Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit <br /> <br />N<! <br /> <br />2688-8 <br /> <br />Date /~ '- cf - 7 cl- <br /> <br />~~ <br />I~'~~ <br />::::~,~:~e'7J;;: oJ od;;;;' J;~~ ))L-' <br /> <br />Parcell.D. # 3_<;-'" d-.--5. - - ;)...../ - 6-A- - CJ-- <br /> <br />EL~ <br /> <br />PLuMBiNG---- M ECHANTc:ttt--Sewer Conn <br /> <br />Water Conn: <br /> <br />Water Meter: <br />T,I.F.'s; <br /> <br />Zoning: ~::pcode: <br />Description of Work -h / CJ X I d- <br /> <br />Radon Gas: <br /> <br />FINAL <br /> <br /> <br />DATE <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. C.O. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />Inspector <br /> <br /> <br />per~~~ ~ <br />Sign ~~ ~ <br />Company <br />Address <br />Telephone# <br /> <br />Valuation or <br />Contract Price <br /> <br />9cT3J,~ <br /> <br />City License Registration # <br />State Certified License# <br /> <br />~ <br /> <br /> <br /> <br /> <br />M <br /> <br /> <br />" <br /> <br />Breakers <br /> <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br /> <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />