Laserfiche WebLink
<br /> <br />Charles A. Black <br />Chairman, Crystal River <br />Roy G. Harrell. Jr. <br />Vice Chairman, St. Petersburg <br />Sally Thompson <br />Secretary, Tampa <br />Joe L. Davis. Jr. <br />Treasurer, Wauchula <br />Ramon F. Campo <br />Brandon <br />James L. Cox <br />Lokeland <br />John T. Hamner <br />Bradenton <br />Curtis L. Law <br />Land 0' Lakes <br />James E. Martin <br />St, Petersburg <br />Margaret W. Sistrunk <br />Odessa <br /> <br />Peter G. Hubbell <br />Executive Director <br />Mark D. Farrell <br />Assistant Executive Director <br />Edward B. Helvenston <br />General Counsel <br /> <br />Excellence <br />Through <br />Quality <br />Service <br /> <br />Southwest Florida <br />Water Management District <br /> <br />2379 Broad Street (U,S, 41 South) Brooksville, Florida 34609-6899 <br />Phone (904) 796-7211 or 1-800-423-1476 SUNCOM 628-4150 <br /> <br />August 26, 1992 <br /> <br />Leon Gordon <br />5039 First Street <br />Zephyrhil1s, FL 33541 <br /> <br />Subject: <br /> <br />PROJECT EVALUATION - 0765.0 <br />Maine-1y New England Restaurant - Asphalt Pavement at existing <br />grade over existing limerock base; <br />Sec/TWP/Rge: 10/26S/21E; Pasco County <br />Latitude 28013'50"; Longitude 82011'24" <br /> <br />Dear Mr. Gordon: <br /> <br />The Southwest Florida Water Management District is responsible for <br />protecting the water resource and its related envirorunent for the citizens <br />of the District. The District Governing Board has adopted permitting <br />requirements designed to conserve water resources, preserve water quality, <br />protect wetlands and reduce flooding. <br /> <br />We have received and reviewed your submittal for the project referenced <br />above. Pursuant to Chapter 40D-4, Florida Administrative Code, (F.A.C.), <br />a permit will not be required for the proposed asphalt pavement (for <br />reference see Chapter 40D-4.021(7), F.A.C., and Chapter 40D-4.041(1), <br />F.A.C.). <br /> <br />Plans and information submitted will be kept on file and referenced in <br />support of this opinion. <br /> <br />Please be reminded that all practicable and necessary effort should be <br />taken during construction to control and prevent erosion and transport of <br />sediments downstream. <br /> <br />. <br /> <br />If I can be of further a~sistance, please contact me at extension 4329. <br /> <br /> <br />Supervisor <br />Department <br /> <br />WMM:ca1 <br />cc: Project Evaluation File <br />Kenneth Barrett, P.E., Enforcement Supervisor <br />Sharon Vance, Enforcement Field Technician <br />Source: Letter <br />B8:6/92 <br />