My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:05:23 PM
Creation date
2/18/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Building Plans - Permit #
18385
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UniSpec II - Store Planning 062615 <br />SECTION 01230 - ALTERNATES <br />' PART 1 - GENERAL <br />1.1 SUMMARY <br />' A. Section Includes: <br />1. Alternate submission requirements of work included in Alternates. <br />' B. Related Sections: <br />1. Construction Contract Between Wal-Mart and Contractor: Acceptance of Alternates in award of a <br />Contract. <br />1.2 DEFINITIONS <br />A. Alternate: An amount proposed by bidders and stated and defined on the Bid Form for certain work that may be <br />' added to or deducted from the base bid amount if Wal-Mart decides to accept a corresponding change either in the <br />amount of construction to be completed or in the products, materials, equipment, systems, or installation methods <br />described in the Contract Documents. <br />1. Alternates will be a part of the Work only if enumerated in the Agreement. <br />2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate <br />alternate into the Work. No other adjustments are made to the Contract Sum. <br />1.3 PROCEDURES <br />A. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of <br />each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a <br />complete description of negotiated modifications to alternates. <br />B. Execute accepted alternates under the same conditions as other work of the Contract. <br />1.4 SUBMISSION REQUIREMENTS <br />A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at the Owner's option. Accepted alter- <br />nates will be identified in the Construction Contract between Wal-Mart and Contractor. <br />1.5 SCHEDULE OF ALTERNATES AND DESCRIPTION OF WORK INCLUDED IN ALTERNATES. <br />' A. Schedule of Alternates, when applicable, and descriptions thereof are shown on the Bid Form. <br />PART2-PRODUCTS <br />Not Used. <br />PART 3 - EXECUTION <br />' Not Used. <br />END OF SECTION <br />1 01230 - 1 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.