Laserfiche WebLink
n <br />�J <br />UniSpec II- Store Planning 111811 <br />SECTION 01330 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Submittal procedures prior to and during construction. <br />B. Related Sections: <br />1. Section 01458 - Testing Laboratory Services: Submittals required for tests and inspections <br />2. Section 01600 - Product Requirements: Requirements for product selection and product options. <br />3. Section 01640 - Owner Furnished Products. General procedures related to Owner furnished products. <br />4. Section 01770 -Contract Closeout: Closeout submittals. <br />1.2 PROCESS AND RESPONSIBILITIES <br />A. Contractor Responsibilities: <br />1. <br />Submit required submittals to Architect unless otherwise specified. <br />2. <br />Comply with submittal requirements defined within individual Sections. Submittals procedures described <br />herein shall apply unless otherwise stated in individual Sections. <br />3. <br />Package each submittal appropriately for transmittal and handling. <br />4. <br />Identify Project, Contractor, subcontractor or supplier, pertinent Drawing sheet and detail numbers, and <br />Specification Section number, as applicable. <br />5. <br />Assemble, coordinate, and review submittals of subcontractors, suppliers, and manufacturers. <br />6. <br />Review submittal for verification of products required, field dimensions, adjacent construction, and <br />coordination of information. <br />7. <br />Apply Contractor's Submittal Review stamp, signed or initialed and dated, certifying compliance with Contract <br />' <br />Documents. <br />8. <br />Identify email transmittal of submittals in the subject line as follows: <br />a. Walmart, Street, City, State, Store 4, Store type ("SC" Super Center, "Sam's" Sam's Club, "NM" Mar- <br />ket), Submittal name (e.g. concrete mix design, sieve analysis, etc), Date of Submittal <br />9. <br />Forward executed copy of Submittal Review Form to supplier within 5 days after receipt of submittal with <br />copies to Architect and Wal-Mart's Construction Manager. <br />' 10. <br />Schedule submittals to expedite the Work. Coordinate submission of related items into single submittal, unless <br />otherwise specified. <br />11. <br />Submit submittals items required within an individual Specification Section into a single submittal. <br />12. <br />Identify variations from Contract Documents and limitations of product and system which may be detrimental <br />' <br />to successful performance of the completed Work. <br />13. <br />Provide space on submittal for Contractor, Architect, and Architect's Consultant review stamps. <br />14. <br />Allow 10 working days for review. <br />15. <br />16. <br />Revise and resubmit submittals when required. Identify changes made since previous submittal. <br />Notify Vendor or Subcontractor of approval by Authority Having Jurisdiction of Deferred Submittal package. <br />17. <br />Distribute copies of reviewed submittals to concerned parties and to Record Documents file. Instruct parties to <br />promptly report inability to comply with provisions. <br />' B. Supplier <br />Responsibilities - Wal-Mart (Owner) Furnished Products: <br />1. <br />Subcontractors, vendors, and suppliers (including suppliers of Wal-Mart (Owner) furnished products) shall <br />2. <br />forward copies of submittals to the Contractor. <br />Prepare submittals in accordance with requirements in individual Specification Sections and Contractor <br />responsibilities specified herein. <br />1 01330 - 1 <br />S0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />