<br />",..--- ..
<br />
<br />l~rupu!lal
<br />
<br />Page No.
<br />
<br />1 of 1
<br />
<br />Pages
<br />
<br />"
<br />
<br />State Certified
<br />Building Contractor
<br />#CBC023221
<br />
<br />State Registered
<br />Roofing Contractor
<br />#RC0055215
<br />
<br />MILBAR CONSTRUCTION, INC.
<br />
<br />1719 North Highway 301
<br />DADE CITY, FLORIDA 33525
<br />(904) 567-6047
<br />(800) 562-2393
<br />
<br />u.S. Intec
<br />Certified Installer
<br />#5204 '
<br />
<br />Members Of Pasco
<br />Builders Assoc. &
<br />Dade City Chamber
<br />
<br />PROPOSAL SUBMITTED TO
<br />Elmer Gutekilllst
<br />
<br />PHONE
<br />813/783-2901
<br />
<br />DATE
<br />02/13/91
<br />
<br />STREET JOB NAME
<br />5850 - 13th Street Gutekunst Residence
<br />
<br />CITY, STATE AND ZIP CODE JOB LOCATION
<br />Zephyrhills, FL 33540 Same
<br />ARCHITECT DATE OF PLANS
<br />
<br />We hereby submit specifications and estimates for: ~ RE-ROOFIOO
<br />
<br />
<br />. 1. .Tear off and, haul away old roofing; clean up daily..
<br />
<br />~.
<br />3.
<br />
<br />Install new 15 lb. saturate~._~~~~,pa:per.
<br />
<br />~~~~~i;s n:~^: ~~n;~~~:w~~r~~~~ ~~~~~~S:n~h~~f;~~~l~~~~h~~:S;t~~~.
<br />
<br />Replace all damaged flashing .( valley, eaves, or ._any step ,flashing).____..
<br />
<br />_._....._-_.~~---,--
<br />'I.
<br />
<br />GAF
<br />
<br />4.
<br />
<br />5. ArlY rotten wood (roof deck, fascia, or trim) will be rep.!~~f>~i:l cost__f>~~_ba~,~~,,:,_.
<br />6. Remove old neoprene rubber boots and replace wi th new lead boots for the plumbing
<br />
<br />vents. ......-.---.".... -..-,.-.--".
<br />
<br />
<br />7. Install new pre-finished alumimnneavedrip; owner to choose color- ~or_brown..
<br />
<br />,..-.,....... -
<br />8. MilBar Construction, Inc. to provide 5 yr. warranty on workmanship.' Exclusions:
<br />storm damage, work done by others, tree damage, or structural damage toroof-deCk.-'--.,.._~
<br />
<br />9. MilBar Construction, Inc. to provide General Liability and Worker'6-Gompensation-,--,~---
<br />Insurance ($1,000,000 limit).
<br />
<br />10. Contract to include all material, labor, and re-roofing permit as stated.
<br />
<br />11. Remove and re....install lightning rods.
<br />
<br />12. Remove two turbine vents and cover holes.
<br />13. Install 30' of aluminum ridge vent.
<br />14. Remove tin and fiberglass roofing; install
<br />
<br />(). S~~ "",)iAl.4 ~ r !~ ._ H{)jC_Cc.i.L/(/g,,~',I.(__.__
<br />III" '>lzi4 51> _._~_..__
<br />
<br />plywood and shingles.
<br />
<br />JlIIt 'rnpn.Elr hereby to furnish material and labor - complete in accordance with abovespecificatipns",torthe S!J,p,,l?f:
<br />
<br />Two thousand two hillldred fifty and 00/100------------------------- dollars ($2,250.00
<br />Payment to be made as follows:
<br />
<br />) .
<br />
<br />
<br />letion.
<br />
<br />All material is guaranteed to be as specified. All work to be completed in a workmanlike
<br />manner according to standard practices. Any alteration or deviation from above specifica- Authorized
<br />tions involving extra costs will be executed only upon written orders. and will become an Signature
<br />extra charge over and above the estimate. All agreements contingent upon strikes. accidents
<br />or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Note: This proposal may be
<br />'Our workers are fully covered by Workmen's Compensation Insurance, withdrawn by us if not accepted within
<br />
<br />
<br />30
<br />
<br />days.
<br />
<br />
<br />-...".._.,.,'".....-.,,'''''.,~.~
<br />
<br />S;....,~ ~
<br />
<br />f;Sjg~~t';;re--~g;,4 ~~
<br />
<br />
<br />Acctptanct nf Jlrnpnsal- The above prices. specifications
<br />and conditions are satisfactory and are hereby accepted, You are authorized
<br />to do the work as specified. Payment will be made as outlined above,
<br />
<br />~ Date of _Acceptance:
<br />
|