My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
91-1354
Zephyrhills
>
Building Department
>
Permits
>
1991
>
91-1354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:44:14 AM
Creation date
3/27/2006 2:27:10 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
3/5/1991 12:00:00 AM
Permit #
91-1354
Building Department - Name
MR & MRS A.C. STEWAR
Address
39530 LINCOLN AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ceilings. <br /> <br />20% of contract sum <br /> <br />Draw 4. <br /> <br />Ne',.,) cabinc""t~; in',:;talled. <br /> <br />iAIl painting complete and <br /> <br />new doors installed. <br /> <br />20% of contract sum <br /> <br />Dy' aw 5. <br /> <br />f\ 11 <br /> <br />f I ooy':i.. n~~ <br /> <br />comp 1 E~te. <br /> <br />All <br /> <br />plumbing fixtures <br /> <br />complete. <br /> <br />Air Conditioner complete. <br /> <br />10% of contract sum <br /> <br />Draw 6. <br /> <br />Job COlTlplet('~. <br /> <br />lOX of contract sum <br /> <br />5. Acceptance and final payment: The balance of the contract <br /> <br />price shall be due ten (10) <br /> <br />days after completion of the work <br /> <br />provided for in this contract, provided <br /> <br />thE! s..~mf.'~ shall be then <br /> <br />fully performed. Payment shall be madeon condition that a release <br /> <br />of all liens arising out of the contract has been furnished, or <br /> <br />that a receipt in full covering all labor and materials for which <br /> <br />a <br /> <br />lien could <br /> <br />bf.-'? filed, <br /> <br />or a bond satisfactory to the Owner, <br /> <br />indemnifying Owner against any liens, has been obtained. <br /> <br />GENERAL CONDITIONS <br /> <br />At"'ticle I <br /> <br />Mateyials~ appliances, employees: <br /> <br />Except as otherwise noted <br /> <br />in paragraph 1 above the Contractor shall provide and pay for all <br /> <br />materials, labor, tools,water, power and other items necessary to <br /> <br />complete the work. <br /> <br />Unless otherwise specified, <br /> <br />all materials shall be new and <br /> <br />both workmanship and materials shall be of good quality. <br /> <br />All workmen and 'sub-contractors shall <br /> <br />be skilled in their <br /> <br />trades. <br /> <br />f\rticle II <br /> <br />....., <br /> <br />Protection of work, <br /> <br />property and persons: <br /> <br />The Contractc.r <br /> <br />shall adequately protect the work, adjacent <br />I <br /> <br />property, and the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.