My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:05:23 PM
Creation date
2/18/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Building Plans - Permit #
18385
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UniSpec II - Store Planning 062615 <br />' SECTION 01131 - ALTERATIONS PROJECT PROCEDURES <br />' PART 1 - GENERAL <br />1.1 DESCRIPTION <br />A. Summary: The procedures and administrative requirements of this Section apply to all of the following Sections <br />of the Specification, which are involved in alterations to the existing building. <br />1 1.2 RELATED REQUIREMENTS <br />A. Section 01351 -Regulatory Compliance. <br />B. Section 01500 - Temporary Facilities and Controls <br />C. Section 01731 - Cutting and Patching <br />D. Section 02023 - Selective Site Demolition <br />E. Section 02251 - Shoring <br />1.3 SCHEDULING, ACCESS AND SECURITY <br />A. Work Sequence: <br />1. The existing premises will be occupied during the construction process. Coordinate sequence of work with <br />Wal-Mart Construction Manager and Store Manager on site in order that Wal-Mart's operations may <br />' continue. <br />2. The Wal-Mart Construction Manager will require a job start meeting prior to any Work activity. <br />3. The Construction Schedule is limited to a time frame established by Wal-Mart. Contact Wal-Mart <br />Construction Manager immediately if, at any time, construction schedule is not being met or if delays are <br />' foreseen. <br />4. The Contractor shall develop a schedule of Work, which will be reviewed and approved by the Wal-Mart <br />Construction Manager, describing the starting and completion dates of the different phases of this Project. <br />' Wal-Mart reserves the right to revise this schedule to best meet the needs for the Store's operations. <br />Revisions to the Construction Schedule shall be made by the Contractor at no additional cost to Wal-Mart. <br />As the construction progresses, the Contractor shall give an update of the construction schedule to the Store <br />Manager and Wal-Mart Construction Manager on a weekly basis. <br />' B. Security is specified in Section 01500. <br />C. Maintenance of Access and Operations: <br />1. During period of construction, Wal-Mart will continue to perform normal activities in existing building. <br />Maintain proper and safe Customer and Associates access to operational areas at all times. <br />2. Schedule demolition and remodeling operations with Wal-Mart Construction Manager and/or Store <br />' Manager in such a manner as to allow Wal-Mart operations to continue with approved interruptions. <br />3. During period of construction, do not obstruct in any manner existing exitways unless additional exitways <br />are provided. Prior to removal of existing exitways (stairs, corridors, doors) as part of new Work, provide <br />and maintain new exitways so as to maintain same number of exitways. Maintain existing fire doors in a <br />operable condition. Obtain approval from Authorities Having Jurisdiction (AHJ) for all temporary <br />modifications to the existing system. <br />1 01131 - 1 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.