Laserfiche WebLink
<br />Perm:i.t No. <br />Project Name: <br />Page <br /> <br />4810688.00 <br />Bedi Professional Offices <br />2 <br /> <br />() For. systems utilizing effluent filtration or exfiltration, the <br />inspections shall be performed 18 months after operation is <br />authorized and every 18 months thereafter. <br />(X) For systems utilizing retention and wet detention, the inspections <br />shall be performed two (2) years after operation is authorized and <br />every two (2) years thereafter. <br />() For systems utilizing effluent filtration or exfi1tration and <br />retention and wet detention, the inspections shall be performed 18 <br />months after operation is authorized and every 18 months thereafter. <br /> <br />4. Refer to LIMITING CONDITION No.4 herein. <br /> <br />LIMITING AND STANDARD CONDITIONS <br /> <br />1. The Permittee shall comply with the attached Limiting and Standard <br />Conditions which are attached hereto, incorporated herein by reference as <br />Exhibits "A" and "B" respectively and made a part hereof. <br /> <br /> <br />~~d1f:ature <br /> <br />Rev. 1/92 <br />