Laserfiche WebLink
Table of Contents <br />DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS <br />NOT USED <br />DIVISION 01 - GENERAL REQUIREMENTS <br />01 11 16 <br />WORK BY OWNER <br />01 14 16 <br />COORDINATION WITH OCCUPANTS <br />01 21 31 <br />OWNER DIRECT PURCHASE (TAX EXEMPT) PROCESS <br />0125 13 <br />SUBSTITUTION PROCEDURES AFTER EXECUTION OF CONTRACT <br />0126 13 <br />REQUESTS FOR INFORMATION (RFI) <br />01 29 00 <br />APPLICATIONS FOR PAYMENT AND SCHEDULE OF VALUES (GC) <br />01 31 19 <br />PROJECT MEETINGS <br />01 32 16 <br />CONSTRUCTION SCHEDULES <br />01 33 00 <br />SUBMITTAL PROCEDURES <br />01 42 10 <br />ABBREVIATIONS - TERMINOLOGY <br />01 42 11 <br />ABBREVIATIONS - ORGANIZATIONS AND STANDARDS <br />01 42 13 <br />ABBREVIATIONS FOR UNITS OF MEASURE - ENGLISH SYSTEM OF UNITS (IP) <br />01 42 15 <br />ABBREVIATIONS FOR UNITS OF MEASURE INTERNATIONAL SYSTEM OF UNITS <br />(SI) <br />014216 <br />DEFINITIONS <br />01 43 43 <br />COORDINATION DRAWINGS <br />01 45 23 <br />TESTS AND INSPECTIONS <br />01 65 00 <br />DELIVERY, HANDLING AND STORAGE: MATERIALS AND EQUIPMENT <br />01 73 29 <br />CUTTING AND PATCHING <br />01 74 23 <br />CLEANING <br />01 7700 <br />CONTRACT CLOSEOUT (GC) <br />01 78 23 <br />OPERATION AND MAINTENANCE DATA <br />01 78 26 <br />INTERIOR FINISH FIRE PERFORMANCE DATA <br />01 78 36 <br />WARRANTIES AND GUARANTEES <br />01 7839 <br />PROJECT RECORD DOCUMENTS <br />DIVISION 02 <br />- EXISTING CONDITIONS <br />02 41 00 DEMOLITION <br />DIVISION 03 - CONCRETE <br />NOT USED <br />NOT USED <br />DIVISION 05 - METALS <br />NOT USED <br />DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES <br />NOT USED <br />042.21-177.01 AdventHealth - Zephyrhills: Operating Room #5 - Cystoscopy <br />Table of Contents - 1 <br />3/17/2021 <br />