My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
92-2520
Zephyrhills
>
Building Department
>
Permits
>
1992
>
92-2520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:56:00 AM
Creation date
4/24/2006 10:38:29 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
7/10/1992 12:00:00 AM
Permit #
92-2520
Building Department - Name
H R INTERSTATE
Address
6106 RIDGEWAY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STAN,DARD FORM OF AGREEMEN'T <br />BETWEEN CONTRACTOR AND Owr~ER <br /> <br />-/ <br />THIS AGREEMENT mod. tho~~ ~ .r -:1f'i'l <br />Nineteen Hundred an..! N/N, ,~ '. by and between req '& <br />hereinafter called the Contractor, an ~rt:!:' <br />Owner, Witnesseth, that the Contractor and the Owner for the considerations named agree as follows: <br /> <br />In the year <br /> <br />hereinafter called the <br /> <br />ARTICLE 1. SCOPE OF THE WORK <br /> <br />entitled <br /> <br />prepared by <br />Contract Documents entitled the Architec , <br />Specifications and the Drawings. <br /> <br /> <br />and perfonn all of the worlc shown n the Drnwings ;ln~ described in the Specifications <br />t, -Si. -5 W; f <br /> <br />Q..,. , actinl< as and in these <br />and shall do everything required by this agreement, the general conditions of the Contract, the <br /> <br />ARTICLE 2. TIME OF COMPLETION l <br />The worlc to be perfonned under this Contract shall be commenced f1') ~:()n 0.<; ({.rll\'[+~ \-t Q.l e(; ec.\ <br />substantialIy completed W 1m J NON S- /...L.f-.P k <br /> <br />Rnd shall be <br /> <br />ARTICLE 3. THE CONTRACf SUM <br />The Owner shall <br />funds as follows. <br /> <br /> <br />deductions rnJ\;ded therein, in current <br />/t/t}~tJO <br /> <br />Authorized Change Orders will be submitted by the Contractor for all worlc not specifically included in this C.ontract, <br />ARTICLE 4. PROGRESS PAYMENTS <br /> <br />(Insert he..., any provision made Cor the llD1oun! ...,ta1ned after the worle reaches a =rtain Itage of comp;':"",,) <br /> <br />ARTICLE 5. ACCEPTANCE AND FINAL PAYME.."'T <br /> <br />Final payment shall be due ---r]+H'" day, ~ substantial completion of the worle provided the ....-on:: be then fully completed <br />and the Contract fully pcrf?,nned. <br /> <br />ARTICLE 6. THE CONTRACf DOCUMENTS <br /> <br />The ~ncral Conditions of the Contrac.tJ the Specifications nnd the Drawings, together with this Agreement, fOIT:1 the Contract, and they <br />~e as f';llly a part of the Contract as u hereto attached or herein repeated. The following is an itemization 0: other essential pertinent <br />mformation: <br /> <br /> <br /> <br />\\\\11111I11/111// <br />~,\\\\ t ELLI'III~ <br />~ ~\ ......... O~ ~ <br />" ".r.o TA '. "'J. "" <br />~ q'\.~O ~':"o" ~ <br />;:;: .- ,__ r. ~ <br />::: .- .. ~ <br />::: : : i <br /> <br />s..0I FiC.tda <br />-llrll~ ,,_res <br />
The URL can be used to link to this page
Your browser does not support the video tag.