Laserfiche WebLink
1 <br />1 <br />1 <br />U <br />1 <br />1 <br />Safety <br />Lockout Tagout Pre -Construction Meeting Form <br />Jobsite City & State: <br />Store / Club #: <br />Construction Start Date: <br />I <br />The following is applicable when project work occurs in facilities occupied by Walmart. <br />Walmart Store Management and the General Contractor shall inform each other of the applicable lockout / tagout procedures that will be utilized during the project. <br />Walmart Store Management must provide the General Contractor with a copy of the Store Lockout / Tagout procedures used at the store and available on the WIRE. <br />The General Contractor Superintendent must provide Store Management with copy(s) of the Lockout/Tagout procedure(s) that will be utilized on the project. Discus- <br />sion / explanation of the procedures must take place during the pre -construction meeting. Visual demonstration of the devices that will be used for control of energy <br />(locks and tags) should also occur. <br />It is the responsibility for the General Contractor Superintendents and Store Management to ensure their respective Workers or Associates comply with the restrictions <br />and prohibitions of the various energy control programs. It is most important that construction workers and Walmart Associates recognize the locks and tags used, or <br />any other method used to control other forms of energy, and understand they may not alter remove or in any way try to energize a circuit that has been locked or <br />tagged by another employers associates/workers. <br />Note to Construction Manager and Store Management: Walmart Lockout Tagout Procedures are located on the WIRE at the following location: WIRE>Knowledge <br />Center>Safety>OSHA Programs / Lockout/Tagout. <br />Store Management Signature <br />Date <br />General Contractor Superintendent Signature <br />Date <br />General Contractor must have Field Leadership (foreman) for each trade / subcontractor sign below verifying they understand the Lockout Tagout processes applica- <br />ble to the job site before they begin any work on the site. <br />Company Name and Trade <br />Signature of Field Leadership (Foreman) <br />Date <br />Note: This Form is required by Contract Exhibit <br />Section XXX and Compliance Spec Section XXX. <br />Once the document is signed by both Store <br />Management and the Superintendent a copy <br />should be given to Store Management for their <br />records. The Superintendent should keep the <br />original for documenting the training given to <br />workers and trade foremen. The final copy <br />should be kept as part of the contract docu- <br />ments and must be made available to OSHA or <br />Walmart upon request. <br />1 0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />01351-37 <br />