<br />. <br /> <br />ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br /> <br />The Contract Documents consist of this Agreement, Conditions of the Contract (Gener3I, Supplementary and other Conditions), <br />Drawings, Specifications, Addenda issued prior to execution of this Agreement, other docwnents lisled in this Agreement and <br />Modifications issued after execution of this Agreement; these form the Contract, and are as fully a pan of the Contract as if attached <br />to this Agreement or repealed herein. The Contract represents the entire and integl'aled agreement between the parties hereto and <br />supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, <br />other than Modifications, appeat'S in Article 9. <br /> <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br /> <br />The Contr.lctor sh;,ill execute the entire Work described in the Contract Documents, except to the extent spedtkally indicated in <br />the Contract Documents to be the responsibility of others, or as follows: <br /> <br />The design and construction of an approximately <br />4500 s.f. Clubhouse described in Exhibits A & B <br /> <br />3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of <br />this Agreement. as first written above, unless a different date is stated below or provision is made for the date to be fIXed in a notice <br />to proceed issued by the Owner. <br />(lnserl lbe dule uf cummencemenl, if il differs from lbe dale of Ibis AgrftmWnl or, if Qj)pliCilble, sklle lbullbe dule /11m be fixed in a nolice 10 procl!<ed.) <br /> <br />ARTICLE 3 <br />DAn: OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br /> <br />Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the <br />Owner in writing not less than five days before commencing the Work to permit the timeJy filing of mongages, mechanic's liens <br />and other st:curity interots. <br /> <br />3.2 The Contractor sh;ill achieve. Substantial Completion of the entire Work notbter than <br /> <br />(I>~erllbe cuJendur dule ur number uf UlJendar days ufler lbe dale of com_nce_nl, Also inserl any requirementsfor<<ulier Subs'a","" Complelton of cer. <br />lai" portions uf lbe Wur., if nul slUled elsewbere in lbe Conlracl Doa",wnls.j <br /> <br />Contractor will commence the design portion of this contract within <br />three days of contract signing. Building construction will begin <br />within three days of all building and site permits issued and will be <br />completed within 150 days from this commencement. <br />, subject to adjustments of this Contract Time as provided in the Contract Documents. <br />(JUlie,., pnll'is/fII"', if u"y,/ur III/u/daled """'"IIes relutiNJIlu /ullu", 10 wmpIele on It_,) <br />If the work is not substantially complete within ~H~ time specified <br />the contractor will pay the owner $50.00 per day as liquidated damages <br />for each calender day beyond substantial completion, unless delays <br />are due to natural causes or material shortage. <br /> <br />'- <br /> <br />AlA DOCuMENT 0\101 · OWNER.CONTRACTOR AGREEMENT. TWELFTH EDITION. AlA- . C>t987 <br />THE AMUJCAN INSTITUTE OF ARCHITECTS, 17jS NEW YOIlK AVENUE, N.W., WASHINGTON, D,C. 20006 <br /> <br />A101-1887 2 <br />