Laserfiche WebLink
A <br />1.8 PROJECT COORDINATION <br />A. Coordinate scheduling, submittals, and work of the various Sections of specifications to ensure efficient and <br />orderly sequence of installation of interdependent construction elements, with provisions for accommodating items <br />installed at a later date and under separate contracts. <br />B. Obtain necessary drawings, manufacturer's product data, and other necessary data to provide a complete and <br />proper installation. <br />1. Check field dimensions prior to installing equipment and furnishings. Verify necessary clearances and <br />means of access from equipment storage to final position. <br />2. Make shop drawings and manufacturer's rough -in requirements available to trades involved. <br />C. <br />Verify that utility requirements of operating equipment are compatible with building utilities. Coordinate work of <br />various specification Sections for installation and final connection of equipment. <br />1. Verify that mechanical, plumbing, and electrical rough -ins have been properly located. <br />D. <br />Coordinate space requirements and installation of mechanical and electrical Work which are indicated <br />r <br />diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits as closely as practicable. <br />Make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other <br />installations, for maintenance, and for repairs. <br />E. <br />In finished areas, conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets <br />with finish elements. <br />F. <br />Coordinate completion and clean up of work of separate Sections in preparation for Substantial Completion and <br />for portions of Work designated for Owners partial occupancy after possession. <br />G. <br />After Owner occupancy of premises, coordinate access to site for correction of defective work and work not in <br />accordance with Contract Documents, to minimize disruption of Owner's activities. <br />PART2-PRODUCTS <br />Not Used. <br />PART 3 - <br />EXECUTION <br />Not Used. <br />END OF <br />SECTION <br />1 <br />1 <br />1 <br />01310 - 4 1 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />