My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:05:23 PM
Creation date
2/18/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Building Plans - Permit #
18385
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6.1.9.3 Retention of Training Documents. Contractor shall document and retain records of training provided to <br />Workers and Subcontractors, including the name, date, and subject of each training session. <br />3.6.1.10 SITE INSPECTION/AUDIT <br />3.6.1.10.1 Contractor Site Inspection/Audit. Contractor shall accomplish all required self -audits within the time <br />allotted. Specifically, these include those inspections/audits referenced in the Specifications, as well as <br />all safety related inspections and audits as required under Safety Laws. <br />3.6.1.10.2 Walmart Site Inspection/Compliance Audit. Walmart may in its sole discretion, retain an independent <br />consultant (the "Audit Consultant") or utilize Walmart Associates to conduct inspections/audits of the <br />Site or of Contractor required documentation or conduct surveys or interviews to determine Contractor <br />compliance with Compliance Requirements. Laws (the "Compliance Audit"). <br />3.6.1.10.3 Contractor Cooperation. Contractor shall fully cooperate and shall require Subcontractors and Workers <br />to fully cooperate, with Walmart or any 31 party auditors during such inspections and audits. <br />3.6.1.10.4 Worker Verification. There are unique audit requirements for Worker Verification compliance. See <br />Sec. 3.6.5 of the Compliance Exhibit and these Specifications. <br />3.6.1.11 MODIFICATION. See Section 3.6.1.11 of the Compliance Exhibit. <br />3.6.1.12 OWNER REMEDIES AND DAMAGES. See Section 3.6.1.12 of the Compliance Exhibit. <br />3.6.2 PART 2 - ENVIRONMENTAL COMPLIANCE. Contractor is responsible for compliance with all <br />Environmental Laws, including compliance with all regulations regarding use, generation, storage, <br />handling, discharge, disposal and transport of Universal, Solid and Hazardous Waste. <br />3.6.2.1 COMPLIANCE WITH DOT LAWS AND REQUIREMENTS. Compliance with Federal, state, and local <br />transportation Safety Laws governing the safety of any shipments, including both Hazardous Material and <br />Hazardous Waste arising out of the course of the Work. This includes but is not limited to classification, <br />proper shipping name, packaging, marking and labeling, documentation including shipping papers and man- <br />ifests, placarding and any other special consideration required. <br />3.6.2.2 LICENSES, PERMITS, AND CERTIFICATIONS. See Sec. 3.6.1.4 of the Compliance Exhibit and these <br />Specifications. <br />3.6.2.2.1 Hazardous Waste Generator Permit. Contractor, as generator of Hazardous Waste, must obtain an EPA <br />and/or state RCRA identification numbers, if the identification number is required in accordance with <br />state or Federal regulations. Contractor shall not indicate Walmart as the generator of waste or utilize a <br />Walmart EPA or state RCRA identification number. <br />(a) Where projects occur in buildings occupied by Walmart, in the event the state or Federal jurisdiction <br />does not allow Contractor to obtain an independent RCRA identification number contact the Construc- <br />tion Manager. <br />(b) In the event Contractor is required by state or Federal regulations to obtain an EPA and/or state RCRA <br />identification number for a specific site, the number shall be deactivated upon completion of the project. <br />3.6.2.2.2 Uniform Hazardous Waste Manifest. Contractor shall be the generator of waste listed on the Uniform <br />Hazardous Waste Manifest when disposing of Hazardous Waste or Universal Waste. Contractor shall <br />not indicate Walmart as the generator of waste on the manifest. <br />3.6.2.2.3 Solid Waste Mana eg ment. Firms and facilities used for recycling, reuse and disposal of C&D Waste <br />shall be appropriately permitted for the intended use to the extent required by Federal, state and local <br />environmental Authorities Having Jurisdiction. Contractor shall negotiate and sign agreements for re- <br />quired services in compliance with state and local environmental regulations and specified requirements <br />3.6.2.3 SITE INSPECTION / AUDITS. See Sec. 3.6.1.10 of the Compliance Exhibit and these Specifications. <br />3.6.2.3.1 Weekly Hazardous Waste Inspection. In addition to any periodic inspections the Contractor may conduct <br />within its Hazardous Waste Program, the Contractor must perform an initial Hazardous Waste Setup <br />Checklist within the Evoco fuze system to ensure Contractor has met certain minimum requirements in <br />01351-10 <br />11 <br />1 <br />a <br />1 <br />0706 - Zephyrhills, Florida - 16592140 <br />February 16, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.