Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit <br /> <br />-.r-o <br />n. <br /> <br />2117 <br /> <br />Date .2 - ? -1".:L <br /> <br />BUILDING ELECTRICAL PLUMBING MECHANICAL Sewer Conn <br /> <br />Pwpe,ty Owne' a~.::: Z~-- ~:::::::.~,. <br />JObAddress:~__---=-_ :-~'- T,I.F. s. <br />Parcell.D. # <br /> <br />Zoning: <br />Description of Work <br /> <br />. Energy Code: =t, Radon Gas: <br /> <br />{;~.LA..d ( ~AA~ ~ /9?:J~ <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br /> <br />DATE <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />c.o. <br /> <br />DATE <br /> <br />Inspector <br /> <br />Pe,m;, Fee~ -Y- <br />Signature _ _ ~ <br />Company <br />Address <br />Telephone# <br /> <br />Valuation or <br />Contract Price <br /> <br />~A- <br /> <br />City License Registration # <br />State Certified License# <br /> <br />("l/h4/l 1L~f/ fR~ct~rr4V' l L~ I <br /> <br />BUILDING <br /> <br />ELECTRICAL <br /> <br />PLbMalNG <br /> <br />M~AL <br />--- <br /> <br />Tp, Serv. <br />Rough In <br />Meter Can <br />Const, Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM, <br />Insul. CL <br />WL <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Breakers <br /> <br />Ducts Insl. <br /> <br />Compressor <br />f=inal <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15,00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction, <br />c, Repairs or corrections not made when inspection called, <br />d. Work not ready for inspection when called. <br />e, Permit not posted on job site. <br />f, Plans not at job site, <br />g, Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same, <br />