Laserfiche WebLink
CONVENTIONAL FRAMING SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS, <br />2' X 4' 'a 16" O.G. <br />1'-5' <br />(2) 16d TOENAILS <br />2' X 6' 6 16' O.G. <br />10'-8" <br />(2) 16d TOENAILS <br />2' X 8" 6 16" O.G. <br />13'-9" <br />(3) 16d TOENAILS <br />2" X 10' Q 16" O.G. <br />16'-5° <br />(1) USP HTW20 OR (3) 16d TOENAILS <br />2" X 12' 9 16' O.C. <br />19'-3" <br />(1) USP HTW20 OR (4) 16d TOENAILS <br />2' X 4" e 24' O.C. <br />0 -11, <br />(2) 16d TOENAILS <br />2' X 6' S1 24" O.G. <br />8'-0 <br />(2) 16d TOENAILS <br />2" X 6" -1 24' O.G. <br />III -Oil <br />(2)16d TOENAILS <br />2" X 10' e 24" O.C. <br />13'-0' <br />(3) 16d TOENAILS <br />2' X 12' @ 24' O.G. <br />15'-4' <br />(1) USP HTW20 OR (3) 16d TOENAILS <br />TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />.. SOUTHERN YELLOW PINE, 55 PSF LOADING <br />COMPONENT & CLADDING DESIGN PRESSURE <br />(120mph, enclosed, 3 sec. gust, 2.1/12 to 6.9/12 pitch, Exposure C, Height = 30 feet, Importance Factor= 1.0) <br />TRIBUTARY AREA (ft2) <br />ROOF <br />WALL <br />ZONE 1 <br />ZONE 2& 3 <br />ZONE 4 <br />ZONE 5 <br />10 <br />20.9 <br />-33.2 <br />20.9 <br />-70.1 <br />36.3 <br />-39.3 <br />36.3 <br />-48.6 <br />20 <br />19.0 <br />-32.2 <br />19.0 <br />-63.6 <br />34.6 <br />-37.7 <br />34.6 <br />-45.4 <br />50 <br />16.7 <br />-31.1 <br />16.7 <br />-55.0 <br />32.5 <br />-35.6 <br />32.5 <br />-41.0 <br />100 <br />14.7 <br />-30.1 <br />14.7 <br />-48.6 <br />30.8 <br />33.9 <br />30.8 <br />-37.7 <br />125 <br />14.7 <br />-30.1 <br />14.7 <br />-48.6 <br />30.8 <br />-33.9 <br />30.8 <br />-37.7 <br />Notes: 1 For effective areas or w ind speeds betw een those given above the load <br />may be interpolated, otherw ise use the load associated w ith the low er effective area. <br />2 Table values shall be adjusted for height and exposure by multiplying by adjustment <br />coefficients in Table R301.2(3) of the Florida Residential Code 2007 <br />3 Flus and minus signs signify pressures acting toward and away fromthe building <br />surfaces <br />UPLIFT CONNECTION CRO55-REFERENCE <br />USP STRUCTURAL CONNECTORS <br />SIMPSON STRONG -TIE <br />CONNECTOR <br />UPLIFT <br />CAPACITY <br />LATERAL <br />CAPACITY <br />FASTENERS <br />CONNECTOR <br />UPLIFT <br />CAPACITY <br />LATERAL <br />CAPACITY <br />FASTENERS <br />MASONRY APPLICATIONS <br />MASONRY APPLICATIONS <br />HTAI6 <br />1500 <br />590 <br />13-10d x 1 1/2' <br />METAI6 <br />1450 <br />335 <br />1-10d x 1 1/2' <br />HTA20 <br />1500 <br />590 <br />13-10d x 1 1/2' <br />META20 <br />1450 <br />335 <br />1-10d x 1 1/2' <br />HTT16 <br />4290• <br />18-16d <br />HTT16 <br />3955• <br />-- <br />18-16d x 2 1/2' <br />HTT22 <br />5310, <br />-- <br />32-16d <br />HTT22 <br />4165• <br />-- <br />32-10d <br />LUGTZ <br />1850 <br />__ <br />16-10d 4 5-1/4'x3' <br />Wedge bolts <br />LGT2 <br />2150 <br />_ <br />16-Ibd Sinkers 4 1- <br />1/4'x2 1/4' Titen <br />L5T19 <br />1390* <br />-- <br />8-10d <br />LTTI9 <br />1350. <br />- <br />8-16d 5inker5 <br />LTT131 <br />2650, <br />-- <br />I6-10d x 1 112' <br />LTT131 <br />2310, <br />- <br />I6-10d x 1 1/2' <br />FRAME APPLICATIONS <br />FRAME APPLICATIONS <br />RT1 <br />585 <br />110 <br />10-8d x 1 1/2" <br />H2.5 <br />415 <br />150 <br />10-8d x 1 1/2" <br />RT16 <br />1030 <br />645 <br />16-8d x 1 1/2' <br />H10 <br />995 <br />285 <br />111 x 1 1/2' <br />RT16-2 <br />1030 <br />390 <br />16-8d x 1 1/2' <br />H10-2 <br />160 <br />395 <br />12-10d <br />5FT22 <br />115 <br />260 <br />8-10d <br />SPI <br />585 <br />-- <br />10-10d <br />SPT24 <br />1015 <br />260 <br />12-10d <br />51=2 <br />1065 <br />1 <br />12-10d <br />5P74 <br />885 <br />-- <br />6-10d x 1 1/2' <br />5P4 <br />885 <br />- <br />6-10d x 1 1/2' <br />5PTH4 <br />1130 <br />- <br />12-10d x 1 1/2' <br />5PH4 <br />1360 <br />- <br />12-10d x 1 1/2' <br />MUGT15 <br />3965 <br />22-10d <br />MGT <br />3965 <br />22-10d <br />LUGT2 <br />2260 <br />-- <br />32-10d <br />LGT2 <br />2050 <br />30-16d Sinkers <br />PTUU20 <br />1530 <br />95 <br />20-10d <br />14T520 <br />1450 <br />- <br />20-10d <br />MSTAIS <br />1215 <br />- <br />14-10d <br />L5TA16 <br />1165 <br />- <br />14-10d <br />MSTA24 <br />1305 <br />- <br />I0-10d <br />L5TA24 <br />1235 <br />- <br />18-10d <br />MSTA30 <br />1635 <br />22-10d <br />LSTA30 <br />1640 <br />- <br />22-10d <br />MSTA36 <br />1635 <br />22-10d <br />LSTA36 <br />1640 <br />- <br />24-10d <br />HUNG APPLICATIONS <br />HUNG APPLICATIONS <br />HUS26 <br />1925 <br />20-16d <br />HU526 <br />1550 <br />-- <br />20-1601 <br />THDH26-2 <br />2605 <br />30-1(od <br />PGUS26-2 <br />2325 <br />- <br />28-16d <br />HUS28 <br />2510 <br />- <br />30-16d <br />HUS28 <br />2000 <br />30-1(od <br />THDk1210-2 <br />3910 <br />- <br />58-1601 <br />HGU528-2 <br />3220 <br />- <br />48-16d <br />CAPACITY IS BASED ON CONCRETE EMBEDMENT, REFER TO MANUFACTURER FOR GROUT FILLED CMU <br />NOTES <br />1) CONNECTOR CAPACITIES ARE FOR SYP, REFER TO MANUFACTURERS FOR ADDITIONAL <br />INFORMATION <br />2) DO NOT DRIVE NAILS THROUGH THE TRUSS PLATE ON THE OPPOSITE SIDE OF THE TRUSS, WHICH <br />COULD FORCE THE PLATE OFF THE TRUSS. <br />"J" BOLTS REPLACEMENT CHART <br />THE FOLLOWING 'J' BOLTS CAN BE REPLACED WITH THE CORRESPONDING <br />BOLTS, THE REVERSE IS NOT APPLICABLE. FOR FRAME TO SLAB APPLICATION ONLY. <br />NOTE: EXPANSION BOLTS NOT RECOMMENDED 51 CONC. STEP <br />"J" BOLTS <br />EXP,4N5I0N BOLTS <br />5/S"0x�o" <br />5/5"�x6"MIN. <br />5�a X 10" <br />Sib " O x 10" MIN. <br />MIN. EMBEDMENT <br />5GHEDULE FOR <br />E AND QUANTITY <br />OF FA5TENERS <br />T,I'1=ICAL HTA 20-10 / HTA 20 <br />INSTALLATION <br />LL, <br />1 <br />RC,ICIF DIAE'��Rc' Pv1 11.<',IL IP=1;HEC%L.ILE <br />�InTF I II !F <br />+ + <br />+ <br />+ + <br />+ + + + + + + + + <br />+ + + + + + + + <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + + + + + + + + + + + + + <br />- + - <br />+ + <br />+ <br />+ + <br />+ <br />+ <br />+ + <br />+ + <br />+ + <br />-- <br />+ <br />+ <br />+ <br />- --- <br />++ <br />+ + <br />+ + <br />++ - -� <br />+ <br />+ <br />+ 1c <br />+ <br />+ + <br />+ + <br />++ <br />+ + <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+++ <br />+++ <br />+ <br />+ + + + + + + + <br />+ <br />+ + + + + + + + + + + + <br />+ + <br />+ + <br />+ + + + + + + <br />+ + <br />+ + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + y <br />+ <br />+ + + + + + + + + + + + <br />+ + <br />+ + <br />+ + + <br />+ + <br />+ + + + + + + <br />+ <br />ol <br />r "15L1 �I. P z <br />PL <br />LINE <br />120 MPH 5 SEGOIAD C=711)5T EXP05UP-E "G" F l�l D ZONE 120 MPH SEC ACID I_I T EXP05URE "G" <br />/FC;R <br />,�d I lJ cHAPdK NAILS i" O.G. & d INL; `=HAIL K. 117-1L d, e F_ E`_' 4 <br />+ + 4' O.C_ -a-, FABLE END h1ALL OR CABLE TRU55 d RIND =HAIL, 11AIL Cl U 1'1TERMEDIATE <br />CJ.li3 INCH NOMINAL 5HANK DIAMETER 0.113 INCH N JMIFIAL `HANi D1^.M TER <br />RIMS DIAMETER OF 001l2 C.)VER SHANK PlAFIETERRING DIA11E1EF= LVFP hµNF� C I METER <br />I�, Tr RINDS PER INCH I� TI111 T �' R5PE <br />0.2�_ IIC,H FULL ROIJR,1D HEAD D 4,'�IETER � �� dLH rULL P__'I HE_' L- EF' <br />II,_-t4 1'1AIL LENC;.TH 1F;r_H NAIL LLld�-rH <br />(FOR TILE) FOR TILE% <br />Od RIN1� SHANK NAILS @ 6" OC 1 4" ENABLE EFdD Od RCE, SHA'1K t,dAIC co) bED5F" 4 <br />6�.ALL OR SABLE TRU55 Ic �d RIN1� HAN _NAILS r NTERr EF F <br />fd :,I�IINA� BHA IK DIF IE IEt2 11 iPl.,' � I C' IP1L.H Il F 111;�L HA11F IAI TEr ('ll'.% <br />z, _ I.-r-1ETER OF C'IAMETER if�11PdJ ,1r1�= C'�<�.h^E 1E� '.�F _ .��I� EF' _ Id<; C1 A1­1E P 111+' <br />T 2O PIH(I�5 PEP III,-H )hII11) TC) r__IN(-3 PE 11'�- T iPi1 <br />INCH FULL HEAL) D AHETEE' iMl ,U '1.�8L r1CH FULL HEAP :7. Al 1ET-LR <br />3 INCH NAIL LENL'-7TH T 111CH NAIL LEr1r5TH <br />NOTE: <br />SEE TR'I''GTI_!f:�'.<-.L N(DTE5 FOi� SHE-r.THIN( -'F ECCIFI; ATIGi1_ PiL�) I ,IIiEI-EE. <br />ENC JOII'dTS O`= THE ROOF --HE T !i1G SHALL DE =�T 11 EF -' I ![ L;�_:-: I_��- :� ';�E �� _,'<.NIli l': F" ,E <br />B) SCHEDULE DIRECTLY TO 501iTHERP! FIR TR BETTER. <br />Ir ROOF F=RAKNG� CONSISTS OF A LE55ER OF LUr,IE'>ER, GOPdTRAC70R MUST �,ONTACT D �N=�I_:T� ENO,IIIEERIhd�.. <br />LLC FOR ALTERNATE FOR NAILING: PATTERN. <br />MAINTAIN BOTTOM OF <br />WEEP SCREED <br />1 1/2' TO 2' ABOVE <br />ROOF SHEATHING <br />NOTE <br />THAT THE <br />T1'VEK <br />AND <br />METAL <br />LATH <br />MUST CEO <br />OVER THE <br />TOP OF <br />THE WEEP <br />SCREED <br />CEMENT PLASTER <br />IN ACCORDANCE <br />WITH ASTM0926 <br />OVER WOOD 2ND <br />FLOOR <br />CEMENT PLASTER <br />OVER BLOCK 15T <br />FLOOR <br />- Ye' CEMENT PLASTER <br />IN ACCORDANCE WITH <br />ASTMC926 <br />FELT BACKED METAL <br />LATHE IN ACCORDANCE <br />WITH ASTMCI063 <br />� TYVEK <br />SHEATHING <br />METAL <br />FLASHING <br />'055' UNPERFORATED <br />FLANGE Ye' WEEP <br />SCREED <br />VULCLIM <br />CAUK <br />BOTTOM <br />JOINT ONLY <br />ALL N51DE AND <br />OUTSIDE CORER <br />WILL NEED TO BE <br />MITER CUT. ALL <br />JOINT5 NEED TO BE <br />CAULKED USIWs <br />VULCUM CAULK <br />' CEMENT/ KEEP TOP EDGE <br />PLASTER FINISH OF WEEP SCREED <br />2' ABOVE TOP OF <br />BLOCK <br />Y2 ' CEMENT <br />PLASTER FINISH <br />PERFORATED \ <br />FLANGE i ' WEEP <br />SCREED <br />INSTALL BOTTOM <br />EDGE OF WEEP <br />SCREED 1' BELOW <br />FINISH FLOOR <br />WEE' 5C�EED DETAIL <br />T''PICAL t-ITIU INSTALLATION <br />\,___J� BLOCK <br />SLAB <br />Ti'FICAL �JS INSTALLATION <br />A <br />5N <br />B <br />SNI <br />(OPT.) <br />USP <br />MUC- <br />THRU <br />BOLT <br />U5 <br />ML <br />:R TRUSS <br />TOP PLATE <br />U.G <br />Tr F1 CA L JSf 1 IIUGT1E TO <br />5UILT=JF COLUMN DETAfL <br />HTA 20-18 / �4T,4 20 <br />INSTALLATION MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />15 BASED ON <br />5.P.F. <br />J5P RT 16 U51 NC <br />16-8d xI 1/2" NAILS <br />JPLIFT = 1030# <br />T�'FICAL ST1re INSTALLATION <br />USP SPT24 AT <br />EACH JOINT TYP. <br />z <br />Q <br />Q <br />z <br />z cn <br />Q <br />==) <br />z� <br />3�:Q <br />w <br />z= <br />oI <br />eCD <br />D <br />GALV. METAL <br />o <br />FLASHING <br />N `- <br />to <br />Do--) <br />CRICKET <br />SECTION ",4-,4" <br />DRE-FAB CHIMNEY CAP <br />-LASHING <br />2"0" BLOCKING (SEE MANUF. <br />SPECS. FOR MINIMUM DISTANCE) <br />XTERIOR FINISH <br />RE-FAB CHIMNEY <br />BLOCKING @ MID POINT <br />WHEN CHIMNEY EXCEEDS 6'-0" <br />IN HEIGHT <br />1/2" SHEATHING OR O.S.B. <br />2%4" STUDS @ 16" O.C. MAX. <br />V. MTL. FLASHING <br />TRUSS TOP CHORD <br />`--USP HTW20 @ EA. CORNER <br />DOUBLE 2"x4" BLOCKING <br />w/ 1 /2" PLYWOOD FLITCH <br />SCALE: 3/4"=1'-0" <br />.3r2' MAX <br />ATTACH BLOCKING-� <br />TO TRUSSES w/ USP USP HTW20 @ EA. CORNER <br />SLOPE <br />MP-34 ANGLE TYPICAL -; <br />j PRE-ENGINEERED WOOD TRUSSES <br />PRE-FAB CHIMNEY ASSEMBLY <br />/CRICKET <br />T, <br />TT'1=IC,4L C441t-INE7' FLAN <br />I('� <br />SCALE: 3/4"=1'-0" <br />_LI <br />01 <br />GONT. #B } <br />�.�-�!111111!111 <br />@ 16" O.C. MAX. <br />2"x4" BLOCKING w/ <br />2 PLYWOOD FLITCH TYP. <br />STD. CIO() BOND BEAM <br />FILL CELL HOOK <br />STD. GO° <br />HOO< <br />GONT. #5 <br />BAR <br />#5 GONT. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />50ND 5 ,4 1 STE F <br />5GALE: N.T.S. <br />I T r' I C, /! L H I t®" 1 <,41-11 N(.:z L.,) t 1 ,41 L< <br />SCALE: N.T.S. <br />DANSCO <br />ENGINEERING, LLC <br />P.O. BOX 3400 <br />Apollo Beach, Florida 33572 <br />p. 813.645.0166 <br />f. 813.645.9698 <br />www.danscoengineering.com <br />o <br />N <br />Lu <br />0t-.o <br />7)_tA <br />z <br />�peMO <br />Q0LL <br />' <br />aw rn <br />zHQ <br />Q= <br />rCo� <br />W <br />w U <br />JLn <br />Ln <br />Ln <br />LLJ <br />I <br />V) <br />I..L <br />Q <br />Z <br />Q <br />Q0 <br />TO THE BEST OF THE ENGINEER'S KNOWLEDGE AND <br />BELIEF. THE STRUCTURAL PLANS AND SPECIFICATIONS <br />COMPLY WITH 2O07 FLORIDA RESIDENTIAL BUILDING <br />CODE (INCLUDING 2009 SUPPLEMENT), SECTION <br />R301 FOR 120 MPH. 3 SEC. GUST. EXPOSURE "C" <br />ENCLOSED (INTERNAL PRESSURE COEFFICIENT = i0.18) <br />WIND ZONE, <br />THIS DRAWING AND DESIGN IS VALID FOR 12 MONTHS <br />AFTER THE DATE IT IS SIGNED AND SEALED. <br />SIGNED AND SEALED FOR THE STRUCTURAL PORTION <br />OF THIS DRAWING ONLY. <br />02011 LENNAR CORP.-THIS PLAN MAY NOT BE <br />REPRODUCED IN ANY MANNER WITHOUT WRITTEN <br />CONSENT FROM LENNAR CORPORATION, <br />02011-THESE DRAWINGS AND DESIGNS ARE THE JOINT <br />PROPERTY OF DANSCO ENGINEERING, LLC AND THE <br />CLIENT ON THIS PROJECT. ANY REPRODUCTION OR <br />UNAUTHORIZED USE IS PROHIBITED. <br />REVISION: <br />DATE <br />DESCRIPTION <br />02.02.09 <br />1.0 2007 FBC UPDATES <br />10.29.09 <br />1.01 FFPC 2007 UPDATE <br />05.07.10 <br />2 00 GP FIREWALLS <br />07.28.10 <br />3.00 ADD ALT. ROOF <br />SHEATHING FOR TILE ROOF <br />1 1.12.10 <br />4.00 ADD STEM WALL DETAILS <br />0420.11 <br />4.01 REVISED NON -DROP <br />ABLE DETAIL <br />VERSION NO. 4.01 / 04.20.11 <br />CA 25948 <br />SAMUEL A. GREENBERG, <br />P.E. #34245 <br />THUY H. HUYNH, <br />P.E. #60122 <br />IRWIN J. BENSON, <br />P.E. #49758 <br />��gA.aa�a�assaFa <br />♦0 ,. , AL: <br />N <br />P <br />I\tic. 60122 <br />C? <br />oee0.4♦♦ <br />4,1311erIA� ie a <br />SHEET TITLE: <br />STRUCTURAL NOTES <br />& D ETA I LS <br />SHEET INFORMATION: <br />JOB NO.: 290127 <br />DATE ISSUED: 03.09.1 1 <br />DRAWN BY: DZ <br />REVIEWED BY: TH/AS <br />SNI <br />r <br />Q0 <br />I <br />O <br />M <br />r <br />Ln <br />T <br />