Laserfiche WebLink
n <br />LEFT ELEVATION <br />SCALE: 1/4"=1'-0" <br />RIGHT ELEVATION <br />SCALE: 1/4"=1'-0" <br />Id <br />'UCCO BAND) <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />FINISH <br />TRIM COLOR <br />SAND <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT' PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 1 S' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />W <br />LL,0°x <br />} <br />>QO <br />W 0 H <br />UWw cn <br />Q =m cc W � <br />� W W <br />J cr- cr <br />Y 0 1— Z <br />� tL 0 o U5 <br />Lul <br />Z Z Z H Z_ <br />Q2—i <br />Wa=cra <br />Z)=ZLLcVn <br />mf-a?cz <br />�r <br />CZ �c <br />n <br />Z <br />�i <br />Fa- <br />O <br />0 <br />U) <br />Z <br />o <br />uomm <br />O <br />00 <br />w <br />O <br />j <br />w <br />O <br />w <br />A <br />c <br />w <br />(j) <br />I <br />w <br />O <br />x <br />z <br />0 <br />E <br />U) <br />W <br />ul <br />O� <br />wz <br />aAll< <br />1.' <br />JAN 2 0 ZD22 <br />COMMUNITY: <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6103 <br />RELEASED: 1/19/22 <br />SHEET <br />A2.2 <br />