Laserfiche WebLink
a <br />ti <br />ti <br />2 <br />CM <br />J <br />y <br />r <br />z_ <br />z <br />jj <br />5D :V <br />n <br />STRUGTURAL NOTES <br />. SPEG I F I GATI ONS <br />I. 1. GONSTRUGTION <br />I. I. I. AGI 318-02 BUILDING CODE REQUIREMENTS FOR 5TRUGTURAL CONCRETE <br />I. 1. 2. AGI 530/A5GE 5/TM5 401 a AGI 530, I/A5GE 6/TM5 602-cicl <br />SPECIFIGATIONS FOR MASONRY STRUCTURES. <br />1. I. 3. A57M G2'70-a2, G476-a1, AND GG0-10 SPECIFICATIONS FOR MASONRY STRUCTURES <br />I. I. 4. NATIONAL DE51ON SPECIFICATIONS (ND5) FOR WOOD CONSTRUCTION, 2001 EDITION, AND ALL <br />AGGOMPANYING SUPPLEMENTS. <br />I. I. 5. FLORIDA BUILDING CODE (FBG), 2001 EDITION <br />I. 1.6. "MANUAL OF STEEL CONSTRUCTION, ALLOWABLE STRESS DESIGN", BY THE AMERICAN <br />INSTITUTE OF STEEL CONSTRUCTION, (AISG) QTH EDITION. <br />I. 1. 7. "DE516N SPECIFICATION FOR LIGHT METAL PLATE CONNECTED WOOD TRUSSES" BY THE <br />TRUSS PLATE INSTITUTE (TPU Icig5 EDITION. <br />1.2. DESIGN : <br />I. 2. I. AGI 318-02 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE <br />I. 2. 2. AGI 530/ASGE 5/TM5 402-61ci $ AGI 550, I/ASGE 6/TM5 602-01q <br />SPECIFICATIONS FOR MASONRY STRUCTURES. <br />I. 2. 3. ASTM G270-Q2, G476-a1, AND Gq0-90 5PEGIFIGATIONS FOR MASONRY STRUCTURES <br />1. 2. 4. NATIONAL DESIGN SPECIFICATIONS (ND5) FOR WOOD CONSTRUCTION, 2001 EDITION, AND ALL <br />ACGOMPANYINO 5UPPLEMENT5. <br />1. 2. 5. PLYWOOD DE51ON SPECIFICATIONS (APA) <br />I. 2. 6. FLORIDA BUILDING GORE (FBG), 2001 EDITION <br />SHOP <br />DRAWINGS : <br />I. 3. I. <br />THERE SHALL NOT BE ANY DEVIATIONS FROM THESE DE51ON PLANS BY OTHERS <br />DURING THE PREPARATION OF SHOP DRAWIN65 WITHOUT WRITTEN APPROVAL FROM <br />THE ENGINEER OF RECORD. <br />I. 3. 2. <br />ALL SHOP DRAWIN65 ARE TO BE SUBMITTED TO THE ENGINEER OF RECORD PRIOR TO <br />THE COMMENCEMENT OF CONSTRUCTION. <br />1. 3. 3. <br />ALL ROOF AND FLOOR TRUSS SHOP DRAWINGS ARE TO BE SIGNED AND SEALED BY A <br />FLA. REG. PE. AND SHALL INGLUDE : DRAWIN65 AND GALGULATION5, REACTIONS AND <br />BEARING POINTS, BRACING REQUIREMENTS, AND CONNECTIONS TO <br />5UPPORTING TRUSS MEMBERS. <br />2. DES I GN LOADS <br />2. I. DEAD LOADS: <br />2. I. 1. <br />UNIT WEIGHT OF SOIL, COMPACTED : <br />120 PGF <br />2. I. 2. <br />UNIT WEIGHT OF REINFORCED CONCRETE : <br />150 PGF <br />2. 1. 3. <br />UNIT WEIGHT OF 8" G.M.U. BLOCK <br />40 PSF <br />2. 1. 4. <br />IST FLOOR SUPERIMPOSED LOAD <br />20 P5F <br />2. I. 5. <br />UNIT WEIGHT OF 2x4 PARTITION WALLS : <br />II P5F <br />2. I. 6. <br />UNIT WEIGHT OF 2x6 BEARING WALLS : <br />12 PSF <br />2. 1. 7. <br />BALCONIES d DECKS: <br />15 PSF <br />2. I. b. <br />TILE ROOF <br />TOP CHORD <br />15 PSF <br />BOTTOM CHORD : <br />10 P5F <br />2. I. a. <br />SHINGLE ROOF <br />TOP CHORD <br />7 PSF <br />BOTTOM GHORD <br />10 PSF <br />2. 1. 10. <br />FLOOR TRUSSES <br />15 <br />2. 2. LIVE LOADS: <br />2. 2. I. <br />SIDEWALK AND DRIVEWAY LOAD: <br />200 P5F <br />2.2.2. <br />GARAGE LOADS : <br />50 PSF <br />2.2.3. <br />CORRIDORS AND BATHROOMS: <br />80 PSF <br />2.2.4. <br />PARTITIONED ROOMS: <br />40 P5F <br />2.2.5. <br />BALCONY AND DECKS: <br />40 P5F <br />2. 2. 6. <br />STAIRWAYS AND LANDING5 : <br />40 P5F <br />2. 2. 7. <br />ROOF: <br />20 PSF <br />2.2. 8. <br />FLOOR TRUSS <br />TOP CHORD MINIMUM : <br />40 P5F <br />2. 2. ci. <br />ROOF TRU55 <br />TOP CHORD MINIMUM: <br />20 PSF <br />2. 3, RAILING LOADS : <br />2. z�. I. <br />ALL RAILING AND GUARD RAIL 5YSTEM'S ARE TO BE DESIGNED TO WITHSTAND A <br />CONCENTRATED LOAD OF 200 POUNDS APPLIED AT ANY POINT AND IN ANY <br />DIRECTION ON THE RAILING. <br />2.3.2. <br />ALL RAILING AND GUARD RAIL SYSTEM'S ARE TO BE DE51ONED TO WITHSTAND A <br />HORIZONTAL LOAD OF 50 PLF ON THE GUARDRAIL AND A SIMULTANEOUS LOAD <br />OF 100 PLF APPLIED VERTICALLY DOWNWARD AT THE TOP OF THE GUARDRAIL <br />2.5.3. <br />GUARDRAIL SYSTEM SHALL BE DESIGNED TO WITHSTAND 2001b CONCENTRATED <br />HORIZONTAL LOAD APPLIED ON 1 50. FT. AT ANY POINT IN THE SYSTEM. <br />2.5.4. <br />2.3.1., 2.3.2 & 2.5.3. ARE NOT REQUIRED TO BE APPLIED SIMULTANEOUSLY, BUT EACH <br />SHALL BE APPLIED TO PRODUCE THE MAXIMUM STRESSES IN THE MEMBER COMPONENTS. <br />2. 4. WIND <br />LOADS : <br />2. 4. I. WIND DESIGN TO BE CONDUCTED IN ACCORDANCE WITH SECT. 160E OF THE <br />FBG, 2001 EDITION, AND CONDUCTED BASED ON A 120 MPH, 3 SECOND OUST, <br />EXPOSURE "B", IMPORTANCE FACTOR "I" = 1.0. ENGL05ED BUILDING. <br />2.4.2. NET UPLIFT DEAD LOADS - 10 PSF SHINGLE, 15 PSF TILE <br />2. 5. DEFLECTIONS : <br />2. 6. I. FLOOR TRUSSES SHALL LIMIT DEFLECTION TO 1/31 TIMES THE SPAN FOR LIVE LOADS <br />AND 1/240 TIMES THE SPAN FOR TOTAL LOAD. <br />STRUGTURAL NOTES <br />DESIGN METHOD <br />3 1. LOAD FACTOR DES I GN <br />3. I. I. THE LOAD FACTOR DESIGN METHOD WAS USED TO DESIGN <br />GA5T-IN-PLACE CONCRETE SLABS AND FOOTIN65 <br />3 2. SERV I GE LOAD DES I ON : <br />3. 2. 1_ THE SERVICE LOAD DESIGN METHOD WAS USED TO DESIGN <br />MASONRY WALLS AND LINTELS <br />INTERIOR AND EXTERIOR WOOD FRAMIN6 AND SHEATHING <br />STAIRS AND FLOOR FRAMING <br />ROOF FRAMING, SHEATHING AND UPLIFT <br />3 LORD GOMBINATIONS FOR LFRD DESIGNS <br />THE FOLLOWING LOAD GOMBINATIONS WERE DESIGNED FOR <br />TOTAL OL + FLOOR LL + ROOF LL <br />TOTAL DL + FLOOR LL + WL <br />TOTAL DL + WL <br />3.3.2. ALL ROOF AND FLOOR TRUSSES SHALL BE DESIGNED TO RESIST THE WORST LOAD <br />COMBINATION RESULTING IN THE MAXIMUM 5TRE55E5 PLACED ON THAT COMPONENT. <br />BOTH PARTIAL, FULL, AND ALTERNATING SPAN LOADING ARE TO BE CONSIDERED. <br />3. 4. DES I GN ASSUMPTIONS : <br />3. 4. I. ALL FOUNDATIONS ARE CENTERED UNDER SUPPORTED COLUMNS AND WALLS UNLE55 <br />SHOWN OTHERWISE IN THE DESIGN PLANS. <br />4. MATERIALS <br />4.1. RE I NFORG I NO STEEL : <br />4. 1. I. <br />REINFORGING STEEL SHALL BE A5TM A615-14 GRADE 40, fly = 40 Ksi <br />4, 1. 2. <br />LAP SPLICE SHALL BE AS FOLLOWS: #5 BAR 25", #4 BAR 20", #3 BAR 15". <br />4. I. 3. <br />ALL DIMENSIONS PERTAINING TO THE LOCATION OF REINFORGING ARE TO THE <br />GENTERLINE OF EACH BAR EXCEPT WHERE THE COVER DIMEN51ON 15 SHOWN TO THE <br />FACE OF THE CONCRETE. <br />4. I. 4. <br />REINFORGING DETAIL DIMENSIONS ARE OUT TO OUT OF BARS. <br />4. I. 5. <br />REINFORGING MECHANICAL COUPLERS ARE TO DEVELOP 125 % OF THE REQUIRED <br />YIELD 5TRENOTH OF THE BAR AND ARE TO BE APPROVED BY THE ENGINEER OF <br />RECORD. <br />4. 1.6. <br />DESIGN COVER REQUIREMENT5 <br />G-I-P GONCRETE FORMED AGAIN5T EARTH: 3" <br />G-I-P CONCRETE EXPOSED TO EXTERIOR: 2" <br />G-I-P CONCRETE NOT EXPOSED : 1 1/2" <br />GROUT FILLED MASONRY : 3/4" <br />PRE STRE55ED CONCRETE LINTELS (ADD. REBAR IN) 1 1/2" <br />PRE 6A5T GROUT FILLED LINTELS (ADD. REBAR IN) : 1 1/2" <br />4. I. 7. <br />WELDED WIRE FABRIC (WWF): A5TM AI85-GOo. <br />4. 1. 8. <br />DETAIL REINFORCEMENT IN AGGORDANGE WITH AGI 315-LATEST EDITION. <br />4. 2. CONCRETE : <br />4. 2. I. <br />CONCRETE TYPE <br />MIN. 28 DAY <br />DE51ON (f'c) <br />MODULES OF <br />ELASTICITY <br />DE51ON (E) <br />G-I-P CONCRETE (NORMAL WEIGHT) <br />2500 Psi <br />2,550 K51 <br />G-I-P GROUT <br />2,500 P51 <br />2,850 K51 <br />PRE CAST CONCRETE LINTELS <br />3,000 P51 <br />3,122 K51 <br />PRE STRESSED CONCRETE LINTELS <br />5,000 Pal <br />4,030 Ksi <br />4.2.2. CONCRETE SHALL CONSIST OF I" MAXIMUM A6GREGATE GONGRETE MIX WITH SLUMP <br />BETWEEN 6" AND 7" AT TIME OF PLACEMENT. 5EE SPEGIFICATION5 FOR ADDITIONAL <br />CRITERIA. <br />4.2.3. 6ROUT SHALL CON515T OF PEA ROCK (3/e" MAXIMUM A66REGATE) CONCRETE MIX <br />WITH SLUMP BETWEEN 8" AND 10" AT TIME OF PLACEMENT. SEE SPECIFIGATION5 FOR <br />ADDITIONAL CRITERIA. <br />4.2.4. CONSTRUCTION JOINTS WILL BE PERMITTED <br />4.2.5. METHOD OF GONGRETE FORMING, PLACEMENT AND GURIN6 SHALL BE GONDUGTED IN <br />ACCORDANCE WITH THE SPECIFICATIONS AS STATED. <br />4. 2. 6. EARTH SUPPORTED SLABS (EXGLUDIN.G EXTERIOR WALKWAYS 4 DRIVEWAYS) <br />3 1/2" MIN. THIGKNE55 W/ MIN. REINFORCEMENT OF 6.0 x 6.0 W/ 1.4 x 1.4 WWF <br />MID -DEPTH OF SLAB. FIBER MESH MAY BE USED I.L.O. WWF 9 CONTRACTORS DISCRETION. <br />4. 2. 1. GONGRETE PLACEMENT PRACTICES SHALL BE IN AGGORDANGE W/ ALL <br />AGI- MOP IQGq STANDARDS. <br />4. 3. CONCRETE MASONRY <br />FILLED CELLS W/ (1) #5 BAR SHALL BE LOCATED @ 8'-0" O.G. MAX, @ BOTH SIDES <br />OF OPENINGS 6'-O" WIDE OR MORE, @ THE HIGH SIDE OF ALL MASONRY WALL <br />STEPS, s @ ALL CHANGES IN DIRECTION OF THE MASONRY WALLS. <br />4.5.2. LOAD BEARING CONCRETE MASONRY BLOCK SHALL BE ASTM CciO-a0, TYPE II <br />NON -MOISTURE CONTROLLED. <br />4.5.5. ALL CELLS $ CAVITIES BELOW GRADE WILL BE FILLED W/ CONCRETE IN ALL <br />STEM WALLS. <br />4.3.4. THE A66REGATE STRENGTH OF THE BLOCK AND MORTAR SHALL BE F'm = 1,500 PSI <br />MINIMUM. <br />4. 3. 5. METHOD OF CONCRETE MASONRY PLACEMENT AND CONSTRUCTION SHALL BE <br />CONDUCTED IN ACCORDANCE WITH THE SPECIFICATIONS AS STATED. <br />4.3.1b. MORTAR SHALL BE TYPE "S" FOR ALL MASONRY CONSTRUCTION. <br />LINTELS SUPPLIED BY APPROVED MANUFACTURER: <br />1) FEGP/OAST-GRETE CORPORATION <br />2) POWER CONCRETE <br />3) ALLIED PRECAST <br />4) LOTT <br />5) MARION MA50NRY <br />6) WIEKWA <br />STRUGTURAL NOTES <br />4.4. STRUGTURAL LUMBER : <br />4. 4. I.I. INTERIOR LOAD BEARING MALLS 5.P.F., fb = 675 P51, E = 1200 KsT <br />ALL EXTERIOR FRAMING S.P.F., fb = 675 PSI, E = 1200 Ksi <br />4. 4. 1.2. ALL FRAME WALLS TO BE GONSTRUGTED USING S.P.F. , <br />STUD QUALITY OR BETTER <br />4.4.2. ALL PLYWOOD USED FOR EXTERIOR APPLICATIONS <br />SHALL BE APA RATED 5HEATHING EXP I U.N.O. <br />4.4.3. ALL PLYWOOD USED FOR INTERIOR APPLICATIONS SUCH AS SUB FLOORING AND <br />SHEAR WALLS SHALL BE APA RATED SHEATHING EXP I U.N.O. <br />4.4.4. IF 05B BOARD 15 TO BE USED IN PLACE OF PLYWOOD 15 TO HAVE SIMILAR OR <br />GREATER SECTION PROPERTIES. <br />4.4.5. ONLY STRUCTURAL LUMBER TO BE USED FOR AN EXTERIOR APPLICATION. WOOD IN <br />CONTACT WITH CONCRETE 15 TO RECEIVE A STANDARD GRADE PRESSURE TREATING. <br />4.4.6. WHEN PRE ENGINEERED TRUSSES ARE GALLED FOR ON THE PLANS THE <br />MANUFACTURER 15 TO SUBMIT SHOP DRAWIN65 TO THE ENGINEER OF RECORD. <br />4.4.7. DESIGN, FABRICATE AND ERECT WOOD TRUSSES IN AGGORDANGE WITH THE "DE51ON <br />SPECIFICATION FOR LIGHT METAL PLATE CONNECTED WOOD TRUSSES" BY THE <br />AN5I/TPI I-1a95, HIB-GI AND 05T-88. <br />4. 4. 8. UNTREATED WOOD SHALL NOT BE IN DIRECT GONTACT WITH CONCRETE. SEAT PLATES <br />SHALL BE PROVIDED AT BEARING LOCATIONS WITHOUT WOODEN TOP PLATES. <br />4. 4. a. ALL EXTERIOR FRAME WALLS SHALL HAVE 7/8" STUCCO FINISH PER A5TM G. Q26. <br />APPLY 3 LAYERS W/ THIGKNE55 OF 7/8" OVER METAL LATH. FIRST 2 LAYERS 3/8" THICK. <br />EACH, AND 3RD LAYER I/8" THICK. <br />4. 5. FASTENERS AND TIE DOWNS : <br />4. 5. I. <br />FASTENERS AND TIE DOWNS SHALL GON515T OF BUT ARE NOT LIMITED TO: <br />SHAPES, ANOLE5, CHANNELS: ASTM A36-36M a4 Fy = 36 Ksi <br />ROUND METAL PIPE: ASTM A55-c14, GRADE B Fy = 55 Ksl <br />SQUARE. METAL TUBING : A5TM A500-cK GRADE B Fy = 46K51 <br />HIGH STRENGTH BOLTS : A5TM A325-Q4 <br />MACHINE BOLTS: GALVANIZED A5TM A307-Q4 <br />4.5.2. <br />SHEET METAL ACCESSORIES SHALL CONFORM TO : Fy = 33K51WITH GC10 <br />GALVANIZED GOATIN6 IN AGGORDANGE WITH ASTM A525-87. <br />4. 5. 3. <br />NAILS SHALL CONSIST OF: COMMON WIRE NAILS WITH MINIMUM DIAMETER AS <br />FOLLOWS: 8d = 0.115", IOd = 0.125", 12d = 0.128", Ibd = 0.135". <br />4.5.4. <br />ALL FASTENERS AND TIE DOWNS EMBEDDED IN CONCRETE OR USED IN AN EXTERIOR <br />APPLICATION ARE TO RECEIVE AN ANTI -CORROSIVE GOATING BY MANUFACTURER <br />PRIOR TO INSTALLATION. <br />4. 5. 5. <br />ALL FASTENERS AND TIE DOWN5 ARE TO PROVIDE THE UPLIFT GAPAGITY GALLED <br />FOR IN THE PLANS ARE A MINIMUM. <br />4. 5. 6. <br />ALL FASTENER TIE DOWNS, BEAM HANGERS, J015T HANGERS, AND FLOOR TRU55 <br />STRAPPING ARE TO BE INSTALLED IN AGGORDANGE WITH THE PLANS AND <br />SPEGIFIGATION5. <br />4. 5. 7. <br />CONCRETE EMBEDDED 'JBOLT5 USED FOR UPLIFT ARE TO BE WET SET PRIOR TO <br />INITIAL SET OF THE CONCRETE, 5PAGING AND ALIGNMENT ARE TO BE IN ACCORDANCE <br />WITH THE DESIGN PLANS, U.N.O. ALTERNATES TO "J" BOLTS ARE NOTED ON PLANS. <br />4. 5. 8. <br />CONCRETE EMBEDDED TIE DOWN5 USED FOR TRUSS AND WALL UPLIFT ARE TO BE <br />PLACED AROUND EMBEDDED REINFORCING PRIOR TO PLACING GROUT. <br />4.6. M I GRO-LAM <br />LUMBER: <br />4. 6. I. <br />MICRO -LAM STRESS GRADES SHALL PROVIDE THE FOLLOWING MINIMUM PROPERTIES: <br />E = 2,000,000 PSI <br />Fb = 2,g50 PSI <br />Ft = 1,550 P51 <br />Fr_ = 500 PSI (PERPENDIGULAR) <br />Fc = 2,100 (PARALLEL) <br />Fv = 285 P51 <br />4.7. STEEL: <br />4.7. I. INSTALLATION OF ALL STEEL TO BE PERFORMED BY AN EXPERIENCED, QUALIFIED <br />STEEL ERECTOR. <br />4.7.2. FABRICATE AND ERECT ALL STRUCTURAL STEEL IN ACCORDANCE WITH A.I.S.C. <br />"SPECIFICATION FOR THE DE51ON, FABRICATION, AND ERECTION OF STRUCTURAL <br />STEEL FOR BUILDIN65". <br />4.7.3. STRUCTURAL STEEL: ASTM A36-36M G4. <br />4.7.4. STEEL TUBING: A5TM A500-cK GRADE B. <br />4. 7. 5. WELDED CONNECTIONS: E70XX ELECTRODES, MINIMUM SIZE FILLET WELDS 5/16", AW5 <br />CERTIFIED WELDERS. GERTIFIGATION PAPERS TO BE SUBMITTED UPON REQUE5T. <br />4.1.6. WHERE STEEL BEAMS ARE CONTINUOUS OVER GOLUMNS, PROVIDE WEB STIFFENER <br />PLATES ON EACH SIDE OF THE WEB, OF A THICKNESS EQUAL TO BEAM FLANGE <br />THIGKNESS, LOCATED AT THE CENTER LINE OF THE TUBE COLUMN. <br />4. 7. 7. THE STEEL FRAME 15 "NON -SELF SUPPORTING". ADEOUATE TEMPORARY SUPPORT <br />SHALL BE PROVIDED BY THE CONTRACTOR UNTIL REQUIRED CONNECTIONS OR <br />ELEMENTS ARE IN PLACE. <br />STRUGTURAL NOTES <br />4. 8. SOIL: <br />4. 8. I. MINIMUM 501L BEARING PRESSURE CAPACITY OF 2000 P5F. <br />4. 8. 2. ALL 501L 15 TO BE GI FAN i P015ONED FOR TERMITES PER FBG 2001 SECTIONS <br />104.2.6, 104.2.7, 1403.1.6, 1503.4.4, 1816, K1163.5, 2503.1.4, $ 2304. <br />TERMITE PROTECTION - <br />PUNS MUST SPEG I FY TYPE OF TERMITE TREATMENT <br />• Soil Chemical Barrier Method <br />• Other treatment - Must specify proposed method and submit documentation, which <br />substantiates the proposed method, is an approved termite protection system or method. <br />IF CHEM I GAL SOIL TERMITE TREATMENT 15 USED <br />I. FBG 104.2.E - "A permanent sign which identifies the termite treatment provider <br />and need for re-inspectlon and treatment contract renewal shall be provided. <br />The sign shall be posted near the water heater or electric panel" <br />2. FBG 1503.4.4 - Condensate and roof downspouts shall discharge at least <br />I'-O" away from the building side walls. <br />3. FBG 1505.4.4 - Irrigation/sprinkler systems including all risers and <br />spray heads shall not be installed within 1'-0" of the building side wall. <br />4. FBG 1403.1.E - To provide for Inspection for termite infestation, between <br />wall covering and final earth grade shall not be less than 6 Inches. <br />Exception: Paint or decorative cementitiou5 finish less than 5/8" <br />thick adhered directly to the foundation wall. <br />5. FBG 1816.1.1 - Initial treatment shall be done after all excavation <br />and backfill is complete. <br />6. FBG 1816.1.2 - Soil disturbed after the Initial treatment shall be retreated <br />including spaces boxed or formed. <br />7. FBG 1816.1.3 - Boxed areas in concrete floors for subsequent installation of traps, <br />etc., shall be made with permanent metal or plastic forms. Permanent forms must be <br />of a size and depth that will eliminate the disturbance of soil after the initial treatment. <br />8. FBG 1816.1.4 - Minimum 6 mil vapor retarder must be installed to protect against <br />rainfall dilution. if rainfall occurs before vapor retarder placement, <br />retreatment i5 required. <br />a. FBG 1816.1.5 - Concrete overpour and mortar along the foundation perimeter <br />must be removed before exterior soil treatment. <br />10. FBG 1816.1.E - Sall treatment must be applied under all exterior concrete <br />or grade within I'-O" of the structure 5idewalls. <br />II. FBG 1816.1.6 - An exterior vertical chemical barrier must be installed after <br />construction is complete, including landscaping and irrigation. Any soil disturbed <br />after the vertical barrier is applied, shall be retreated, <br />12. FBG 18I6.1.7 - All buildings are required to have pre -construction treatment. <br />15. FBG 0I6.1.7 - A certificate of compliance must be issued to the building department <br />a licensed pest control company before a certificate of occupancy will be issued. <br />e certificate of compliance shall state: "The building has received a complete <br />treatment for the prevention of subterranean termites. The treatment 15 in <br />accordance with the rules and laws of the Florida Department of Agriculture <br />and Gonsumer Services". <br />14. FBG 2303.1.3 - After all work is completed, loose wood and fill must be removed <br />from below and within 1'-0" of the building. This Includes all grade stakes, <br />tub trap boxes, forms, 5horing or other cellulose containing material. <br />15. FBG 2505.1.4 - No wood, vegetation, stumps, cardboard, trash, etc., <br />shall be buried within 15'-0" of any building or proposed building. <br />4. 8. 3. 501L 15 TO BE COMPACTED TO 515% MODIFIED PROCTOR AS DEFINED BY <br />ASTM D 1557-ci I <br />ATTENTION: CHEMICAL CHANGES iN PRESSURE TREATED WOODS <br />AS OF DECEMBER 315T, 2003, CHROMATED COPPER ARSENATE (CCA-C) <br />WILL NO LONGER 8E PRODUCED FOR RESIDENTIAL OR GENERAL <br />CONSUMER USE. SEVERAL NEW PRESSURE TREATED WOOD ALTERNATIVES <br />HAVE }SEEN CREATED TO REPLACE CCA-C. MANY OF THE NEW PRESSURE <br />TREATED WOODS USE CHEMICALS THAT ARE CORROSIVE TO STEEL. iT IS <br />THE CONTRACTOR'S RESPONS151LITY TO VERIFY THE TYPE OF WOOD <br />TREATMENT AND TO SELECT APPROPRIATE CONNECTORS THAT RESIST <br />CORROSION. FOR EXAMPLE, ACQ-C, ACQ-D, C5A-A, OR CA-5 REQUIRE <br />HOT -DIPPED GALVANIZED OR STAINLESS STEEL FASTENERS. DOT SODIUM <br />50RATE (SSX) DOES NOT. <br />AlREMSED 08-15-03 <br />AoCREATED 01-02-02 <br />120 MPH <br />3 SEC. GUST <br />❑ SAMUEL A. G PREEN£3ERG, P.E. 034245 <br />❑ THUY H. HUYNH, P.E. 460122 <br />❑ IRLUiN J. SENSON, P.E. 04-1 <br />❑ AL I A515AS HAKIM, P.E.. 056l Sro <br />TO THE BEST OF THE ENGINEER'S 104OWLEDGE AND BELIEF, THE <br />STRUCTURAL PLANS AND SPECIFICATIONS COMPLY WITH THE <br />FLORIDA BUILDING CODE, SECTION 1606 FOR 120 MPH 3 SECOND <br />GIST, EXPOSURE 'S' WIND ZONE (2001 EDITION). <br />T1416 DRAWING AND DESIGN IS VALID FOR 12 MONTHS AFTER THE <br />DATE IT IS SIGNED AND SEALED. <br />SK,NED AND SEALED FOR THE STRUCTURAL PORTION OF THIS <br />DRAWING ONLY. <br />T- T_ i F <br />