My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7344 Gall Blvd (4)
Zephyrhills
>
Building Department
>
Building Plans
>
7344 Gall Blvd (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 5:27:15 PM
Creation date
2/25/2025 9:35:46 AM
Metadata
Fields
Template:
Building Plans
Street #
7344
Location
Gall Blvd
Contractor
Intrastruct Tampa
Building Plans - Permit #
21056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section <br /># <br />Plumbing Rough -In Inspection <br />Complies? <br />Comments/Assumptions <br />& Req.1D <br />C404.5, <br />Heated water supply piping conforms <br />❑Complies <br />Requirement will be met. <br />C404.5.1, <br />'Ao pipe length and volume <br />❑Does Not <br />C404.5.2 <br />1 requirements. Refer to section details. <br />Observable <br />[PL6]3❑Not <br />:]Not Applicable <br />C404.5, <br />Heated water supply piping conforms <br />❑Complies <br />Requirement will be met. <br />C404.5.1, <br />to pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />'❑Not <br />Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, :Heated <br />water supply piping conforms <br />❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, 'ito <br />pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, Heated water supply piping conforms <br />❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, Ito <br />pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />❑ Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, ! Heated water supply piping conforms <br />❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, Ito <br />pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, I Heated water supply piping conforms "❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, Ito <br />pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, Heated water supply piping conforms ❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, 'to <br />pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, <br />Heated water supply piping conforms <br />❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, 'to <br />pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />Observable <br />[PL6]3❑Not <br />❑Not Applicable <br />C404.5, Heated water supply piping conforms❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, <br />to pipe length and volume <br />❑Does Not <br />C404.5.2 j <br />requirements. Refer to section details. <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, Heated water supply piping conforms ❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, <br />to pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />C404.5, T Heated water supply piping conforms !❑Complies <br />Exception: Requirement does not apply. <br />C404.5.1, <br />to pipe length and volume <br />❑Does Not <br />C404.5.2 <br />requirements. Refer to section details. , <br />❑Not Observable <br />[PL6]3 <br />❑Not Applicable <br />111 High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) <br />Project Title: BLOX - Zephyrhills Report date: 11/23/20 <br />Data filename: P:\CLNT\Retail G\07 Project Manual\COMcheck\Zephyrhills COMCheck-2020.11.13.cck Page 16 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.