My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
91-1299
Zephyrhills
>
Building Department
>
Permits
>
1991
>
91-1299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:44:21 AM
Creation date
3/27/2006 9:46:20 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
2/14/1991 12:00:00 AM
Permit #
91-1299
Building Department - Name
MRS. ROGERS
Address
38638 9TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposal COIi~ract <br /> <br />~ <br /> <br />RYmmI Construction Incorporated <br />37325 S.R. 54 W. <br />Zephyrhllls, Florida 33541 <br />(813) 782-0825. cae # 035134 <br /> <br />TO: MPS. ROGERS <br />38638 9TH AVE <br />ZEPHYRHILLS, FL 33540 <br /> <br />DATE: JANUARY 23, 1991 <br /> <br />I hereby submit spec:ItIc:ations and estinates for: <br /> <br />ENCLOSING OF GARAGE AREA TO NEW FLORIDA ROOM WHICH WILL INCLUDE THE <br />FOLLOWING: <br /> <br />1) <br /> <br />Removal of existing windows on East wall and replace with new glass with <br />a mill Finish. Aluminum awning windows of similar size. <br /> <br />2) <br /> <br />North wall to be enclosed in 2" X 2" aluminum with kick plate, one 3'0" <br />steel door with dead bolt and lock set and painted. Also as many window <br />as possible. <br /> <br />3) <br /> <br />Room to be electrically wired as per code <br /> <br />4) <br /> <br />Any necessary removal~ exp:sed wiring, conduit, and T.V. wire included. <br /> <br />Carpeting allowance of ~oo is included in this bid. <br /> <br />~ < <br />3 ~b1- 1 6; t <br />~~S vSl~r~\{) <br />~y <br /> <br />5) <br /> <br />6) <br /> <br />There is also removal of screen doors included. <br /> <br />7) <br /> <br />All materials and labor Furnished. <br /> <br />I Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: <br />FIVE THOUSAND ONE HUNDRED EIGHTY-FIVE AND 00/100---------dbllarS($ 5,185.00 <br />Pllyment to be made as follows <br />UPON COMPLETION <br /> <br />All material is guaranteed to be as specified. All work to be completed <br />in a workmanlike manner according to standard practices. Any altera- <br />tion or deviation from above specifications involving extra costs wiD be <br />executed only upon written orders. and will become an extra charge <br />over and above the estimate. <br /> <br />Authorized <br />Signature <br /> <br />Note: This proposal may be <br />withdrawn by us if not accepted <br />within <br /> <br /> <br />Acceptance of Proposal - The above prices. specifications and conditions are <br />satisfactory and are hereby accepted. You are authorized to do wor1< as specified. Pay- <br />ment will be made as outlined above. <br /> <br />Signature <br /> <br />Date of acceptance <br /> <br /> <br />Signature <br /> <br />.\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.