Laserfiche WebLink
AdventHealth - Zephyrhills — Operating Rooms 8 & 9 Build Out 504-0253-000 <br />Zephyrhills, Florida <br />C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or <br />others unless permitted under the following conditions and then only after providing temporary <br />utility services according to requirements indicated: <br />1. Notify Owner not less than five days in advance of proposed utility interruptions. <br />2. Obtain Owner's written permission before proceeding with utility interruptions. <br />D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and <br />vibration, odors, or other disruption to Owner occupancy with Owner. <br />1. Notify Owner not less than two days in advance of proposed disruptive operations. <br />2. Obtain Owner's written permission before proceeding with disruptive operations. <br />E. Restricted Substances: Use of tobacco products and other controlled substances on Project site <br />is not permitted. <br />F. Employee Identification: Owner will provide identification tags for Contractor personnel <br />working on Project site. Require personnel to use identification tags at all times. <br />G. Employee Screening: Comply with Owner's requirements for background screening of <br />Contractor personnel working on Project site. <br />Maintain list of approved screened personnel with Owner's representative. <br />1.11 SPECIFICATION AND DRAWING CONVENTIONS <br />A. Specification Content: The Specifications use certain conventions for the style of language and <br />the intended meaning of certain terms, words, and phrases when used in particular situations. <br />These conventions are as follows: <br />1. Imperative mood and streamlined language are generally used in the Specifications. The <br />words "shall," "shall be," or "shall comply with," depending on the context, are implied <br />where a colon (:) is used within a sentence or phrase. <br />2. Specification requirements are to be performed by Contractor unless specifically stated <br />otherwise. <br />B. Drawing Coordination: Requirements for materials and products identified on Drawings are <br />described in detail in the Specifications. One or more of the following are used on Drawings to <br />identify materials and products: <br />1. Terminology: Materials and products are identified by the typical generic terms used in <br />the individual Specifications Sections. <br />2. Abbreviations: Materials and products are identified by abbreviations published as part of <br />the U.S. National CAD Standard and scheduled on Drawings. <br />SUMMARY 011000 - 4 <br />