My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (136)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (136)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2025 11:26:50 AM
Creation date
2/28/2025 8:03:43 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Brasfield and Gorrie LLC
Building Plans - Permit #
17470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCD No. 1 Revision No. 2 Narrative <br />Project Name: FH Zephyrhills ED Expansion & Ortho Renovation <br />Project No.: H-15027.00 <br />DiVg No. <br />rip#ion <br />Remarks t <br />easd for ang. , <br />P605 <br />PLUMBING RISER DIAGRAMS - <br />Revised Piping <br />Floor Plan Changes <br />PRESSURE <br />P606 <br />PLUMBING RISER DIAGRAMS - <br />Revised Piping, Revised Plumbing <br />Floor Plan Changes <br />PRESSURE <br />fixture tag. Added Sink <br />Mechanical Drawings <br />Dwg No ` <br />Description <br />Remarks <br />Reason for Change <br />Mill <br />DEMOLITION PLAN - LEVEL 1 - <br />Revised existing piping layout. <br />Coordination <br />PHASE 1 <br />Revised ductwork to reflect <br />phasing changle. <br />Ml 12 <br />DEMOLITION PLAN - LEVEL 1 - <br />Revised ductwork to reflect <br />Coordination <br />PHASE 2 <br />phasina change. <br />M21 1 <br />DUCTWORK PLAN - LEVEL 1 - <br />Removed FCU from COMM 1019. <br />AHCA Comment <br />PHASE 1 <br />Replaced with air from central air <br />handling system. Revised <br />ductwork to reflect phasing <br />change. Rearranged notes to fit <br />on sheet. <br />M212 <br />DUCTWORK PLAN - LEVEL 1 - <br />Revised ductwork to reflect <br />PHASE 2 <br />hasin change. <br />M222 <br />DUCTWORK PLAN - LEVEL 2 - AREA <br />Removed FCU from IDF CLOSET <br />AHCA Comment <br />2 <br />2221. Replaced with air from <br />central air handling system. Re- <br />route new exhaust duct down to <br />1 st floor. <br />M231 <br />DUCTWORK PLAN - LEVEL 3 - AREA <br />Revised ductwork phasing to <br />1 <br />reflect phasin change. <br />M31 1 <br />PIPING PLAN - LEVEL 1 - PHASE 1 <br />Revised piping layout. <br />Coordinafion/AHC <br />A Comment <br />M312 <br />PIPING PLAN - LEVEL 1 - PHASE 2 <br />Revised piping layout. <br />Coordination <br />M322 <br />PIPING PLAN - LEVEL 2 - AREA 2 <br />Revised piping layout. <br />AHCA Comment <br />M501 <br />MECHANICAL SCHEDULES <br />Revised schedules. Removed <br />Coordination/AHC <br />FCU-2A-1, FCU-ED1-3, FCU-ED1-4. <br />A Comment <br />Added CV-ED-3 and CV-2A-22. <br />Electrical Drawings <br />Dwg No <br />Descriptionc <br />gen <br />E001 <br />ELECTRICAL LEGEND <br />Added a7 and d7 <br />AHCA Comment <br />E002 <br />ELECTRICAL ONE -LINE DIAGRAM <br />Adjust elevator breaker and <br />feeder <br />Submittals <br />E010 <br />OVERALL PHASING PLAN <br />Changed Phasing <br />AHCA Comment <br />E211 <br />POWER PLAN - LEVEL 1 - PHASE 1 <br />Added tamper resistant <br />rece tacles <br />AHCA Comment <br />E212 <br />POWER PLAN - LEVEL 1 - PHASE 2 <br />Revised circuiting <br />VE, AHCA <br />E222 <br />POWER PLAN - LEVEL 2 - AREA 1 <br />Removed fcu connection <br />Coordination <br />E311 <br />LIGHTING PLAN - LEVEL 1 - PHASE 1 <br />Added life safety li htin <br />AHCA Comment <br />E312 <br />LIGHTING PLAN - LEVEL 1 - PHASE 2 <br />Exit sign coordination <br />AHCA Comment <br />800 North Magnolia Avenue ■ Suite 600 ■ Orlando, Florida 32803 ■ 407.839.0886 ■ www.huntonbrody.com ■ #AAC001744 <br />
The URL can be used to link to this page
Your browser does not support the video tag.