<br />ST ANDARD FORM OF AGREEMENT <br />BETWEEN CONTRACTOR AND OWNER <br /> <br />THIS AGREEMENT made the 13th day of m~y <br />Nineteen Hundred ani! 91 by and betweer> Goddon Ten Sr ink <br />hereinafter called the Contractor, ani! Mr - &Mre T Harold Wegner <br />Owner, Witnesseth, that the Contractor and the Owner for the considerations named agree as follows: <br /> <br />Lic. C' .~e. E043422 <br /> <br />hereinafter called the <br /> <br />ARTICLE 1. SCOPE OF THE WORK <br /> <br />The Contractor shall furnish all of the materials and perfonn all of the work shown on the Drawings and described in the Specifications <br /> <br />entitled Garaqe Addition <br /> <br />prepared by Cont.raC!t.or . , acting as and in these <br />Contract Documents entitled the Architect, and shall do everything required by this agreement, the general conditions of the Contract, the <br />Specifications and the Drawings. <br /> <br />ARTICLE 2. TIME OF COMPLETION <br /> <br />The work to be perfonned under this Contract shall be commencei! 5 days after perIDi t i $I.a.. <br />substantially completed wi t.hin 45 days. <br /> <br />gnd shall be <br /> <br />ARTICLE 3. THE CONTRACT SUM <br /> <br />The Owner shall pay the Contractor for the perfonnance of the Contract, subject to additions and deductions provided therein, in current <br /> <br />funds as follows: Nine t.housand Two hundred Fi "t.y-six. $9,256.00 <br />(State here the lump sum lllUOunt, unit prices, or both, as desired) <br /> <br />Authorized Change Orders. will be submitted by the Contractor for all work nol specifically included in this Contract. <br /> <br />ARTICLE 4. PROGRESS PAYMENTS <br /> <br />i <br />/ <br />,I <br /> <br />20% when slabe~oured= $1851.20 <br />20% when lintel::is' 'poured= $1851.20 <br />25% when shingles are layed= $2314.00 <br />20% when driveway is poured= $1851,20 <br />Final when job is completed= $1388.40 <br /> <br />(Insert here any provision made for the lllUOunt retained after the work reaches a certain stage of completion.) <br /> <br />ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT <br /> <br />Final payme~t shall be d~e -~ 5 days after substantial completio~"~(the work provided the work be then fully completed <br />and the Contract fully perfonned. ij <br /> <br />ARTICLE 6. THE CONTRACT DOCUMENTS ;f{ <br /> <br />.. <br /> <br />The General Conditions of the Contract, the Specifications and the Drawings, together with this Agreement, form the Contract, and they <br />~re as f';llly a part of the Contract as if hereto attached or herein repeated. The following is an itemization of other essential pertinent <br />mfonnation' .. <br />. 16x28 garage addition 1- 9x7 O.H.G. <br /> <br />1-23 S.H.W. A-Trusses to match existing <br /> <br />Color cre)e ext. / 14x46 driveway approx. <br /> <br />$100,00 fl.l dirt allowance Drywall ceiling <br /> <br />Block walls Insulate ceil~ng R-26 <br /> <br />Bimensional Shingles 1- Exit side door <br /> <br />;U1~q,~ 'l~f'?t~_ <br /> <br />~. Z ff4 <br /> <br />Contractor <br /> <br />.f' Harolldllegner <br /> <br />GUrdon Ten BrinK <br /> <br />SEMINOLE FORM .UI <br /> <br />,..y..ft~. <br />