Laserfiche WebLink
LATEST DATE : IN PROCESS DESCRIPTION <br />REVISION DATE <br />09/24/03 <br />r. <br />2X8's ® 24" O.C. — <br />SIMPSON SP20 TOP -- <br />SP1 ® BOTTOM <br />P.T. 2X8 PLATE CONT. <br />LEFT ELEVAT�ON <br />ve — —0 <br />PRE—ENG. TRUSSES <br />® 24' O.C. <br />SIMPSON MTS18 ® EA. TRUSS <br />2X4_ FILLER FRAMING <br />® 24" O.C. <br />1 /2" DIA. "J" BOLTS ® 24" O.C. STAGGERED <br />K.O. BLOCK TIE BEAM W/ <br />1 — #5 CONT. IN GROUT <br />FACM DETML <br />1 /2" = 1'-0" <br />ENTRY DETQ�L aaC" <br />1 /2" = 1'—O" <br />F.F. <br />OD <br />i <br />ff <br />LO <br />WommusY <br />Au <br />ON <br />TOP OF BLOCK <br />+8'- ' A.F.F. <br />TOP OF SLAB <br />C <br />C <br />700AR ELEVATION <br />1 /8" = 1'-0" <br />O ROOF VENT 5CNEDULE O <br />verify with General Contractor all roof vent locations, <br />quantities, and sizes. Roof vents shall be insta I led <br />for a minlmum of vented area as listed below: <br />Off ridge vents or <br />Soffit vent <br />Mark <br />Location <br />equal system (sq. in.) <br />(sq. in.) <br />RV i <br />let Level <br />4W <br />4W <br />Roof <br />RV Z <br />Csa 9e <br />96 <br />96 <br />Roof <br />ENTRY SE%`:,:�,MON "C' <br />1 /2" = 1'-0" <br />IAND <br />Q <br />POP —OUT DDETML <br />1 /2" = 1'-0" <br />RK"31HT ELEVAT�ON <br />1 /8" = 1'-0" <br />FRONT ELEVAT�ON <br />1 /4" = 1'-0" <br />E ELEVATION "C" NOTES ❑ <br />MARK NUMBER DESCRIPTION <br />1 FIBERGLASS SHINGLES (TYP.) <br />2 <br />RIDGE VENTS <br />3 <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W TOTAL THICKNESS 7/8" OVER METAL LATH. <br />FIRST 2 LAYERS 3/8 THICK EACH. 3RD LAYER 1 /8" THICK. <br />4 <br />1" x 2" SCORED BAND, SMOOTH DECORATIVE FINISH <br />5 <br />1" x 8" OVER 1" x 12" SCORED BAND, SMOOTH DECORATIVE FINISH <br />6 <br />3/4" x 4" SCORED BAND, 2'-3" OUTER RADIUS, STUCCO FINISH <br />7 <br />3'-8" RADIUS BARREL CLG. <br />8 <br />CONTROL JOINT <br />9 <br />SCORED DECORATIVE FINISH <br />10 <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W TOTAL THICKNESS 7/8" OVER METAL LATH. <br />FIRST 2 LAYERS 3/8 THICK EACH. 3RD LAYER 1/8" THICK. <br />vJ <br />Z <br />u= <br />u: <br />u: <br />ILL: <br />LL: <br />O <br />m <br />vd <br />06 <br />vi <br />0) <br />�— <br />N <br />N <br />Q <br />m <br />M <br />Cm <br />co <br />JT" <br />It <br />.- <br />10 <br />N <br />V <br />J <br />Q <br />a� <br />zW <br />U <br />w <br />W <br />Q <br />Z <br />> <br />a <br />W <br />> <br />< <br />>0 <br />0 <br />0 <br />J <br />@3 <br />U <br />C) <br />11-- <br />Q <br />DATE <br />05-22-02 <br />SCALE : <br />AS NOTED <br />DRAWN BY <br />8V <br />AUT DCAD FLE NAME <br />im <br />ENGHM OF RECORD : <br />DAN8C0 <br />MWEERNIM P.A. <br />SHEET DESIRFtiON : <br />ELEVATION •C• <br />PLAN <br />0 <br />