My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
92-2708
Zephyrhills
>
Building Department
>
Permits
>
1992
>
92-2708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 9:55:26 AM
Creation date
4/26/2006 2:20:21 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Building Department - Date
10/16/1992 12:00:00 AM
Permit #
92-2708
Building Department - Name
GIBBS & MCALUANAGH
Address
5313 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposal Contract <br /> <br />~ <br /> <br />INVOICE <br /> <br />Rynron Construction Incorporated <br /> <br />37325 S.R. 54 W. <br />. Zephyrhills, Florida 33541 <br />(813) 782-0825. CBC # 035134 FAX (813) 788-6773 <br /> <br />TO: GIBBS & McALVANAGH / Century 21 (BIIL NYE) - Gloria Brown <br />37818 STATE ROAD 54 WEST <br />ZEPHYRHILIS, FL 33541 <br />(813) 782-2002 <br /> <br />DATE: 10-7-92 <br /> <br />'-.";':'7- <br /> <br />RE: Law Offices <br /> <br />I hereby submit specifications and estimates for: repair of damage as follows: <br /> <br />1.) Excavate under North corner of building and in approximately 12' on Northeast <br />corner. Pour 3000 p.s.L concrete under existing' foundation to support "building. <br />Building to be raised on this corner as much as possible to eliminate any furthC'l~ <br />settling. Tie beam also formed and poured on top of North wall. Includes 5/8" <br />steel rebar dowelled into existing building. All poured beams to include 3000 <br />p.s.i. concrete. <br />TOTAL BID: $ 3600.00 <br />2.) Remove and replace existing built-up roof. Replace with new 15 lb. 2-ply base <br />sheeting followed by 3-ply built-up fiberglass and hot tar rOOfing. Roofing <br />to ~ coat~d with fibered emulsion roof coating. followedfiwith Ka~.~~oof <br />coatlng. Flve year leak warranty. :..1 """-:;).E;CO ~ ~.' <br />TOTAL BID: . $ -6-700 _ 00 ' -L- . <br />3.) Replace and repair entire West interior wall as needed with new paneling, trim, <br />insulation, and base. <br /> <br />TOTAL BID: $ 2900.00 <br /> <br />I Propose hereby to furnish material and labor - complete in accordance wi <br />SEE-ABOVE Jv\...L ~ <br />Payment to be made as follows <br /> <br /> <br />~. <br /> <br />" 't-?l.?-j <br /> <br />--:::::::.- <br /> <br />All material is guaranteed to be as specified. All work to be completed <br />in a workmanlike manner according to standard practices. Any altera- <br />tion or deviation from above specifications involving extra costs will be <br />executed only upon written orders, and will become an extra charge <br />over and above the estimate. <br /> <br />- \ OUi:'/)) <br /> <br />Acceptance of Proposal - The above prices. specifications and conditions are <br />satisfactory and are hereby accepted. You are authorized to do the work as specified. Pay- <br />ment will be made as outlined above. <br /> <br />Signature <br /> <br />~ <br /> <br />Date of acceptance <br /> <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.