Laserfiche WebLink
<br />~ . <br /> <br />. , <br /> <br />ELEVATION CERTIFICATE <br /> <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br />NATIONAL FLOOD INSURANCE PROGRAM <br /> <br />ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to <br />provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to <br />determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LaMA or LOMR). <br />Instructions for completing this form can be found on the following pages. <br /> <br />a.M8. No 3067.0071 <br />Expires Mdy31. 7993 <br /> <br />SECTION A PROPERTY INFORMATION <br /> <br />,OOR INSURANCE COMPANY USE <br /> <br />BUILDING OWNER'S NAME <br />G-~ A-CLC 0 t+O tJ t <br /> <br />~OLlCY NUMBER <br /> <br />STREET ADDRESS (Including Apt., Unit. SUite and/or Bldg, Number) OR P.O ROUTE AND BOX NUMBER <br />~\ ~DS \Nc:.C~WOO~ U~\v-c:... <br />OTHER DESCRIPTION (Lot and Block Numbers, otc,) <br />t D ' 2.\c;:> . z..t - c> \. 20 - 60C;JOO - Cl., 3 0 <br />CITY <br />--='e.-p I-ty rch ~ L l s. <br />I <br /> <br />:OMPANY NAIC NUMBER <br /> <br />r-\ . <br /> <br />STATE <br />~ ~~~\ <br /> <br />ZIP CODE <br /> <br />SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION <br /> <br />Provide the following from the proper FIRM (See Instructions): <br /> <br />1. COMMUNITY NUMBER 2, PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5, FIRM ZONE 6. BASE FLOOD ELEVATION <br /> A~ (in AO Zones. use depth) <br />/20235 OtJOS c.... DGC. I~ /9!!J j 8..5 <br /> <br />7, Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): NGVD '29 L_J Other (describe on back) <br />8, For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, indicate <br />the community's BFE: !, U feet NGVD (or other FIRM datum-see Section B, Item 7), <br /> <br />SECTION C BUILDING ELEVATION INFORMATION <br /> <br />1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best <br />describes the subject building's reference level L ' <br />2(a), FIRM Zones A 1-A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram is at an elevation <br /> <br />of Ll~J8IG! ,i cj feet NGVD (or other FIRM datum-see Section B, Item 7), <br /> <br />(b), FIRM Zones V1-V30, VE, and V (with BFE), The bottom of the lowest horizontal structural member of the reference level from <br /> <br />the selected diagram, is at an elevation of L--.LlJ~ ,U feet NGVD (or other FIRM datum-see Section B, Item 7), <br /> <br />(c), FIRM Zone A (without BFE), The floor used as the reference level from the selected diagram is . ~_~. ___ feet above_ or <br /> <br />below (check one) the highest grade adjacent to the building, <br /> <br />(d), FIRM Zone AO, The floor used as the reference level from the selected diagram is ,U feet a80ve '~ or below == (check <br />one) the highest grade adjacent to the building, If no flood depth number is available, is the buildings lowest floor (reference <br /> <br />level) elevated in accordance with the community's floodplain management ordinance? Yes = No !J Unknown <br /> <br />3, Indicate the elevation datum system used in determining the above reference level elevations: ~NGVD '29 I , Other (describe <br />under Comments on Page 2), (NOTE: If the elevation datum used in measuring the elevations is different than that used on <br />the FIRM [see Section B, Item 7J, then convert the elevations to the datum system used on the FIRM and show the conversion <br />equation under Comments on Page 2.) <br /> <br />4. Elevation reference mark used appears on FIRM: 0 Yes 0-No (See Instructions on Page 4) <br /> <br />5, The reference level elevation is based on: G1' actual construction 0 construction drawings <br />(NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place. in which <br />case this certificate will only be valid for the building during the course of construction, A post-construction Elevation Certificate <br />will be required once construction is complete.) <br /> <br />6, The elevation of the lowest grade immediately adjacent to the building is: I_LL_~J,sr,!?J feet NGVD (or other FIRM datum-see <br />Section B, Item 7), <br /> <br />SECTION 0 COMMUNITY INFORMATION <br /> <br />1. If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C, Item 1 <br />is not the "lowest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest <br /> <br />floor" as defined by the ordinance is: L..I I I I ], U feet NGVD (or other FIRM datum-see Section B, Item 7), <br />2. Date of the start of construction or substantial improvement d /12/ 9 3 , <br />. <br /> <br />FEMA Form 81-31, MAY 90 <br /> <br />REPLACES ALL PREVIOUS EDITIONS <br /> <br />SEE REVERSE SIDE FOR CONTINUATION <br />