My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
91-1263
Zephyrhills
>
Building Department
>
Permits
>
1991
>
91-1263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:44:27 AM
Creation date
3/23/2006 9:59:28 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
2/5/1991 12:00:00 AM
Permit #
91-1263
Building Department - Name
MILLER, JEAN
Address
5141 3RD ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Richard Back Contracting, Inc. <br />5215 Bernadette Drive <br />Zephyrhllls, FL 33541 <br />(813) 782-7277 <br /> <br />Proposal <br /> <br />DATE OF PLANS <br /> <br /> <br />Page No. <br /> <br />of <br /> <br />Pages <br /> <br />PROPOSAL SUBMITTED TO <br /> <br />PHONE <br /> <br /> <br />STREET <br />P. O. Box 253 <br />CITY. STATE AND ZIP CODE <br />~lorth in ton PA <br />ARCHITECT <br />N P. <br /> <br />16262 <br /> <br />FL <br />JOB PHONE <br /> <br />We hereby propose 10 lumish me..rials and labor necessary lor the complelion 0': <br /> <br />posal includes the following <br />model of the residence. <br />A. Installation of 5-(36Ix63")single hung windows to bp installed in front <br />porch, 2-(16I1x6311) solid pane windows to be installed next to the entry door. <br />Slock in walls to accomodate proper window installation. Wall closure to be <br />made using concrete block. Move existing front door to porch entry loc~tion. <br />Remove double windows in living room. Remove wall below windows, and install <br />a precast concrete lintel above wall opening. Remove existing entry door and <br />frame. Frame in opening to prepare for drywall. Remove single window in front <br />porch. Frame in opening to prepare for drywall. <br />B. Remove ell interior trims carefully to insure DrODer re-installation when <br />drywall complete. Remove all ceilings and wall board from interior of res- <br />idence. <br /> <br />The remodel work described below. The Pro- <br /> <br />work and materials to be provided for the re- <br /> <br />C. Remove wall between dining room and living. Install header to support as <br />needed. <br />D. Remove cabinet above existing bath tub and install a fiberglass tub sur- <br />round for existing tub. <br />E. Drywall all walls and ceilings (Excluding #2 bedroom closet). Install <br /> <br />/ <br />WE PROPOSE hereby to furnish material and labor - complete in accordance with above specifications. for the sum of: <br /> r mJ T T N II F n dollars ($ ) <br />Payment to be made as fOllOWS: <br />\ <br />'. <br />All material Is guaranteed to be as specified. All work to be completed in a sub- <br />stantial workmanlike manner according to specifications submitted, per standard Authorized <br />practices. Any alteration or deviation from above specifications involving extra Silnature <br />costs will be executed only upon written orders, and will become an extra charge <br />over and above the estimate. All agreements contingent upon strikes, accidents or Note: This proposal may be <br />delays beyond our control. Owner to carry fire, tornado and other necessary in- <br />surance. Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. <br />ACCEPTANCE OF PROPOSAL The above prices, speCifications and condl- ./7 '-_ . <br />tlons ue satiSfactory and are hereby accepted. You are authorized to do the work /) I d//~ ./ <br />as specified. Payment will be made as outline above. Silnatu~" ....../ v /l ;p c.'1 <br />Date of Acceplance: /'- y - Lj / <br /> Siln,ture <br />'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.