Laserfiche WebLink
Addendum No. Ol Revision No. 1 Narrative <br />Project Name: FH Zephyrhills Ed Expansion & Ortho Renovation KC <br />Project No.: H-15027.00 <br />Structural Drawings <br />Dwg No is <br />,Description <br />Remarks <br />Reason for#Change <br />Sill <br />FLOOR PLAN - 1ST LEVEL -PHASE 1 <br />Added Plan Key Notes 5 & 6, <br />Coordination <br />added section cut Al5/S201 and <br />added ME 16's. <br />S201 <br />SECTIONS AND DETAILS <br />Added section A15. <br />Coordination <br />Demolition Drawings <br />:,Dwg No <br />Description <br />Remarks <br />Reason for,,Change <br />D001 <br />DEMOLITION NOTES AND <br />L7 - Added note to brace header <br />Coordination <br />TEMPORARY PARTITION DETAILS <br />Dill <br />DEMOLITION PLAN - 1ST LEVEL - <br />Revised scope line to show Phase <br />Coordination <br />PHASE 1 <br />1 scope only <br />D112 <br />DEMOLITION PLAN - 1ST LEVEL - <br />Added demo notes for main <br />Coordination <br />PHASE 2 <br />nurse station as an add alternate <br />Revised scope line to show Phase <br />Coordination <br />2 scope onl <br />D121 <br />DEMOLITION PLAN - 2ND LEVEL - <br />Added ICRA Walls <br />Coordination <br />AREA 1 <br />D122 <br />DEMOLITION PLAN - 2ND LEVEL - <br />Added note to refer to P122 for <br />Coordination <br />AREA 2 <br />lumbin demolition <br />D411 <br />DEMOLITION CEILING PLAN - 1ST <br />Added demolition notes <br />Coordination <br />LEVEL - PHASE 1 <br />D412 <br />DEMOLITION CEILING PLAN - 1ST <br />Added additional demolition <br />Coordination <br />LEVEL - PHASE 2 <br />notes <br />Added scope line to show Phase <br />Coordination <br />2 sco e <br />Architectural Drawings <br />Dwg No <br />Description 7 <br />Remarks <br />Reason for Change <br />A002 <br />WEATHERPROOFING NOTES <br />Added "General Note" heading <br />Coordination <br />to notes <br />A011 <br />DOOR AND FRAME LEGEND AND <br />A10 - Revised dimensions for door <br />Coordination <br />IGO <br />type B/BB, C/CC & D <br />J 10 - new head detail <br />Coordination <br />A012 <br />DOOR SCHEDULE <br />Miscellaneous revisions <br />Coordination <br />A052 <br />UL RATED ASSEMBLIES - WALL AND <br />Al - Revised UL detail to most <br />Coordination <br />PARTITION <br />current version <br />A6 - Revised UL detail to most <br />Coordination <br />current version <br />A053 <br />UL RATED ASSEMBLIES - WALL AND <br />A6 - Revised UL detail to most <br />Coordination <br />PARTITION <br />current version <br />A15 - Revised UL detail to most <br />Coordination <br />current version <br />800 North Magnolia Avenue ■ Suite 600 ■ Orlando, Florida 32803 ■ 407.839.0886 ■ www.huntonbrady.com ■ #AAC001744 <br />