Laserfiche WebLink
2)Tenant Contractor Workers; and <br />3)Such other personnel and individuals that Walmart may approve. <br />3.6.4.3.4 Perimeter Controls and Safeguards. Contractors, without any increase in the Contract Sum, shall take <br />such actions as may be necessary to maintain security on the Site, including, but not limited to, the <br />control of the Site perimeter through erection of temporary security fencing or other barriers around the <br />Project Site. In the event that perimeter control methods are used, Contractor shall monitor such controls <br />to ensure the integrity of such controls is maintained at all times. <br />3.6.4.3.5 Hazard Safe ug ards. Contractor shall provide reasonable safeguards for safety and protection of persons, <br />including, without limitation: <br />(a) Posting warning/danger signs and other warning signs on or around the Project Site or specific hazards, <br />such as an excavation; <br />(b) Providing proper and sufficient barricades; <br />(c) Providing proper and sufficient lighting; <br />(d) Providing proper and sufficient guarding; and <br />(e) Notifying users of the conditions of the Project site as well as adjacent sites and utilities. <br />3.6.4.3.6 Non -Compliant Equipment or Material. Contractor shall keep the Project Site clear of any machinery, <br />tool, material, or equipment which is not in compliance with any applicable Safety Law or other Com- <br />pliance Requirement. <br />3.6.4.3.7 Spotters - When there is risk of harm due to Construction Work in an area where there is an expectation <br />that customers, vendors or associates are or could become present, the Contractor is to provide spotter(s) <br />(or signal persons), in addition to equipment operators, whose sole responsibility shall be to provide <br />verbal notice to customers and associates regarding the construction risk and assist with ensuring the <br />work is properly segregated from the retail environment. Spotters are not required where there is no <br />expectation that customers, vendors or Walmart Associates will be present. <br />3.6.4.4 TRAINING See Sec. 3.6.1.9 of the Compliance Exhibit and these Specifications. Contractor must ensure <br />workers are trained as required by Safety Laws. Training documentation must be kept on site. Specific areas <br />where training are required include but are not limited to: <br />(a) Personal Protective Equipment. 29 CFR 1926 Subpart E <br />(b) Electrical. As required by 29 CFR 1926 Subpart K and NFPA 70E <br />(c) Scaffolds. 29 CFR 1926 Subpart L <br />(d) Fall Protection. 29 CFR 1926 Subpart M <br />(e) Excavations. 29 CFR 1926 Subpart P <br />(f) Crane Operation. 29 CFR 1926 Subpart CC <br />(g) Steel Erection. 29 CFR 1926 Subpart R <br />(h) Toxic and Hazardous Substances. 29 CFR 1926 Subpart Z. In addition, 29 CFR 1910 Subpart Z when <br />Walmart occupies the building where the work will occur and where Walmart associates / customers will be <br />exposed to air contaminants generated by the work. <br />3.6.4.5 SITE INSPECTION / AUDIT See Sec. 3.6.1.10 of the Compliance Exhibit and these Specifications. Con- <br />tractor must ensure Competent/Qualified persons inspect the job site as required by Safety Law. Inspections, <br />including deficiencies found and corrective measures taken, must be kept on site. Specific areas where in- <br />spections are required include but are not limited to: <br />(a) Scaffolds. 29 CFR 1926 Subpart L <br />(b) Fall Protection. 29 CFR 1926 Subpart M <br />(c) Excavations. 29 CFR 1926 Subpart P <br />(d) Crane Operation. 29 CFR 1926 Subpart CC <br />(e) Toxic and Hazardous Substances. 29 CFR 1926 Subpart Z. <br />1)Toxic and Hazardous Substances in a Facility Occupied by Walmart. In addition, 29 CFR 1910 Subpart <br />Z when Walmart occupies the building where the work will occur and where Walmart Associates / cus- <br />tomers will be exposed to air contaminants generated by the work. <br />01351-20 <br />1 <br />1 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 1 <br />