My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
91-1921
Zephyrhills
>
Building Department
>
Permits
>
1991
>
91-1921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:42:07 AM
Creation date
4/11/2006 2:30:43 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
11/12/1991 12:00:00 AM
Permit #
91-1921
Building Department - Name
HALL, JESSE
Address
37126 FOXRUN CR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br />- <br />- <br />.=:=::==:=. <br />~ <br /> <br />5. Hook Sleds [HC-I 08] over the elevated part of the Pads hy twisting on from one end. (Fig 6.1. Page 16). <br />6. Carry collectors to the location of the solar array. <br />7. When they are in the proper installation position, YOll must attach panels imn "Collectnr Couples" using <br />the pla~tic panel c1amp~ as descrihed nn pa~e )1, <br />8. Take one of the "Collector-Collpk's" and snap till' hottom of the Plastic POInd Chunp (PPC) intn its <br />appropriate Sled so .hllt thl' flllt portion of till' prc sticks out thmu~h the slots llf till' Sled. (Tlw slot Is <br />lonller than till' flat Pl,rtlnn of till' pre: to allow Ii Ir vertical motion.) TIll' Sll.d IHe,) OR!. thl' Aluminum <br />Pad IHC-I031. and the rre IHC-113! art' not only dl'si!(ned to providl' anchora~l' nf till' cl.llb:tors tn the <br />In"tllllllt hill "mfllet', I hry Itl"ll illI'lw I Ill' plllll'l~ 'I Il'xl'and Ill\d l'l 'nll'ill" hIll h VNt 11'IIIIy IInd 11I,rl:llntllll", <br />9. Repeat steps #7 & #8 for the remaining "Collector-Couples" and then connect the "Collector-Couples" <br />together with a PPC as described on page 13. At this point it would he easier to snap the hottom half of <br />the PPC into the Sled before inserting the gasket and clamping the panels together. <br />NOTE: If the panels are installed on a significantly steep roof (4/12 or greater slope), the installation of <br />additional Pads, Sleds, and PPe's are required in the center of the top header of each panel. In this case, <br />the PPC will be clamped over the center welding joint of the top header. This additional anchoring will <br />prevent sagging of the headers. <br />NOTE: It is important that the 47" dimension between Pads he accurate so the Sleds will he located in <br />the center of the Pads. This will allow for maximum horizontal expansion. <br />NOTE: If you are mounting on flat tile and the tiles you are mounting to are securely fastened to the roof, <br />you can fasten the pad to the tile using AC-l2 7 tapcons. <br /> <br /> <br />FIG 6.2 <br /> <br /> <br />FIG 7.1 <br /> <br />Flexible riser tubes are snapp€d out of the spacer bars to <br />go around small obstructions. <br /> <br />Anchoring Col1ecwrs on a shinRic mof using L-Bars. <br /> <br />~ ~....... <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.