My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6659 Paden Wheel St
Zephyrhills
>
Building Department
>
Building Plans
>
6659 Paden Wheel St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 2:10:28 PM
Creation date
2/27/2025 11:28:15 AM
Metadata
Fields
Template:
Building Plans
Street #
6659
Location
Paden Wheel St
Contractor
Lennar Homes
Building Plans - Permit #
19366
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOORJAMB (REFER 1X4 1/2" DRYWALL <br />MB (RE <br />1/2" DRYWALL DOOR JAMB REFER <br />DOOR JAMB (REFER 1 X 4 ( <br />1 X 4 F112" DRYWALL <br />J_ <br />UNACCEPTABLE INSTALLTION <br />TO SHT. 1 P.T. <br />TO SHT. SDW2-K1 TO SHT. SDW2-K1 <br />FOR CONN. DETAILS <br />PROPER INSTALLATION MAX. $ DO NOT DO THIS <br />2"x BOT. PLATE W/ 2 10d 6" O.C. <br />() @ <br />FOR CONN. DETAILS)tu\l <br />FOR CONN. DETAILS <br />1 X 4 <br />1 X 4 <br />#5 REBAR (TYP,) <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />X 4 <br />3-114" LONG X 3/16" 0 FURRING <br />3/16" 0 X 3" LONG FURRING 3/16"QJ X 3-1/2" LONG <br />FURRING <br />#5 REBAR <br />AND NAILED W/ 8d COMMON <br />6" O.C. EDGES AND <br />2X BOTTOM PLATE W/ 8d @ 4" <br />O.C., 2 ROWS STAGGERED <br />TAPCON. INTO <br />TAP NS TAPCONS STAGGERED <br />2X8 <br />(TYP,} <br />I <br />12" O.C. FIELD <br />BLOCK@ SPACING 1� <br />1 DETAIL <br />STAGGERED @ 16" 1X8 P.T. STAGGERED @ 16" O.C. <br />O.C. 2-ROWS INTO <br />2-ROWS INTO <br />1X8 <br />PER MANUFACTURE <br />MASONRY THROUGH 1-1 /211 DETAIL MASONRY THROUGH 1� <br />3 DETAIL <br />STD. 90A <br />D. 90° HOOK (TYP.) <br />2x BAND JOIST W/ FACE NAIL 10d <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. 1x8 P.T. & 2x8 P.T. <br />FILL SOLID <br />BOTH CELLS <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />1 <br />WEB <br />3/16" x 3 -1/2" <br />TAPCON @ 16" <br />1X4 P.T. <br />I/ <br />/ <br />METAL SEAT PLATE <br />O.C. & 4" FROM <br />EACH END W/ MIN <br />3/16" x 3 -1/2" DOOR JAMB (REFER <br />TAPCON TO SHT. SDW2-K1 FORLil <br />1 X 4 1/2" DRYWALL <br />NOTE: <br />LAP SHEATHING TO <br />DOOR JAMB (REFER <br />DOOR JAMB (REFER <br />TO SHT. SDW2-K1 2" EDGE DIST. <br />TO SHT. SDW2-K1 CONN. DETAIL <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS 10d @ 12" O.C. <br />1 X 4 <br />FURRING <br />rW..AS <br />2X8 P.T. WITH 3/16"QJ X 3" <br />+2 <br />NOTC @ FIRST COURSE <br />USP HGAM10 @ 12" O.C. w/4-SDS <br />REQ'D <br />2X8 P T LONG TAPCONS <br />STAGGERED @ 16" O.C. <br />2X8 <br />- <br />1/4x1 1/2" SCREWS INTO BAND <br />JOIST & (4) 3/16"x1-3/4" WEDGE <br />2x DETAIL <br />2 1/4" DETAIL 2-ROWS INTO MASONRY 3-1 <br />/4" DETAIL <br />NOTCH WEB AT THE <br />BOLTS INTO K.O. BLOCK <br />t5" <br />FIRST 2 COURSES <br />BUILDOUT OVER SIZE DOOR -WINDOW ROUGH OPENINGS rcC <br />CELL PER <br />SCALE: N.T.S. <br />FOULED <br />NDATION PLAN <br />FILLED CELL INSTALLATION <br />rH <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SS <br />SCALE: N.T.S. <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. <br />INFO SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />A -A <br />UPLIFT CAPACITY = 945 # FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />=1890 #FOR 2 STRAPS <br />FILL 1s14 COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX 2'-0" <br />8" <br />1-PLY PRE-ENGINEERED TRUSS <br />.4 SOLID w/GRour <br />1 X 4 FURRING — SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK <br />1/4" x 31/4" TAPCONS <br />„ 1 <br />USP RT16M W/ (8) NA11 NAILS & (6) a x 2j„ <br />BLOCK HEADER <br />TAPCONS <br />1/2" DRYWALL * <br />(IF TRUSS IS 2 PLY INSTALL USP HTWM16 W/ (6) <br />10d NAILS x *NAILS AND <br />„ <br />8d NAILS AT 8 O.C. AT BUCK <br />(4) J" X 1 t" WEDGE BOLTS [ (1) STRAP =1225 <br />2 x 8 45" DIAGONAL (4) 10d NAILS INTO <br />LEAVE A CUT OUT IN O.S.B. ON THE <br />(2) STRAPS 2450#]) <br />-4 ;. <br />BRACE(S) 2 x 8 BRACE/ BLKG. <br />INSIDE TO ALLOW FOR INSULATION <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />IN PLACE BEAM <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. " e'' . ' •• <br />SCRIBE (NOTCH) <br />FACE OF ARCH W/ (3)10d NAILS <br />' <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />OVERHAN <br />'. ° <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />•. <br />N.T.S. <br />�• <br />INSTALL WDW. SCREW ANCHO 2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />PROVIDE TAPCON WITHIN <br />INTO ARCH BLKG. PER ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 <br />4 MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />RETROFIT WALL OVERHANG DETAIL <br />(NTS) <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR <br />THRU <br />TRUSS AS SHOWN FOR O.H. UP TO Z-6" <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF <br />ARCH <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />* DOUBLE 2x4 SCAB FOR Z-6" TO 4'-0" O.H. <br />START OF ARC <br />IF TRUSSES USED) W/ (3) #6 X 4%" WOOD <br />NOTE: FOR OVERHANGS LESS THAN 3/4"- NO REPAIR REM. <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />X 0� (2)10d NAILS @ 8" O.C. <br />ERygN <br />ARCH DETAIL <br />i <br />WALL USE (3)1/4" X 31/2" TAPCONS AT 16" <br />TO TRUSS TOP CHORD <br />SCALE: N.T.S. <br />SS <br />O.C. 12 <br />+ CFNOry PLYWOOD SHEATHING <br />1 �-��� 5'-O" <br />JACK TRUSS PROVIDED BY SEE <br />+ + <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />+ + <br />+ <br />INISH FLO <br />2 x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ BLOCKING AS <br />WITH 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />is <br />EMBEDMENT INTO .) <br />PER NAILING SCHEDULE ALL <br />TO SUPPORT <br />° • '. <br />/4" MAX <br />2-0 8 <br />TRUSS + SOFFIT <br />+ <br />° • • ,.. .� ►.. <br />D <br />#5 BAR <br />BLOCK HEADER SOLID BLKG. AT TOP BTWN. ARCH <br />(5) -12d NAILS <br />+ <br />)0" a <br />4 e ° <br />CENTERED W/ <br />4 FURRING BLKG. & BUCK <br />1 X U G <br />2X6 TO 2X4 USP RT3A <br />2X4 SYP . • . <br />. P • . e .' '� H <br />IN TOP o <br />EACH TRUSS <br />s a . ' <br />KNOCKOUT / i4 <br />" ° <br />CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK 2 x 8 VERT. W/ (2)10d <br />. . <br />— <br />NAILS AT EA. END <br />PROVIDE 2 x 8 DIAG. BRACE B <br />PROVIDE (2) MIN. <br />TAPCON AT EA. SIDE <br />PROVIDE 2x <br />CONT. W/ (3) <br />CONNECTOR <br />p• <br />MONO FOOTING _ ° <br />SIZE AND REINF. PER PLAN — <br />VERT. BRACES WHEN HGT. OF <br />12d NAILS <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY <br />SEE LINTEL <br />SCHED. <br />AND SECTION DETAILS -I <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />° <br />2 x 8 VERT. BRACES) INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO IT <br />CLEAN FILL .> e o <br />6 <br />Z <br />TO BE INSTALLED <br />DIRT <br />BUILT UP PLWD. BUCK- <br />'-0" M EE PLAN <br />PRECAST LINTEL <br />.° • • ° STANDARD o <br />SCRIBE (NOTCH) BACKSIDE 7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />#5 BAR IN ° 99 <br />r <br />HOOK iv <br />TO FIT ARCH CONNECT W/ <br />START OF ARC <br />%" <br />IF TRUSSES USED) W/ (2) #6 X 4 WOOD <br />FOR OVER HANG <br />FILLED CELL — <br />8d NAILS 2 x4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />- <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL <br />WALL USE (2)1/4" X 31/2" TAPCONS AT 16" <br />'` <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />O.C. <br />° , , ° , , ' ° <br />.%. .► . .. .� . .-VK <br />ANCHOR INTO ARCH BLKG. <br />PER INSTALLATION DETAILS ARCH DETAIL K <br />SECTION ENTRY L <br />@ <br />SECTION ROOF EXTENSION <br />@ M <br />STEMWALL FOOTING SIZE AND <br />_ <br />B B <br />MONO TO STEMWALL FOOTING <br />REINF. PERLAN AND STEMWALL <br />SCALE: N.T.S. SS <br />SCALE: 3/4" =1'-0" SS <br />SCALE: 3/4" =1'-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" =1'-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: <br />IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />EXCEED <br />(3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />FOR ADDITIONAL <br />INSTRUCTION. <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />REINFORCING. PROVIDE LOWER <br />D SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />) <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 <br />DRILL 3/4"X6"MIN. HOLE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />HTT16 W/ (18) -16d NAILS TO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />STUDS & (1) - 518" DIA. ALL <br />COURSES TO PREVENT THE MORTAR FROM BEING SQUEEZED OUT. <br />1/4 EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />#5X6 EMBEDDED INTO <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL PER ANCHOR) <br />T #5 BARS IN. 3"CONTOCCURS <br />TOP WITH MIN. 3" <br />THREAD ROD EPDXIED MI <br />SIMPSON "SET' EPDXY MIN. <br />EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. THE SAME SPACING <br />( <br />REINFORCING <br />COVER 6'-0•� <br />5" EMBEDMENT & 3" MIN. <br />0 <br />(n <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />F F <br />EDGE DISTANCE <br />¢ <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) EXPANSION STRIP <br />v <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° <br />o <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />, ; o <br />w a <br />A <br />REINFORCING AS FOLLOWS: <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />z <br />g <br />5X6 EMBEDDED INTO <br />EXISTING FOOTING <br />2-#5X6' IN CONC. <br />F MORTAR BE AND TROWEL <br />COVER PANEL REINFORCING WITH UPPER HALF 0 0 R D 0 <br />REINFORCING PANEL <br />— <br />¢ _ <br />N <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />° p.° <br />DRILL 3/4 X6 MIN. HOLE <br />F Q PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />_ <br />GRADE o. •' a <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />,� <br />6 MIN. LAP <br />p ° <br />El <br />G SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />NOTE: <br />i.i ° <br />REMAIN FREE OF MORTAR. <br />SEE GLASS BLOCK INSTALLATION <br />NOTES. <br />C-4 <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />�> <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />° ° <br />,4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />\ ' (2) #5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS <br />BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN.Of COVER EA. WAY <br />A S ECTI O N <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />rDF`N�SECTIONAT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />_ <br />SS SCALE: 3/4��-1-0 <br />„_ <br />SCALE: 3/4 -1-0 <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />Ch u') <br />Z o <br />Z� <br />Q <br />J <br />a. <br />to C� <br />(Pro <br />°N W <br />0 <br />U — <br />W <br />0 <br />= <br />F- <br />E <br />0 <br />o <br />(n <br />U <br />0 <br />W <br />— 8 <br />4)M <br />C ro Cl) <br />N C 0 <br />o 00 <br />U y <br />0 M� <br />Y <br />Q m <br />a. o <br />O <br />A' <br />B <br />D. <br />N C.B •D•C <br />r <br />ryry <br />Wilk <br />O <br />LL <br />s� N YJ <br />W <br />MC <br />3� <br />z <br />ow <br />cu. <br />O E °'° ........ <br />: <br />W ()F E S S\ <br />h'lIlium', <br />❑ ❑ <br />To the best of the Engineer's knowledge, information, and <br />belief, the structural plans and specifications contained <br />within these drawings comply with the Florida Building <br />Code Sth Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />O <br />z <br />O r. <br />>C/)Mp <br />M <br />Q U-) 'f0 Ln <br />a cn •L '� <br />< ��� <br />a <br />V Q .� <br />00 <br />Q <br />z <br />WJ <br />� <br />f <br />woz <br />wa <br />Lu z <br />U�fvWioO <br />U <br />0z>za <br />z> <Ux <br />z <br />ifzµz� <br />Uz2� LLJ <br />US OgU3oo <br />LLICW <br />d. <br />J <br />O <br />Ln <br />N <br />Ln <br />W a, O > <br />:2zo <br />aw <br />O <br />Q <br />UzoZ P <br />-0 <br />2 <br />Zz <br />z <br />^ <br />CL <br />d X O\ Z <br />LU <br />W <br />~ <br />aQ�a80 <br />~Fpp-�W¢S <br />>aoa <br />rl <br />WOu-z¢ <br />¢W<Qo8 <br />^N <br />o <br />Ww <br />T"I <br />J 0. Y W <br />¢a9x <br />0 <br />O <br />N <br />u_ <br />z <br />.. <br />LV <br />z <br />z <br />g <br />SCALE : AS NOTED <br />PLOT DATE : 12/7/2012 <br />TECH: FFLORES <br />VERSION NO. <br />106 <br />JOB NO: 17-5179 <br />SHEET NO. <br />SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.