />EA STUD, CORNERS & FLANIONG ALL OPENINGS. <br />P.E.# 91476 <br />CENTER STRAP AT TOP OF BEAMiGIRDER <br />0 BENJAMIN NIESE, PE <br />E <br />2 CONNECRON AT BEAM 8118/2022 <br />2- STORY CONNEM AT BEAM W/ LOW ROOF MOD (511=022) <br />Ax <br />L16 <br />L18 <br />P.E.# 86025 <br />10:, to <br />NOT TO SCALE <br />LGG-160 <br />OT TO SCALE <br />LGG-184(IE-450) <br />06/20/2024 <br />DATE <br />AU <br />1111W <br />2 E <br />21 15 <br />Z; <br />E, <br />Z <br />P 2 E s <br />Michigan <br />3400 Auburn Rd <br />Suite 200 <br />Auburn Hills, MI 48326 <br />+1 248.622.4035 <br />Florida <br />12906 Tampa Oaks Blvd. <br />Suite 150 <br />Tampa, FIL 33637 <br />+1 813.466.3310 <br />www.fieldstoneae.com <br />I-- <br />C) <br />z <br />0 <br />> <br />U <br />7 <br />_j <br />DRAWN BY: � =FAE <br />[**N: 5._Oj <br />SHEET NAME <br />DETAILS <br />FLOOR <br />SHEET # <br />S4.3 <br />