Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />------'" <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit <br /> <br />N? 2761.8 <br />//-S-9:; <br /> <br /> <br />Date <br /> <br />Property Owner: <br />Job Address: <br />Parcell.D. # <br /> <br />~-~-- <br />'/J1~. Q~:,S <br />7//1_" ~4~~Y <br /> <br />M~- Sewer Conn <br />Water Conn: <br /> <br />Water Meter: <br />T,I.F.'s: <br /> <br />Zoning: <br />Description of Work <br /> <br />E~de <br /> <br />..,... <br /> <br />~ Radon Gas: <br /> <br />(1"- a.; )0//1) s.a-~~~ <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br /> <br /> <br />2- <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. C.O. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />DATE <br /> <br />Valuation or ~ <br />Contract Price "'~ /00' - <br /> <br /> <br />C;ty Ucen.e Reg;.',.';on' .~ c:::? (i()~ <br /> <br />State C rtified License _ _ _ /) <br /> <br />Permit Fee <br />Signature <br />Company <br />Address <br />Telephone# <br /> <br /> <br /> <br /> <br /> <br />MEC <br /> <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM, <br />Insul. CL <br />WL <br /> <br />Tp, Servo <br />Rough In <br /> <br />Meter Can <br /> <br />Const, Pole <br />Pool <br /> <br />Pre-Meter <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Breakers <br /> <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />Driveway <br />1:;f,~ 0 114- 9t t.1 <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15,00) shall be made for each trip for each trade: <br /> <br />a, Wrong Address <br />b, Condemned work resulting from faulty construction, <br />c, Repairs or corrections not made when inspection called. <br />d, Work not ready for inspection when called, <br />e. Permit not posted on job site, <br />f. Plans not at job site, <br />g, Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same, <br />