My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (137)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (137)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 5:25:56 PM
Creation date
2/25/2025 9:28:31 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Berglund Construction
Building Plans - Permit #
2887
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1034
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdventHealth - Zephyrhills — Operating Room 8 & 9 Build Out 504-0253-000 <br />Zephyrhills, Florida <br />SECTION 012500 - SUBSTITUTION PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for substitutions. <br />1.3 DEFINITIONS <br />A. Substitutions: Changes in products, materials, equipment, and methods of construction from <br />those required by the Contract Documents and proposed by Contractor. <br />1. Substitutions for Cause: Changes proposed by Contractor that are required due to <br />changed Project conditions, such as unavailability of product, regulatory changes, or <br />unavailability of required warranty terms. <br />2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not <br />required in order to meet other Project requirements but may offer advantage to <br />Contractor or Owner. <br />1.4 ACTION SUBMITTALS <br />A. Substitution Requests: Submit three copies of each request for consideration. Identify product or <br />fabrication or installation method to be replaced. Include Specification Section number and title <br />and Drawing numbers and titles. <br />Substitution Request Form: Use facsimile of form provided in Project Manual. <br />Documentation: Show compliance with requirements for substitutions and the following, <br />as applicable: <br />a. Statement indicating why specified product or fabrication or installation method <br />cannot be provided, if applicable. <br />b. Coordination of infonnation, including a list of changes or revisions needed to <br />other parts of the Work and to construction performed by Owner and separate <br />contractors that will be necessary to accommodate proposed substitution. <br />C. Detailed comparison of significant qualities of proposed substitutions with those of <br />the Work specified. Include annotated copy of applicable Specification Section. <br />Significant qualities may include attributes, such as performance, weight, size, <br />durability, visual effect, sustainable design characteristics, warranties, and specific <br />SUBSTITUTION PROCEDURES 012500 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.