Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788.6611 <br />d.-O . ffD dlS: trD <br /> <br />~~n~ PLUMBING <br /> <br /> <br />P,"perty Owne' )?/ 11~ ~~~~ <br />Job Address: 3 i 3// - /Jo~ <br />Parcell.D, # / J - ~ b . J-) - 0 0 / o.~ CJ &, 66 ()- 0/..3 0 <br /> <br />Permit <br /> <br />N~ <br /> <br />2273/1 <br /> <br />DatE! <br /> <br />~- /6 - ;?c:L <br /> <br /> <br />Water Conn: <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />Zoning: Energy Code: <br />Description of WOrk~4'f.J A-/ c:- <br /> <br />Radon Gas: <br />...AAH~ <SI'-e/)~~ <br /> <br />.r ~/?LfJ2- <br />(j <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br />C.O. <br /> <br /> <br />DATE <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />DATE <br /> <br />Inspector <br /> <br />Permit Fee <br />Signature <br />Company <br />Address <br />Telephone# <br /> <br />,/--5. -: t7f.) <br />~r/.d~-C <br />/' <br /> <br />--- <br /> <br />Valuation or <br />Contract Price <br /> <br />/ 7 cr--z; - r-..J-v <br />,/ <br /> <br />City License Registration # 7?' <br />State Certified License# <br /> <br /> <br />Driveway <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />S~~'(t. ~b-u:.... <br /> <br />q../7-1Z f-r6 <br /> <br />Breakers <br /> <br />Ducts Ins!. <br /> <br />Compressor <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />