Laserfiche WebLink
<br />------ <br /> <br />.r~__~~ 1}1~f(E:f-~ <br />.GUDE <br />BROS. <br />CONSTRUCTION <br /> <br /> <br />. 'J/ a f)~-r:& <br />~Jr /7\ /::f~fJ,;.v-~ ' <br />{fur-- ~'L; ...:2J>I'2 <br />_q'~ r 11P.5. <br /><-;tJ~' <br />'EiJtb~TEEL BUILDINGS <br />666 <br />(904) 588-2750 <br />I~J~ <br />----- <br /> <br />July 1, 1993 <br /> <br />Dr. Hasan Hashmi <br />6719 Gall Boulevard <br />Suite 203 <br />Zephyrhills, FL 33541 <br /> <br />iA 6av: ~~O.zL7l1~& ~.(2k. <br /> <br />Dear Dr. Hashmi: <br /> <br />We Propose to furnish materials and labor for renovations to the Banlett <br />Bank nuilding in Zephyrh:il] s, [0'.1 orilla as follows: <br /> <br />1. Install particians using metal studs 16" on center as per sketch and tape <br />on floOL <br /> <br />2. Install 3 ] /2" insulation in all new walls for sound deadening. <br /> <br />.1. Install 5/8" dry\vall on both sides with orange peel finish. <br /> <br />4. Install stain grade birch solid core doors as shown in hollow metal frames. <br /> <br />5. All locks to be A.D.A. approved, lever type as per code, if required by <br />city. <br /> <br />~. <br /> <br />6. Demolition to be as follows: <br />A. Remove teller and Drive-thru cabinets. <br />B. Cut opening in wall at kitchen for new door. <br />C. Remove shelves and sillk in utility room. <br />D. Remove concrete and other miscellaneous items from automatic teller <br />room. <br />E. Cut off all unused pipes, conduit, wires, and miscellaneous to floor <br />level. <br />F. Remove all items from wall on outside where teller machine had been. <br />G. Remove wall covering from teller area. <br /> <br />7. Box around water heater in utility room. <br /> <br />8. Frame opening '1here vault door is removed for wood door. <br /> <br />9. Replace damaged ceiling tile using tile from one room. New tile to be <br />installed in room where tile is removed. <br /> <br />10. PAINTING: <br />A. New drywall to have two coats of latex. <br />B. Old utility room, new room formed by wall at kitchen, and automatic <br />teller room and teller area walls.... to receive one coat of latex. <br />C. New doors to receive clear sealer and clear finish coat. <br />D. Paint one coat latex on exterior portion of wall that has regular <br />stucco. <br />