Laserfiche WebLink
Section <br /># <br />Insulation Inspection <br />Complies? <br />Comments/Assumptions <br />& Req.ID <br />C303.1 <br />Roof insulation installed per <br />❑Complies <br />Requirement will be met. <br />[IN3]1 <br />manufacturer's instructions. Blown or <br />❑Does Not <br />poured loose -fill insulation is installed <br />❑Not Observable <br />;only where the roof slope is <=3 in <br />❑ Not Applicable <br />12, <br />C303.1 <br />Building envelope insulation is labeled❑Complies <br />Requirement will be met. <br />[IN10]2 :with <br />R-value or insulation certificate <br />❑Does Not <br />providing R-value and other relevant <br />❑Not Observable <br />data. <br />❑Not Applicable <br />C303.2 <br />Above -grade wall insulation installed <br />❑Complies <br />Requirement will be met. <br />[IN7]1 <br />per manufacturer's instructions. ;ODoes <br />Not <br />❑Not Observable <br />❑Not Applicable <br />C303.2, <br />Floor insulation installed per <br />❑Complies <br />Exception: Requirement does not apply. <br />C402.2.4 <br />manufacturer's instructions. Cavity or❑Does <br />Not <br />[IN9]2 istructural <br />slab insulation installed in <br />❑Not Observable <br />permanent contact with underside of <br />Applicable <br />decking or structural slabs. <br />C303.2.1 <br />Exterior insulation is protected from <br />❑Complies <br />Requirement will be met. <br />[IN14]2 <br />damage with a protective material. <br />❑Does Not <br />Verification for exposed foundation <br />❑Not Observable <br />'Foundation <br />insulation may need to occur during <br />❑Not Applicable <br />Inspection. <br />C402.2.1 ':Skylight <br />curbs are insulated to the <br />❑Complies <br />Requirement will be met. <br />[IN4]3 <br />level of roofs with insulation above <br />❑Does Not <br />deck or R-5. <br />❑Not Observable <br />❑Not Applicable <br />C402.2.1 <br />Insulation intended to meet the roof <br />❑Complies <br />Requirement will be met. <br />[IN17]3 <br />insulation requirements cannot be '❑Does <br />Not <br />installed on top of a suspended <br />ceiling. Mark this requirement <br />[:]Not Observable <br />compliant if insulation is installed <br />❑Not Applicable <br />accordingly. <br />C104 <br />Installed above -grade wall insulation "OComplies <br />See the Envelope Assemblies table for values. <br />[IN6]1 <br />type and R-value consistent with <br />❑Does Not <br />insulation specifications reported in <br />❑Not Observable <br />plans and COMcheck reports. <br />❑Not Applicable <br />C104 ; <br />Installed floor insulation type and R- <br />❑Complies <br />See the Envelope Assemblies table for values. <br />[IN8]2 'value <br />consistent with insulation <br />❑Does Not <br />specifications reported in plans and <br />Observable <br />COMcheck reports. ,❑Not <br />❑Not Applicable <br />C402.2.6 <br />Radiant panels and associated <br />❑Complies <br />Exception: Requirement does not apply. <br />[IN18]3 <br />components, designed for heat !'❑Does Not <br />transfer from the panel surfaces to the <br />❑Not Observable <br />:occupants <br />'insulated <br />or indoor space are <br />❑Not Applicable <br />with a minimum of R-3.5. <br />C402.3 <br />High-albedo roofs satisfy one of the ;OComplies <br />Requirement will be met. <br />[IN5]3 <br />following: 3-year-aged solar ❑Does Not <br />reflectance >= 0.55 and thermal <br />❑Not Observable <br />emittance >= 0.75 or 3-year-aged <br />!❑Not Applicable <br />solar reflectance index >= 64.0. <br />C402.5.1. <br />All sources of air leakage in the ❑Complies <br />Requirement will be met. <br />1 <br />building thermal envelope are sealed, ❑Does Not <br />[IN1]1 <br />caulked, gasketed, weather stripped <br />❑Not Observable <br />or wrapped with moisture vapor- <br />❑Not Applicable <br />permeable wrapping material to <br />minimize air leakage. <br />Additional Comments/Assumptions: <br />111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) <br />Project Title: BLOX - Zephyrhills <br />Report date: 11/23/20 <br />Data filename: P:\CLNT\Retail G\07 Project Manual\COMcheck\Zephyrhills COMCheck-2020.11.13.cck Page 28 of 37 <br />