Laserfiche WebLink
<br />. - <br /> <br />THE CIRCLE K CORPORATION <br />MISCELLANEOUS BID AND WORK CONTRACT <br /> <br />CIRCLE K CORPORATION INC. <br />1601 N. 7TH STREET <br />PHOENIX, AZ 85606 <br /> <br />STORE # <br />ADDRESS <br /> <br />#7130 <br />ZEPHYRHILLS, FL. <br /> <br />CONTRACT DATE <br /> <br />AUGUST 7, 1991 <br /> <br />Gentlemen: <br /> <br />For, and in consideration of FOURTEEN THOUSAND FOUR HUNDRED EIGHTY & 00/100 <br />dollars, ($14,480.00 ), the "Contract Sum" to be paid by Circle K <br />Corporation, Inc., hereinafter called "Owner", and ALAN CHEMICAL CO. <br />hereinafter called "Contractor", a person, firm or corporation duly licensed <br />as a contractor in the State of FLORIDA hereby agree to do and perform <br />the following described work in accordance with and subject to the terms and <br />conditions printed and/or written below on the attached sheet hereof: <br /> <br />1) DESCRIPTION OF WORK (hereafter the "Work") <br />LINE (~TANK(S) WITH FIBERGLASS LINING AND Crn1PLETE DOUBLEWALL PIPING <br />WITH OVERFILL/OVERSPILL DEVICE ACCORDING TO FLORIDA RULES AND REGULATIONS <br /> <br />2) DRAWINGS AND/OR SPECIFICATIONS: <br /> <br />A. O~mer shall supply the following material and equipment: <br />NONE <br /> <br />B. Manner and Time of Doing Work: <br />Contractor agrees to commence the Work within THREE days <br />after acceptance of this bid by Owner, aand complete the same in good <br />and workmanlike manner, satisfactory and acceptable to Owner, within <br />14 day(s) thereafter (the" Contract Time ") Contracotr shall be <br />responsible to Owner for faithful completion of the Work covered <br />hereby in a good and workmanlike manner in accordance with all <br />applicable Federal, State and Local laws and regulations. <br /> <br />C. Contractor warrants to the Owner that all materials and equipment <br />incorporated in the Work will be of good quality, free from faults and <br />defects. <br /> <br />D. Contractor shall pay all sales, consumer use and other similar taxes <br />and shall secure and pay for all licenses and inspections necessary <br />for the proper execution and completion of the Work. <br /> <br />E. Contractor shall,at all times,keep the premises free from accumulation <br />of waste or ~ubbish caused by his operations. <br /> <br />F. To the fullest extent permitted by law, Contractor shall indemnify and <br />hold harmless Owner and the Owners agents and employees from <br />and against all claims, damages losses and expenses. <br /> <br />G. <br /> <br />Contractor is aware of all codes and ordiances <br />authorities and has incorporated costs of compliances <br />the contract sum. <br /> <br />of governing <br />therewith into <br /> <br />H. Contractor shall complete the Work free and clear of mechanics liens <br />and, when request~d, deliver to the Owner , lien waivers and <br />satisfactory proof that all outstanding bills incurred for material <br />fu~nished or services performed have, been paid, and hold Owner <br />harmless against: all claims, liens and damages in connection <br />therewith and against all consequent eost, expense and damages. <br /> <br />I. Contract shall be governed by law of the place where the project <br />is located. <br />